Laserfiche WebLink
City of Everett <br /> Name: Bob Leonard <br /> Title: Director of Parks and Facilities <br /> Address: 802 E. Mukilteo Boulevard <br /> City: Everett, WA 98203 <br /> Phone: 425.257.8335 <br /> Email: bleonard@everettwa.gov <br /> SECTION 4. INDEMNIFICATION <br /> 4.1 Each party agrees to and shall defend,indemnify, and hold harmless each respective party, <br /> its officials, officers, agents,and employees from and against any and all claims, losses, damages, <br /> judgments, or liabilities of whatever nature, including any portion thereof, arising from or related <br /> to the indemnifying party's acts,omissions,or performance under this Interlocal Agreement. Each <br /> party's obligations herein shall be limited to the extent of the liability attributable to said party. <br /> 4.2 This section shall survive termination of this Interlocal Agreement. <br /> SECTION 5. INSURANCE <br /> 5.1 Each party agrees to maintain liability insurance or self-insurance to cover claims, losses, <br /> damages,judgments, or liabilities arising from their own acts, omissions, or performance under <br /> this Interlocal Agreement or those of its officials, officers, agents, and employees. The Port will <br /> require that the City and County be named as additional insureds on all liability insurance policies <br /> required to be maintained by Project contractor(s) under the Project construction contract(s). <br /> SECTION 6. TERMINATION <br /> 6.1 This Interlocal Agreement may not be terminated by any Party. If the Grant is funded and <br /> the Port enters into a grant contract for this Project, this Interlocal Agreement is valid for the <br /> duration of the use of the Grant funded facilities constructed as required by the grant contract and <br /> regulations related thereto. <br /> SECTION 7. GENERAL INTERLOCAL AGREEMENT PROVISIONS <br /> 7.1 The Parties will not form a separate entity to carry out the purposes of the Interlocal <br /> Agreement. The Port shall be the administrator of the interlocal cooperative undertaking with <br /> authority, including but not limited to, undertaking Project planning, design, engineering, <br /> permitting, construction and ongoing maintenance and stewardship activities for the Project. The <br /> Port shall periodically report to the County and the City on mutually acceptable intervals and <br /> provide reasonable documentation so that the County and the City are informed. The Port will <br /> also respond to inquiries made by the County and/or the City about the interlocal cooperative <br /> undertaking. <br /> 7.2 Property that is acquired as a result of the Interlocal Agreement will be held in the name of <br /> all three Parties unless it is determined and agreed by all three Parties that it should be held in the <br /> 4 <br /> BNC\03221\0065\01021319.v1 <br />