Number of permits required for implementation of project 3
<br /> Architectural&Engineering
<br /> Architectural&Engineering(A&E)
<br /> Total cost for Architectural&Engineering(A&E) $62,975.0
<br /> Development Questions
<br /> 1 of 7 Is the worksite(s)located within an existing park,wildlife refuge,natural area preserve,or other recreation or habitat site?If yes,name the area
<br /> and specify if the land is owned by local,state or federal government.
<br /> Yes,The building is located within the Jetty Landing Boat Launch area,adjacent to the Jetty Landing Park,in Everett.The property is owned jointly by the Port
<br /> of Everett,the City of Everett,and Snohomish County.
<br /> 2 of 7 Identify the source of funds(i.e.federal grant,Conservation Futures,local appropriations,private land donation,etc.)that was originally used tc
<br /> acquire the property.
<br /> The property was originally acquired with grant funding from the RCO(IAC)under the Boating Facilities Program(Agreement#72-068)and local funding from
<br /> the Port,the City,and the County.
<br /> 3 of 7 Cultural Resources:Has the worksite been investigated for historical,archeological,or cultural resources?If yes,when did this occur and wha
<br /> agencies and tribes were consulted?Attach related documents(letters,surveys,agreements,etc.)to your project in PRISM.
<br /> No
<br /> 4 of 7 Describe existing worksite site conditions.The answer to this question will be used in cultural resource consultation so please provide detailec
<br /> information.
<br /> The original site consisted of tidelands,which were filled in to provide an upland area for the parking lot,restroom building,and park.
<br /> 5 of 7 Cultural Resources:Describe any proposed ground disturbing activities that will take place as part of your project.This includes work
<br /> conducted by hand or mechanized tools.Provide specific information including length,width,and depth of the ground disturbance.Ground
<br /> disturbing work includes all restoration activities,geotech,fencing,demolition,etc.Avoid subjective phrases such as"ground disturbing
<br /> activities will be minor".
<br /> Ground disturbing activities will include building demolition,foundation work,and possible utility trenching.The details of the ground disturbing activities are nc
<br /> yet available.
<br /> 6 of 7 Give street address for this worksite if available.
<br /> 620 10th Street,Everett,WA 98201
<br /> 7 of 7 Cultural Resources:Are there any structures existing on the property(including tidegates,dikes,residential structures,bridges,rail grades,
<br /> etc.)?If so,please list all existing structures.Indicate if any of these structures will be altered or demolished as a result of the project,and
<br /> provide the following for each structure that could be altered or demolished:identifying name,year constructed,year(s)remodeled/renovated.
<br /> Attach at least one photo of each altered structure.
<br /> Yes,The existing restroom building will be demolished.This building was built in 1982.
<br /> Property for Jetty Landing Worksite #1: Jetty Landing
<br /> 4ctivity: Development
<br /> Landowner Control and Tenure
<br /> Port of Everett Instrument Type: Sponsor owned property(deed)
<br /> PO Box 538 Purchase Type:
<br /> Everett,WA 98206-0538 Term Length: Perpetuity
<br /> Expiration Date:
<br /> Landowner Type: Local Government Note:
<br /> Overall Project Questions
<br /> 1 of 18 Does the project site or project boundary lie within the urban growth area boundary of a city or town with a population of 5,000 or more?If yes,
<br /> name the community and attach one map called Population Proximity Map under the Attachment Tab in PRISM.
<br /> Yes,Within the City of Everett.
<br /> 2 of 18 Describe any ground disturbing work that will be necessary as part of the design process,such as geotech work.Include anticipated number c
<br /> test sites,depth of disturbance,location,etc.
<br /> Geotechnical investigation for foundation design.
<br /> 3 of 18 When will the project be completed and made available to the public for outdoor recreation uses?Please note that funding may not be awarded
<br /> for about one year from application submittal and it may take one or more years for you to complete the project.
<br /> December 2021
<br /> 4 of 18 Describe any required mitigation as a result of the action in this proposal.Will mitigation occur on this site or another location?
<br /> None
<br /> 5 of 18 Are overhead utility lines present at the site,and if so explain how they will be relocated or buried.
<br /> No
<br /> 6 of 18 Will this proposal create a new public park/recreation area where none presently exists?If yes,what will the area be named?
<br /> No
<br />
|