Laserfiche WebLink
During construction, GeoEngineers should evaluate the suitability of the foundation subgrades, observe • <br /> ground improvement installation, observe installation of subsurface drainage measures, evaluate <br /> structural backfill, and provide a summary letter of our construction observation services.The purposes of <br /> GeoEngineers' construction phase services are to confirm that the subsurface conditions are consistent <br /> with those observed in the explorations and other reasons described in Appendix D, Report Limitations and <br /> Guidelines for Use. <br /> LIMITATIONS <br /> We have prepared this report for the exclusive use of SeaLevel Properties and their authorized agents for <br /> the Waterfront Place Apartments project in Issaquah,Washington. <br /> Within the limitations of scope,schedule and budget, our services have been executed in accordance with <br /> generally accepted practices in the field of geotechnical engineering in this area at the time this report was <br /> prepared. No warranty or other conditions, express or implied,should be understood. <br /> Please refer to Appendix D titled "Report Limitations and Guidelines for Use" for additional information <br /> pertaining to use of this report. <br /> REFERENCES <br /> Boulanger, R.W.and Idriss, I.M., 2014. "CPT and SPT Based Liquefaction Triggering Procedures." <br /> City of Seattle, 2017. "Standard Specifications for Road, Bridge and Municipal Construction." • <br /> International Code Council, 2015. "International Building Code." <br /> Ishihara, K.,and Yoshimine, M., 1992. "Evaluation of Settlements in Sand Deposits Following Liquefaction <br /> During Earthquakes,"Soils and Foundations, 32(1), pp. 173-188. <br /> Landau Associates, 2015. "Draft Report Geotechnical Engineering Services Proposed Site Infrastructure <br /> Waterfront Place Central Development Everett,Washington." <br /> Landau Associates, 2015 and 2016. "Port of Everett Waterfront Central Development Project Everett, <br /> Washington." <br /> National Cooperative Highway Research Program, 2007, "NCHRP Synthesis 368, Cone Penetration <br /> Testing." <br /> Reid Middleton,2015,"Port of Everett Central Marina Improvements Phase 2 I Dock, Bulkhead Segment C, <br /> and Pacific Rim Plaza Platform," dated April 28, 2015. <br /> Shannon &Wilson, Inc. "14th and 16th St - Marina District Port of Everett." <br /> Tokimatsu, K. and Seed, H.B., 1987. "Evaluation of Settlements in Sands Due to Earthquake Shaking," <br /> Journal of Geotechnical Engineering,ASCE, 113(GT8), pp. 861-878. • <br /> GEOENGINEERS__06 May31,2017 Page 16 <br /> Ale No.22360-003-00 <br />