My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 3/15/2022
>
Contracts
>
6 Years Then Destroy
>
2023
>
WA ST Dept of Ecology 3/15/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 3:48:11 PM
Creation date
3/25/2022 11:36:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
3/15/2022
Council Approval Date
3/2/2022
End Date
12/31/2023
Department
Public Works
Department Project Manager
Richard Tarry
Subject / Project Title
Everett Smelter Plume Cleanup Site Drainage
Tracking Number
0003277
Total Compensation
$1,055,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
Document Relationships
WA ST Dept of Ecology 1/25/2023 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Grant
Washington State Department of Ecology 11/20/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D137EDD8-37EA-4DA6-8627-255EDC0B496B <br /> State of Washington Department of Ecology Page 8 of 24 <br /> Agreement No: OTGP-2022-EverPW-00093 <br /> Project Title: Everett Smelter Plume(ESP)Cleanup Site Drainage Project <br /> Recipient Name: City of Everett <br /> SCOPE OF WORK <br /> Task Number: 1 Task Cost: $45,000.00 <br /> Task Title: Design Plans/Specifications,Enviro Review-J005 <br /> Task Description: <br /> •RECIPIENT will prepare job Scope of Work and budget for the remedial work and confirm with the construction contractor <br /> whether all or part of the project can be completed using the RECIPIENT'S Job Order Contracting(JOC)construction <br /> method. <br /> •RECIPIENT will determine job contracting method(s)to use to hire a construction contractor to perform the work. <br /> •As necessary,RECIPIENT will coordinate with JOC construction contractor to finalize Scope of Work for the project as <br /> described in tasks 2 and 3. <br /> •RECIPIENT will prepare final design and specifications in-house. <br /> •RECIPIENT will complete all work necessary to execute construction contract(s). <br /> •If necessary, RECIPIENT will prepare application and obtain Hydraulic Project Approval (HPA)through the Washington <br /> Department of Fish and Wildlife(WDFW). <br /> •RECIPIENT will obtain all construction permits and conduct all environmental reviews as necessary for the project. <br /> Task Goal Statement: <br /> RECIPIENT will complete all design and environmental review in a timely manner. <br /> Task Expected Outcome: <br /> The project will be designed to meet cleanup goals. <br /> Recipient Task Coordinator: Emily Coba <br /> Design Plans/Specifications,Enviro Review-J005 <br /> Deliverables <br /> Number Description Due Date <br /> 1.1 All necessary construction permits will be provided to Ecology and uploaded 08/01/2022 <br /> to the EAGL database. <br /> 1.2 90%and final design plan sets will be uploaded to the EAGL database. 06/30/2022 <br /> 1.3 Final construction specifications will be uploaded to the EAGL database. 07/15/2022 <br /> 1.4 Environmental review document(s)will be uploaded to the EAGL database. 07/15/2022 <br /> 1.5 Application to WDFW and approval document from WDFW for hydraulic 07/15/2022 <br /> project to be uploaded to the EAGL database. <br /> 1.6 Copy of signed construction contract(s)documents. 08/01/2022 <br /> Template Version 12/10/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.