Laserfiche WebLink
Number of permits required for implementation of project 3 <br /> Architectural&Engineering <br /> Architectural&Engineering(A&E) <br /> Total cost for Architectural&Engineering(A&E) $62,975.0 <br /> Development Questions <br /> 1 of 7 Is the worksite(s)located within an existing park,wildlife refuge,natural area preserve,or other recreation or habitat site?If yes,name the area <br /> and specify if the land is owned by local,state or federal government. <br /> Yes,The building is located within the Jetty Landing Boat Launch area,adjacent to the Jetty Landing Park,in Everett.The property is owned jointly by the Port <br /> of Everett,the City of Everett,and Snohomish County. <br /> 2 of 7 Identify the source of funds(i.e.federal grant,Conservation Futures,local appropriations,private land donation,etc.)that was originally used tc <br /> acquire the property. <br /> The property was originally acquired with grant funding from the RCO(IAC)under the Boating Facilities Program(Agreement#72-068)and local funding from <br /> the Port,the City,and the County. <br /> 3 of 7 Cultural Resources:Has the worksite been investigated for historical,archeological,or cultural resources?If yes,when did this occur and wha <br /> agencies and tribes were consulted?Attach related documents(letters,surveys,agreements,etc.)to your project in PRISM. <br /> No <br /> 4 of 7 Describe existing worksite site conditions.The answer to this question will be used in cultural resource consultation so please provide detailec <br /> information. <br /> The original site consisted of tidelands,which were filled in to provide an upland area for the parking lot,restroom building,and park. <br /> 5 of 7 Cultural Resources:Describe any proposed ground disturbing activities that will take place as part of your project.This includes work <br /> conducted by hand or mechanized tools.Provide specific information including length,width,and depth of the ground disturbance.Ground <br /> disturbing work includes all restoration activities,geotech,fencing,demolition,etc.Avoid subjective phrases such as"ground disturbing <br /> activities will be minor". <br /> Ground disturbing activities will include building demolition,foundation work,and possible utility trenching.The details of the ground disturbing activities are nc <br /> yet available. <br /> 6 of 7 Give street address for this worksite if available. <br /> 620 10th Street,Everett,WA 98201 <br /> 7 of 7 Cultural Resources:Are there any structures existing on the property(including tidegates,dikes,residential structures,bridges,rail grades, <br /> etc.)?If so,please list all existing structures.Indicate if any of these structures will be altered or demolished as a result of the project,and <br /> provide the following for each structure that could be altered or demolished:identifying name,year constructed,year(s)remodeled/renovated. <br /> Attach at least one photo of each altered structure. <br /> Yes,The existing restroom building will be demolished.This building was built in 1982. <br /> Property for Jetty Landing Worksite #1: Jetty Landing <br /> 4ctivity: Development <br /> Landowner Control and Tenure <br /> Port of Everett Instrument Type: Sponsor owned property(deed) <br /> PO Box 538 Purchase Type: <br /> Everett,WA 98206-0538 Term Length: Perpetuity <br /> Expiration Date: <br /> Landowner Type: Local Government Note: <br /> Overall Project Questions <br /> 1 of 18 Does the project site or project boundary lie within the urban growth area boundary of a city or town with a population of 5,000 or more?If yes, <br /> name the community and attach one map called Population Proximity Map under the Attachment Tab in PRISM. <br /> Yes,Within the City of Everett. <br /> 2 of 18 Describe any ground disturbing work that will be necessary as part of the design process,such as geotech work.Include anticipated number c <br /> test sites,depth of disturbance,location,etc. <br /> Geotechnical investigation for foundation design. <br /> 3 of 18 When will the project be completed and made available to the public for outdoor recreation uses?Please note that funding may not be awarded <br /> for about one year from application submittal and it may take one or more years for you to complete the project. <br /> December 2021 <br /> 4 of 18 Describe any required mitigation as a result of the action in this proposal.Will mitigation occur on this site or another location? <br /> None <br /> 5 of 18 Are overhead utility lines present at the site,and if so explain how they will be relocated or buried. <br /> No <br /> 6 of 18 Will this proposal create a new public park/recreation area where none presently exists?If yes,what will the area be named? <br /> No <br />