4.1) <br /> PUBLIC WORKS <br /> b. Please see all redlines on the attached plans for required corrections in addition to all <br /> comments listed below. Frequently, redlines will be stand-alone and will not have an <br /> associated item in this corrections letter.Likewise,comments below may not have associated <br /> redlines. Please indicate to the City that all redlines have been adequately addressed by <br /> providing checkmarks or notes next to the City's redlines to indicate that it has been picked <br /> up or to answer a reviewer's question. A comment response letter can also be included with <br /> your resubmittal to address the comments below(handwritten remarks under each comment <br /> on this letter are perfectly acceptable). The below listed sheets have redlines. <br /> i. Sheet C2.01 <br /> ii. Sheet C2.02 <br /> iii. Sheet C2.100 <br /> iv. Sheet C4.01 <br /> v. Sheet C4.02 <br /> 2. The comments below were generated from this project's Stormwater Reviewer. If you have any <br /> questions regarding these comments,please contact Erik Emerson with the City of Everett Surface <br /> Water Division(425-257-8995 or EEmerson@everettwa.gov). <br /> a. The drainage system for the North Building parking lot is shown with the majority of the <br /> parking lot draining to a connection to the stormwater system in 13th St However, the <br /> original Port of Everett stormwater design identified this area draining to either 14th St. <br /> or Seiner Drive. The storm drainage pipe system in 13th St. does not connect to the <br /> treatment facility constructed by the Port for this site. The parking lot conveyance system <br /> should be redesigned to connect to the 14th Street system as intended in the approved Port <br /> design. Update any plan and profile sheets as necessary. <br /> b. The conveyance calculations included in Appendix E appear to be based on the King <br /> County methodology for the Rational Method. The analysis should be performed using <br /> the methodology outlined in Section 4-3.1 of the City's Design and Construction <br /> Development Standards and Specifications (DCSS),which includes intensity coefficients <br /> specific to the Everett area. <br /> c. The backwater calculations included in Appendix E are based on the 25 year water surface <br /> elevations calculated by the Port of Everett for their street drainage system pipe sizing. <br /> The analysis should also be run using the water surface elevations from the Port's 100 <br /> year backwater analysis and the 100 year flows from the site. In the 100 year analysis a <br /> limited amount of surface flooding is acceptable as defined in Section 4-2.2(3) of the <br /> DCSS manual. Due to the methodology used in the Port's design the 100 year hydraulic <br /> grade line is likely to be more representative of the actual conditions in large storm events. <br /> d. Turn in a copy of the C-SWPPP that you have turned in to Ecology for the Construction <br /> General Stormwater Permit. The Cement Deep Soil Mixing report should be referenced <br /> in the C-SWPPP. <br /> 3. The Planning Department is conducting a separate review of the landscape plans. You will receive <br /> a separate correction letter, if required, from this project's Planner, John Jimerson. If you have <br /> any questions regarding these comments, please contact John Jimerson with the City of Everett <br /> Planning Department(425-257-8737 or JJimerson@everettwa.gov). <br /> Page 2 of 2 <br />