Laserfiche WebLink
• <br /> Subsurface Exploration,Geologic Hazard,and <br /> Janowicz Property Geotechnica!Engineering Report <br /> Everett,Washington Preliminary Design Recommendations <br /> o Passive equivalent fluid equal to 150 pcf triangular pressure distribution should be <br /> applied to two pile diameters within the medium dense to dense landslide deposits to a <br /> depth of about 28 feet. Includes a factor of safety equal to 1.5. <br /> • Passive equivalent fluid equal to 300 pcf triangular pressure distribution should be <br /> applied to two pile diameters within the hard silt soils below the landslide deposit. <br /> Includes a factor of safety equal to 1.5. <br /> • A load reduction of 50 percent may be applied to the pile lagging due to soil arching. <br /> if used as temporary shoring we do not anticipate that the soldier piles will support significant <br /> vertical loads aside from those generated by inclined tiebacks. For design purposes,the vertical <br /> load capacity of soldier piles should be determined based on an allowable skin friction of <br /> 400 pounds per square foot(psf) and an allowable end bearing of 10 kips per square foot (ksf). <br /> The minimum depth of embedment should be determined by the structural engineer to satisfy <br /> vertical load bearing and lateral moment equilibrium. However, ail piles should be embedded <br /> at least 10 feet into the hard silt soils below the base of the retained zone to prevent"kickout." <br /> All soldier piles should be backfilled with concrete or lean mix after drilling and installation. <br /> The backfill above the excavation base elevation could consist of lean mix concrete or <br /> controlled density fill (CDF) to facilitate installation of lagging. Prompt and careful installation <br /> and backfilling of lagging will reduce potential loss of ground. Requirements for lagging should <br /> be made the responsibility of the shoring subcontractor to prevent soil failure, sloughing, and <br /> loss of ground, and to provide a safe working condition. We recommend any voids between <br /> the lagging and the soil should.be backfilled. However, the backfill should not allow potential <br /> hydrostatic buildup behind the wall. Drainage behind the upper wall must be maintained. To <br /> help reduce the likelihood of soil migration from behind the lagging,we recommend the use of <br /> a%-sack cement sand slurry for filling the voids behind the lagging. <br /> It is likely that the soldier pile holes will encounter groundwater within the retained soils unless <br /> dewatering is performed. The contractor should be experienced with the installation of soldier <br /> piles and tieback anchors. If caving conditions or significant seepage is encountered, the <br /> contractor should be prepared to case the holes. If the pile borings encounter obstructions that <br /> • cannot be removed or drilled through, they may need to be moved. Relocated piles may <br /> require additional pile(s) to compensate for the relocation. Any relocation of piles should be <br /> first approved by the structural engineer. <br /> Soldier pile wall construction should begin with installation of all of the soldier piles. When ail <br /> piles have been installed and the concrete is cured, removal of the existing wall can begin. <br /> Treated timber lagging should be installed as the wall removal or additional excavation <br /> progresses. When wall removal/excavation reaches the elevation of planned tiebacks, we <br /> recommend that the excavation not be advanced more than 2 feet below a planned tieback <br /> until the tieback is installed, tested, and locked off at the design load. Permanent wall <br /> May 10,2018 ASSOCIATED EARTH SCIENCES,INC. <br /> NSAd-170649E002-2-Pro)ects12O17O649tKE}WP Page 15 <br />