My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1528 GRAND AVE 2022-04-01
>
Address Records
>
GRAND AVE
>
1528
>
1528 GRAND AVE 2022-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 2:15:29 PM
Creation date
4/1/2022 2:14:15 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1528
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Report's Recommendations are Not Final <br /> Do not over-rely on the construction recommendations included in this report.Those <br /> recommendations are not final, because geotechnical engineers or geologists <br /> develop them principally from judgment and opinion. GeoTest's geotechnical <br /> engineers or geologists can finalize their recommendations only by observing actual <br /> subsurface conditions revealed during construction. GeoTest cannot assume <br /> responsibility or liability for the report's recommendations if our firm does not perform <br /> the construction observation. <br /> A Geotechnical Engineering or Geologic Report may be Subject to Misinterpretation <br /> Misinterpretation of this report by other design team members can result in costly <br /> problems. Lower that risk by having GeoTest confer with appropriate members of the <br /> design team after submitting the report. Also,we suggest retaining GeoTest to review <br /> pertinent elements of the design teams plans and specifications. Contractors can also <br /> misinterpret a geotechnical engineering report. Reduce that risk by having GeoTest <br /> participate in pre-bid and preconstruction conferences, and by providing <br /> construction observation. <br /> Do not Redraw the Exploration Logs <br /> Our geotechnical engineers and geologists prepare final boring and testing logs <br /> based upon their interpretation of field logs and laboratory data. To prevent errors of <br /> omissions, the logs included in this report should never be redrawn for inclusion in <br /> architectural or other design drawings. Only photographic or electronic reproduction <br /> is acceptable; but recognizes that separating logs from the report can elevate risk. <br /> Give Contractors a Complete Report and Guidance <br /> Some owners and design professionals mistakenly believe they can make contractors <br /> liable for unanticipated subsurface conditions by limiting what they provide for bid <br /> preparation. To help prevent costly problems, give contractors the complete <br /> geotechnical engineering report, but preface it with a clearly written letter of <br /> transmittal. In that letter, consider advising the contractors that the report was not <br /> prepared for purposes of bid development and that the report's accuracy is limited; <br /> encourage them to confer with the GeoTest and/or to conduct additional study to <br /> obtain the specific types of information they need or prefer. A pre-bid conference can <br /> also be valuable. Be sure contractors have sufficient time to perform additional study. <br /> Only then might you be in a position to give contractors the best information <br /> available, while requiring them to at least share some of the financial responsibilities <br /> 3 <br /> llnformation in this document is based upon material developed by ASFE,Professional Firms Practicing in the <br /> Geosciences(asfe.org) <br />
The URL can be used to link to this page
Your browser does not support the video tag.