Laserfiche WebLink
DocuSign Envelope ID:D137EDD8-37EA-4DA6-8627-255EDC0B496B <br /> State of Washington Department of Ecology Page 8 of 24 <br /> Agreement No: OTGP-2022-EverPW-00093 <br /> Project Title: Everett Smelter Plume(ESP)Cleanup Site Drainage Project <br /> Recipient Name: City of Everett <br /> SCOPE OF WORK <br /> Task Number: 1 Task Cost: $45,000.00 <br /> Task Title: Design Plans/Specifications,Enviro Review-J005 <br /> Task Description: <br /> •RECIPIENT will prepare job Scope of Work and budget for the remedial work and confirm with the construction contractor <br /> whether all or part of the project can be completed using the RECIPIENT'S Job Order Contracting(JOC)construction <br /> method. <br /> •RECIPIENT will determine job contracting method(s)to use to hire a construction contractor to perform the work. <br /> •As necessary,RECIPIENT will coordinate with JOC construction contractor to finalize Scope of Work for the project as <br /> described in tasks 2 and 3. <br /> •RECIPIENT will prepare final design and specifications in-house. <br /> •RECIPIENT will complete all work necessary to execute construction contract(s). <br /> •If necessary, RECIPIENT will prepare application and obtain Hydraulic Project Approval (HPA)through the Washington <br /> Department of Fish and Wildlife(WDFW). <br /> •RECIPIENT will obtain all construction permits and conduct all environmental reviews as necessary for the project. <br /> Task Goal Statement: <br /> RECIPIENT will complete all design and environmental review in a timely manner. <br /> Task Expected Outcome: <br /> The project will be designed to meet cleanup goals. <br /> Recipient Task Coordinator: Emily Coba <br /> Design Plans/Specifications,Enviro Review-J005 <br /> Deliverables <br /> Number Description Due Date <br /> 1.1 All necessary construction permits will be provided to Ecology and uploaded 08/01/2022 <br /> to the EAGL database. <br /> 1.2 90%and final design plan sets will be uploaded to the EAGL database. 06/30/2022 <br /> 1.3 Final construction specifications will be uploaded to the EAGL database. 07/15/2022 <br /> 1.4 Environmental review document(s)will be uploaded to the EAGL database. 07/15/2022 <br /> 1.5 Application to WDFW and approval document from WDFW for hydraulic 07/15/2022 <br /> project to be uploaded to the EAGL database. <br /> 1.6 Copy of signed construction contract(s)documents. 08/01/2022 <br /> Template Version 12/10/2020 <br />