Laserfiche WebLink
DocuSign Envelope ID:D137EDD8-37EA-4DA6-8627-255EDCOB496B <br /> State of Washington Department of Ecology Page 10 of 24 <br /> Agreement No: OTGP-2022-EverPW-00093 <br /> Project Title: Everett Smelter Plume(ESP)Cleanup Site Drainage Project <br /> Recipient Name: City of Everett <br /> SCOPE OF WORK <br /> Task Number: 3 Task Cost: $970,000.00 <br /> Task Title: Construction—J006 <br /> Task Description: <br /> •In accordance with Ecology-accepted plans and specifications, RECIPIENT will contract with a construction contractor to <br /> complete construction of the project. The construction project will include: <br /> o Inspecting, cleaning, and lining using cured-in-place pipe(CIPP)drainage piping,including: <br /> Approximately 25 linear feet of 6-inch diameter, <br /> Approximately 1,380 linear feet of 12-inch diameter, <br /> Approximately 1,060 linear feet of 18-inch diameter, and <br /> Approximately 975 linear feet of 24-inch diameter. <br /> o Grouting of the following: <br /> Catch basins, <br /> Manholes, and/or <br /> Joints as needed. <br /> o Installing a 24-inch tide gate at the drainage system outfall. <br /> o Replacing, extending or placing additional fencing,including: <br /> Replacing or extending approximately 1825 linear feet of fencing,and <br /> Adding approximately 375 linear feet. <br /> Task Goal Statement: <br /> RECIPIENT will enter into an agreement with a construction contractor to construct the project in accordance with <br /> Ecology-accepted plans and specifications. <br /> Task Expected Outcome: <br /> The constructed project will prevent the infiltration of contaminated groundwater into privately-and City-owned drainage pipe, <br /> ultimately improving water quality in the Snohomish River and Port Gardner Bay. <br /> Recipient Task Coordinator: Emily Coba <br /> Construction—J006 <br /> Deliverables <br /> Number Description Due Date <br /> 3.1 Project Outcome Summary Report. 03/31/2023 <br /> 3.2 Post construction as-built documentation. 06/30/2023 <br /> 3.3 Pre and Post construction photographs will be uploaded to the EAGL 06/30/2023 <br /> database. <br /> Template Version 12/10/2020 <br />