Laserfiche WebLink
into 10th St. <br /> Norksite Address: <br /> i20 10th Street <br /> iverett,WA 98201 <br /> Development Metrics (Outcomes, Benefits) <br /> Category/Work Type/Metric Application Answer Work Type Cost <br /> Buildings and Structures <br /> Construct!install restroom <br /> Total cost for Construct/install restroom $500,780.0 <br /> Number of restrooms 12 new,0 renovated <br /> Select the restroom type Restroom <br /> Provide the square feet of each restroom (2)family style @ 100 sf each(2)ADA stalls @ 60 sf each(8)stalls <br /> @ 18 sf each(2)urinals <br /> General Site Improvements <br /> Develop circulation paths or access routes <br /> Total cost for development of circulation paths or access routes $59,850.0 <br /> Enter length of circulation paths and routes by surface type-Asphalt 170 <br /> Minimum width of the circulation paths or access routes 36 <br /> Lighting provided(yes/no) Yes <br /> Install lighting(general security) <br /> Total cost for Install lighting(general security) $12,067.0 <br /> Number of general security lights installed 2 <br /> Install signs/kiosk <br /> Total cost for Install signs/kiosk $6,033.0 <br /> Number of kiosks 0 new,0 renovated <br /> Number of interpretive signs/displays 0 new,0 renovated <br /> Number of permanent entrance signs 2 new,0 renovated <br /> Project involves installation of informational signs(yes/no) Yes <br /> Install site furnishings <br /> Total cost for Install site fumishings $3,620.0 <br /> Select the site furniture/amenities Benches,Recycling/Trash receptacles <br /> Landscaping improvements <br /> Total cost for Landscaping improvements $24,134.0 <br /> Acres of landscaped area 0.04 <br /> Select the landscape features Groundcover,Irrigation,Native vegetation,Trees/shrubs <br /> Site Preparation <br /> General site preparation <br /> Total cost for General site preparation $80,970.0 <br /> Acres of site preparation 0.12 <br /> Buildings/structures to be demolished Restroom-37 years <br /> Select the site preparation activities Demolition,General site prep activities,Mobilization,Surveying, <br /> Traffic control <br /> Utilities <br /> Install communication utilities <br /> Total cost for Install communication utilities $3,017.0 <br /> Select the communication utilities Phone,Wireless intemet <br /> Install power utilities <br /> Total cost for Install power utilities $12,067.0 <br /> Select the power utilities General service connection,Relocate/bury power utility <br /> Install sewage system <br /> Total cost for Install sewage system $3,620.0 <br /> Number of dump stations 0 new,0 renovated <br /> Select the sewer utilities Sewer connection <br /> Install stormwater system <br /> Total cost for Install stormwater system $2,413.0 <br /> Select the stormwater utilities Catch basins,Stormwater line <br /> Install water system <br /> Total cost for Install water system $3,017.0 <br /> Select the water utilities Water meter,Water service connection <br /> Cultural Resources <br /> Cultural resources <br /> Total cost for Cultural resources $2,500.0 <br /> Acres surveyed for cultural resources 0.12 <br /> Permits <br />