My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1528 GRAND AVE 2022-04-01
>
Address Records
>
GRAND AVE
>
1528
>
1528 GRAND AVE 2022-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 2:15:29 PM
Creation date
4/1/2022 2:14:15 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1528
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHITECTURE STUDIO OF NOR ETT • <br /> 1201 COLBY AVENUE-EVERETT WA 98201 <br /> 200.931.0990 CARIN@ARCRSTUOIOEVERETT.COM <br /> 4. Provide minimum 100 CFM exhaust fan in the kitchen vented to the exterior.Please show requirement on the <br /> plans. <br /> Callout added to sheet A2.1 <br /> 5. Please show how combustion air for the fuel burning appliances installed in the Mechanical Room is <br /> provided. <br /> Combustion air provided through air grilles located on the mechanical room door. Callouts added to sheet <br /> A2.0. <br /> 6. A carport is required to be completely open on at least two sides.As drawn the plans are showing an area that <br /> would be defined as a Garage. Please revise the label for this space. <br /> The area in question has been relabeled and is considered a garage. See sheet A2.0. <br /> 7. All habitable spaces are required to be provide with natural or artificial light per section R303. Please show <br /> how the"REC AREA" is provide with natural or artificial light in compliance with this section. <br /> Required notation per R303 has been added to sheet A2.0. <br /> 8. In the geotechnical evaluation under the"Geotechnical Consultation and Construction Monitoring"heading it <br /> states; <br /> -GTS recommends that we be involved in the project design review process.The purpose of the review is to <br /> verify that the recommendations presented in this report are understood and incorporated in the design and <br /> specifications. <br /> - ...observation by GTS personnel during earthwork,compaction,and foundation excavation... <br /> -Periodic fields density testing should be performed to verify that the appropriate degree of compaction is <br /> obtained. <br /> Provide notes on the drawings to reflect the recommendations of the geotechnical and critical evaluation <br /> report,and to call out the special inspections as needed. <br /> Provide verification from GTS that the plans have been reviewed by them. <br /> We had erroneously assumed that the Geotechnical Engineer had been monitoring the design progress as it <br /> related to conformance with their recommendations. It turns out that they hadn't. Significant redesign was <br /> 2 `) <br />
The URL can be used to link to this page
Your browser does not support the video tag.