Laserfiche WebLink
Thanks Karen, <br /> I looked online for instructions on applying for a demo permit. I didn't find much and two main questions: <br /> 1. Since we already have a permit where demolition is proposed, do we make revisions and amend the drawings <br /> associated with the existing permit? Or do we need to fill out a separate demo permit application for this <br /> isolated scope? <br /> 2. The contractor believes that we need to remove the fireplace/chimney ASAP to maintain the integrity of the <br /> remaining house. Is there a way to expedite the approvals? <br /> Thanks <br /> GARIN SCHENK <br /> PRINCIPAL <br /> ARCHITECTURE STUDIO OF EVERETT <br /> { <br /> 1207 COLBY AVE <br /> { EVERETT,WA 98201 <br /> 206.931.0990 <br /> On Fri, Feb 28, 2020 at 2:46 PM Karen Stewart<KStewart@everettwa.gov>wrote: <br /> Garin, <br /> It is optional for the structurally unsound chimney to be replaced. No further historic review is needed as you apply for <br /> your demo permit. <br /> Thanks for the opportunity to review, <br /> 4 /�' <br />