Laserfiche WebLink
WASH Il,rit[)7rttAri tic -tlt5I I 0 *PC aria ..b.. to ILA <br /> Recreation and Project Application Repo <br /> Conservation Office <br /> Project#18-2524, Jetty Landing Restroom Development <br /> Current Status:Application Submitted <br /> Project Details <br /> >rimary Sponsor: Port of Everett Primary Contact: Nancy Overton <br /> (425)388-0607 <br /> nancyo@portofeverett.com• • <br /> unding Program: Boating Facilities-Local - <br /> Project Type: Development <br /> Project Description <br /> fhe Port of Everett will use this grant to construct a new restroom facility at Jetty Landing Park and Boat Launch,located at the end of 10 th Street.Grant funds will be used <br /> br permitting,design,and development of the new restroom facility as well as demolition of the existing restroom.The new restroom will be a CXT style prefab concrete <br /> acility approximately 40'x 26'in size.Additional scope elements will include landscaping,sidewalks,improved ADA access,two new entrance signs and the installation of <br /> security lighting.The primary recreation opportunity provided by the project will be improved and updated support facilities for recreational boaters,The current restroom <br /> wilding was built in 1982 with IAC BFP grant funding assistance to serve the boat launch and adjacent park,which includes picnic facilities,guest docks,and a public frshir <br /> )ier.At the time,the boat launch consisted of only 6 launch lanes.Today the outdated and undersized restroom continues to serve the park and boat launch which now <br /> :onsists of 13 lanes and is the largest public boat launch in western Washington.The restroom building serves more than 50,000 people annually. <br /> Project Overall Metrics (Outcomes, Benefits) <br /> Category/Work Type I Metric Application Answer <br /> Sites Improved <br /> Project acres developed 0.12 <br /> Project acres renovated 0.12 <br /> Completion Date <br /> Projected date of completion 12/31/2021 <br /> Project Funding <br /> Funding Request Funding% Min Match Required Sponsor Match Source <br /> Boating Facilities-Local(FY2020) $584,500 74.69% Appropriation 1 Cash $198,063 <br /> Sponsor Match $198,063 25.31 % 25% <br /> Total Project Funding $782,563 100.00% <br /> Project Cost Summary Project% Admin/A&E% Maximum for Selected Program <br /> DEVELOPMENT COSTS $1,000,000 <br /> Development $719,588 <br /> A&E $62,975 8.75% $143,918(20%) <br /> Subtotal $782,563 100.00 <br /> Total Cost Estimate $782,563 100.00% <br /> Worksites and Properties <br /> General Area: Jetty Landing,Port of <br /> Everett <br /> County: Snohomish <br /> Legislative Districts 2012: 38 <br /> Congressional Districts 2012: 02 <br /> Sections: 18 <br /> Township: T29NRO5E <br /> Coordinates: 48.00408646 <br /> -122.22089740 <br /> Worksite #1 : Jetty Landing <br /> Coordinates from Mapped Point: Latitude: 48.00408646 Longitude: -122.22089740 <br /> Coordinates from Worksite Latitude: Longitude: <br /> Directions: <br /> Norksite Description: The project will replace an existing restroom building located on the east side of a public park,to the south of the launch lanes.Activities include <br /> lemolition,construction and utility work. <br />