STANDARD EROSION CONTROL NOTES <br />CITY OF EVERETT <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AND APPROVAL OF <br />PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, <br />RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND <br />UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL <br />CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD <br />PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED <br />CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR <br />FOR THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND <br />GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO <br />NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. <br />DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED <br />STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT/CONTRACTOR TO <br />ENSURE THEIR CONTINUED FUNCTION, ESPECIALLY AFTER STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR <br />WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH <br />BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING <br />OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND <br />MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT <br />ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF <br />THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE <br />PROPOSED BMP'S FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS <br />FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NOT MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />DRAINAGE <br />GRATE FR# <br />SEDIMENT <br />AND DEBF <br />BELO <br />DEVh <br />SECTION VIEW <br />ISOMETRIC VIEW <br />SEEDING NOTES <br />1. SEED MIXTURES SHALL BE PER THE "SEED MIXTURE FOR EROSION CONTROL" TABLE BELOW, AND SHALL <br />BE APPLIED AT THE RATE OF 80 LB. PER ACRE. <br />2. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL REQUIRE IRRIGATION AND OTHER <br />MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT THE ROOT STRUCTURE. <br />3. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30, ARMORING OF THE SEED BED WILL BE <br />NECESSARY (E.G. GEOTEXTILES, JUTE MAT, CLEAR PLASTIC COVERING). <br />4. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT <br />TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS, AND SEDIMENT BASINS. <br />5. THE SEED BED SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING SURFACE ROUGHENING. <br />PERFORM ALL OPERATIONS ACROSS OR AT RIGHT ANGLES TO THE SLOPE. <br />6. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS RECOMMENDATIONS. AMOUNTS USED SHOULD <br />BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS. <br />7. SEED SHALL NOT BE USED IN AREAS SUBJECT TO WEAR BY CONSTRUCTION TRAFFIC. <br />8. APPLICABLE IN AREAS OF 10% OR LESS SLOPE FOR A MAXIMUM HORIZONTAL DISTANCE OF 100 FEET. <br />IN STEEPER AREAS (>10% SLOPE), USE MULCH, NETTING, OR OTHER TREATMENTS SPECIFICALLY <br />DESIGNED FOR STEEPER AND LONGER SLOPES. <br />SEED MIXTURE FOR EROSION CONTROL <br />NAME PROPORTIONS PERCENT PERCENT <br />BY WEIGHT <br />PURITY <br />GERMINATION <br />REDTOP (AGROSTIS ALBA) <br />10% <br />92% <br />85% <br />ANNUAL RYE (LOLIUM <br />40% <br />98% <br />90% <br />MULTIFLORUM) <br />CHEWING FESCUE (FESTUCA <br />40% <br />98% <br />90% <br />RUBRA COMMUTATA) <br />WHITE DUTCH CLOVER <br />10% <br />98% <br />90% <br />(TRIFOLIUM REPENS) <br />MULCHING NOTES <br />1. MULCH MATERIALS USED SHALL BE STRAW OR WOOD CELLULOSE FIBERS, AND SHALL BE APPLIED PER <br />2016 WSDOT STANDARD SPECIFICATION 9-14 EROSION CONTROL AND ROADSIDE PLANTING. PROVIDE <br />SOLID COVER OVER FINISH GRADE. <br />2. MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH CANNOT BE SEEDED <br />BECAUSE OF THE SEASON. <br />3. ALL AREAS NEEDING MULCH SHALL BE COVERED BY OCTOBER 31. <br />)W BYPASS <br />NLET GRATE <br />WATER <br />n�rn�ri ia� r�rcTree <br />.� STORM DRAIN INLET PROTECTION (BMP C220: STORM DRAIN INLET PROTECTION) <br />IVL SCALE: N.T.S. <br />NOTES <br />1. CATCH BASIN INSERTS SHALL BE REMOVED AT THE <br />END OF THE PROJECT. <br />2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN <br />DRAINAGE DEVICES PER THE MANUFACTURES'S <br />RECOMMENDATIONS. CATCH BASIN INLET INSERTS <br />SHALL BE INSTALLED IN CURB INLETS. <br />3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO <br />CLEARING AND GRADING ACTIVITY, OR UPON <br />PLACEMENT OF A NEW CATCH BASIN. <br />4. SEDIMENT SHALL BE REMOVED FROM THE UNIT <br />WHEN IT BECOMES ONE THIRD FULL OR IN <br />ACCORDANCE WITH THE MANUFACTURES' <br />INSTRUCTIONS. <br />S. SEDIMENT REMOVAL SHALL BE ACCOMPLISHED BY <br />REMOVING THE INLET INSERTS, EMPTYING, AND <br />RE -INSTALLING IT INTO THE CATCH BASIN. DO NOT <br />WASH SEDIMENT INTO STORM DRAINS WHILE <br />CLEANING. <br />6, SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE <br />STORM WATER STRUCTURE IT WILL SERVICE. <br />7. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF <br />SYSTEM (OVERFLOW BYPASS). <br />8. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF <br />THE BIGD WITHOUT SPILLING THE COLLECTED <br />MATERIAL. <br />9. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />STANDARD SPECIFICATION 8-01.3(15). <br />0 <br />�2 <br />a <br />z <br />z <br />u+ <br />WSDOT STD PLAN I-40.20-00 ACCEPTABLE SUBSTITUTE IF <br />MAINTENANCE MEETS NOTES 1-5 <br />is <br />CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />., <br />NEATHEt6RlEFiN P�iUil[W ESH 12/30/2016 <br />n�RYAN5As5 <br />STORM DRAIN INLET <br />210 <br />12 <br />PROTECTION <br />LENGTH AS REQUIRED 100' C <br />MAY BE REDUCED TO 50' MI <br />SITES WITH LESS THAN ONE <br />OF EXPOSED SOIL OR APPRC <br />PLACE CONSTRUCTION GEO' <br />STABILIZATION FROM THE E <br />ROADWAY TO THE CONSTRL <br />OR AS DIRECTED BY THE EN(-- ­ <br />ISOMETRIC VIEW <br />CONSTRUCTION ENTRANCE <br />CONSTRUCTION ACCESS (BMP C105: CONSTRUCTION ENTRANCE) <br />SCALE: N.T.S. <br />ATTACH IN A MANNER THAT <br />ASSURES FABRIC IS FIRMLY <br />HELD BY THE BACKUP <br />SUPPORT IN A WAY THAT <br />REDUCES THE POTENTIAL <br />FOR FABRIC TEARING <br />POST SEE WSDOT STANDARD <br />SPECIFICATIONS 8-01.3(9)A <br />FASTEN GEOTEXTILE TO <br />POST EVERY 6" IN O,C. <br />-pyA b Z <br />BACKFILLED & SELF-LOCKING TIE-NYLONE <br />COMPACTED �!� 6/6 (MIN GRADE) <br />NATIVE SOIL A <br />ILE "F 120# MIN TENSILE STRENGTH, <br />UV STABILIZED <br />BURY GEOTEXTILE <br />IN TRENCH <br />F;f <br />TYPICAL INSTALLATION DETAIL, <br />Ilijllf <br />IIIIIlifilll <br />,II!!lIIfIII, , <br />��II ')!!ltlli�ilaF <br />r�pi�l ,;GIs <br />10p 11.� <br />r !!I I IIIfIl1111ir111� <br />• t 1�111�� 1�� � Iloi o1I111 <br />Nyi�11�1I1i�f�ll�lll�ill <br />1�M�I I 1 1 <br />I�NI11�111�� ���III <br />rr� �irf irr >t�� <br />00 <br />�����>a1` 1111111�Illl��il��! <br />IM�i��N����Nj�N�������i� <br />s��lM <br />.s <br />TEMPORARY SILT FENCE (BMP C233: SILT FENCE) <br />Ivv J SCALE: N.T.S. <br />GEOTEXTILE FOR SILT FENCE <br />SEE STANDARD SPECIFICATION <br />SECTION 9-33.2 (1), TABLE 6 - <br />NOTES <br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL <br />MEET THE REQUIREMENTS OF WSDOT STANDARD <br />SPECIFICATION SECTION 8-01.3(7). <br />INSTALL DRIVEWAY CULVERT <br />IF THERE IS A ROADSIDE DITCH <br />PRESENT <br />30' MIN TYPICAL <br />PERMEABLE BALLAST TYPICAL SEE <br />STANDARD SPECIFICATION <br />SECTION 9-03.9(2) <br />PROVIDE FULL WIDTH OF <br />INGRESS/EGRESS AREA <br />15' MIN <br />WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE <br />CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />CONSTRUCTION ACCESS 201 <br />NOTES <br />1, INSTALL THE ENDS OF THE SILT FENCE TO POINT <br />SLIGHTLY UPSLOPE TO PREVENT SEDIMENT FROM <br />FLOWING AROUND THE ENDS OF THE FENCE. <br />2. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />WSDOT STANDARD SPECIFICATIONS 8-01.3(9)A <br />AND 8-01.3(15). <br />3. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS <br />OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN <br />LOW OR SUMP AREAS, THE FENCE MAY NEED TO <br />BE REINSTALLED UNLESS OTHERWISE APPROVED. <br />4. INSTALL SILT FENCING PARALLEL TO MAPPED <br />CONTOUR LINES. <br />5. DURING EXCAVATION, MINIMIZE DISTURBING <br />THE GROUND AROUND TRENCH AS MUCH AS IS <br />FEASIBLE, AND SMOOTH SURFACE FOLLOWING <br />EXCAVATION TO AVOID CONCENTRATING FLOWS. <br />COMPACTION MUST BE ADEQUATE TO PREVENT <br />UNDERCUTTING FLOWS. <br />BACKUP SUPPORT <br />(TYPICAL) <br />SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER <br />TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE <br />FENCE AT THE OVERLAP. <br />SPLICE DETAIL <br />WSDOT STO PLAN 1-30.10-02 ACCEPTABLE SUBSTITUTE <br />EXCEPT STEEL POST FEOUND <br />CITY OF EVERETT <br />rr PUBLIC WORKS DEPARTMENT <br />APPROVED G'RYANSA5S 'EAT-HERGRIff APAULWlIHEIM <br />03/17/2017 <br />pU!gOWS D P TMENT.un= <br />TEMPORARY SILT FENCE 214 <br />t;ITY OF F_.` FOR PERMIT <br />(N <br />z <br />O <br />5 <br />w <br />w <br />w <br />V) <br />v <br />0 <br />0 <br />m <br />w <br />Of <br />rn <br />0 <br />N <br />0 <br />E� <br />� <br />o <br />_73Y <br />� <br />� <br />J <br />Y <br />= <br />Y <br />N <br />ap <br />N <br />C) <br />o <br />Z <br />� <br />a <br />U) <br />o <br />J <br />> o <br />O z <br />d <br />ui <br />Q 0 <br />3 <br />of <br />0 <br />W <br />U <br />U <br />O <br />w <br />JQ <br />V) <br />J <br />Q <br />La <br />m <br />0 <br />Li <br />Of <br />a <br />a <br />w <br />a. <br />O <br />w <br />w <br />a <br />a <br />w <br />cr <br />a <br />C9 <br />CD <br />LO <br />Z <br />00o <br />Z <br />v <br />Q <br />M <br />V <br />■. <br />cl) <br />0 <br />i <br />J <br />1 <br />1p <br />°6 <br />W <br />/., <br />V/1 <br />W <br />�' <br />? <br />� <br />y <br />�? <br />F- <br />Z_ <br />W <br />w <br />H <br />co <br />to <br />n <br />� <br />_ <br />� <br />■ <br />W <br />W <br />M <br />a <br />aY.+ <br />ZJ <br />W <br />v <br />s <br />W <br />U <br />;= <br />LLI <br />0- <br />0 <br />o <br />M <br />N <br />Q <br />Z <br />> <br />°' <br />co W <br />O <br />LLJ <br />O <br />3 <br />>- <br />m <br />Z <br />w <br />J <br />I- <br />Z <br />2 <br />Z <br />V <br />Z <br />0 <br />O <br />CIDm <br />w <br />Z <br />U <br />0 <br />O 3 <br />Z <br />0 w w <br />Urj) <br />LLJ <br />c <br />J <br />Lv <br />Z <br />J <br />O>a <br />a: <br />Zw <br />Uwe <br />O <br />O <br />3 <br />Uz <br />Ciz_ <br />W <br />Z'Q^^ <br />F O VJ <br />W o: a� <br />owwo <br />w <br />wOE-' <br />> C-4 <br />Z 04 <br />WZ <br />SHEET NO. <br />C1.1 <br />I <br />C:) <br />Go <br />PROJECT NO. <br />17733 <br />7 <br />