My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE 2018 INTERWEST CONSTRUCTION INC Plans 2023-02-28
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
Plans
>
2320 RAILWAY AVE 2018 INTERWEST CONSTRUCTION INC Plans 2023-02-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 3:44:51 PM
Creation date
3/29/2022 3:33:59 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Permit
PW1807-043
Year
2018
Notes
FILL AND GRADING AT PROPOSED CONTRACTOR YARD
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br />— — -16- — — - EXISTING CONTOUR <br />16 PROPOSED CONTOUR <br />w <br />SEDIMENT FENCE, SEE DETAIL 103/C1.1. STEEL <br />w <br />V) <br />z <br />0- <br />POSTS ARE REQUIRED <br />m <br />V) <br />w <br />SITE CIRCULATION ROUTE <br />O <br />Of <br />v <br />``' <br /><- _I CONSTRUCTION ACCESS, SEE DETAIL 101/C1.1 <br />o <br />� <br />ui <br />CRUSHED AND RUBBLIZE EXISTING PAVEMENT <br />o <br />C3 <br />TO INTEGRATION INTO SITE FILL. <br />C> <br />00 <br />DEMOLISH AND REMOVE EXISTING FEATURE <br />z <br />0CIA <br />W <br />`- <br />o <br />x,--18.32 PROPOSED SPOT ELEVATION <br />00 <br />o <br />0 <br />w <br />Y <br />Y <br />N <br />0 <br />F— <br />Z <br />co <br />O <br />(17 <br />Q <br />V) <br />J <br />� <br />w <br />RAL NO i <br />W <br />Q <br />4 <br />0 <br />o <br />a:Y <br />0 0 <br />0 <br />V) <br />1. <br />NOT USED. <br />2. <br />SITE FILL SHALL CONFORM TO WSDOT STANDARD SPECIFICATIONS FOR <br />w <br />GRAVEL BORROW, 9-03.14(1) OR SELECT BORROW 9-03.14(2). <br />GRANULAR MATERIAL MAY CONTAIN PROCESSED/RECYCLED CONCRETE. <br />3. <br />SEE SHEETS C1.1 AND C1.2 FOR EROSION CONTROL NOTES AND DETAILS. <br />4. <br />SITE EARTHWORK OPERATIONS SHALL COMMENCE AT THE NORTH END OF <br />21 o <br />"' <br />o <br />THE SITE THEN CONTINUE TO THE SOUTH END OF THE SITE. <br />J <br />5. <br />APPLICANT SHALL STRIP 6-12 INCHES OF ORGANIC SOILS PRIOR TO <br />W <br />FILLING OPERATIONS. STOCKPILE ORGANIC STRIPPING AS INDICATED ON <br />PLAN. <br />6. <br />COMPACT NATIVE SUBSOILS PRIOR TO FILLING OPERATION TO MINIMUM <br />90% OF MAX DENSITY PER ASTM D-1557. OVER EXCAVATE SOFT SPOTS <br />AND BACKFILL W/ SELECT BORROW OR GRAVEL BORROW. <br />® <br />o <br />7. <br />INSTALL BORROW IN LIFTS NO GREATER THAN 8" DEPTH AND COMPACT <br />o <br />TO 95% OF MAX. DENSITY PER ASTM D-1557. <br />8. <br />MINIMUM TEMPORARY SEDIMENT POND BOTTOM AREA OF 5,600 SQUARE <br />D E <br />N <br />FEET. <br />umem <br />°, cn o <br />a <br />u <br />9. <br />POND SHALL BE DIVIDED INTO THREE ROUGHLY EQUAL CELLS. THE <br />rtoo <br />® ~ <br />`- <br />' <br />DIVIDER SHALL BE WIRE -BACKED, EXTRA STRENGTH FILTER FABRIC. THE <br />0 <br />DIVIDER SHALL BE AT LEAST ONE-HALF THE HEIGHT OF THE RISER AND00 <br />— <br />— <br />A MINIMUM OF ONE FOOT BELOW THE TOP OF THE RISER (BMP C241: <br />J, <br />TEMPORARY SEDIMENT POND). <br />- <br />w <br />W <br />3 <br />10. <br />INTERIM EARTHWORK ACTIVITIES TO CONFORM TO RECOMMENDATION <br />"PRELIMINARY <br />r <br />3 <br />PROVIDED IN GEOTECHNICAL STUDY, RIVERSIDE PROPERTY, <br />0 n <br />0� <br />a <br />PREPARED FOR THE CITY OF EVERETT PUBLIC WORKS BY ASPECT <br />L <br />CONSULTING, PROJECT NO. 080161-001, JUNE 17, 2009. ACTUAL <br />vi <br />J w <br />v <br />ON -SITE CONDITIONS MAY VARY. IT IS RECOMMENDED THAT THE <br />m <br />j <br />ui <br />CONTRACTOR OBTAIN SOIL TESTING SERVICES AND GEOTECHNICAL <br />o <br />c.� L' <br />o <br />ENGINEERING SERVICES DURING EARTHWORK OPERATIONS. <br />a <br />co <br />CL <br />a <br />w <br />11. <br />PROTECT STOCKPILES FROM EROSION BY COVERING W/ PLASTIC. SEE <br />a <br />DETAIL 104/C1.2. <br />12. <br />PROVIDE DUST CONTROL VIA WATER TRUCK FOR DURATION OF PROJECT <br />(BMP C140: DUST CONTROL). <br />13. <br />ALL EXPOSED GROUND MUST BE RESEEDED WITHIN 30 DAYS OF THE <br />COMPLETION OF CONSTRUCTION. IF RESEEDING IS NOT PRACTICAL DUE <br />TO WEATHER OR SEASON PROBLEMS, THE GROUND MUST BE COVERED <br />WITH MULCH AS DIRECTED BY THE CITY ENGINEER. <br />N <br />N <br />In Z <br />cr- <br />oo <br />0 <br />U <br />z <br />Z <br />� <br />0 <br />5 <br />p <br />o <br />m <br />0 <br />w <br />a <br />d <br />w <br />x <br />(L <br />cr- rz Ld <br />cl)Mz <br />APPROVED : � u— z <br />PUBLIC VVi Ri(S DEPAR rT ENw <br />CD _ 3: <br />iTV 0 EVERETT REVIEWED FOR PERIAI'r .$ <br />F � <br />o W® w <br />A 1� >Fr M <br />z— w <br />SHEET N0. <br />■ i <br />C®MPMT N <br />HORIZODTU <br />1"=5O' � PROJECT N0. <br />INTERIM SITE FILL AND EROSION CONTROL PLAN 50 0 50 100 00 <br />SCALE: 1 "=50'3: 17730 <br />
The URL can be used to link to this page
Your browser does not support the video tag.