Laserfiche WebLink
• ` Geotechnical Engineering Evaluation NGA File No. 1085419 <br /> View Ridge Estates 330 Building Settlement March 22,2019 <br /> Everett,Washington Page 7 <br /> For planning purposes, we recommend that temporary cuts in the on-site soils be no steeper than 2 <br /> Horizontal to 1 Vertical (2H:1 V). If significant groundwater seepage or surface water flow were <br /> encountered, we would expect that flatter inclinations would be necessary. We recommend that cut <br /> slopes be protected from erosion. The slope protection measures may include covering cut slopes with <br /> plastic sheeting and diverting surface runoff away from the top of cut slopes. We do not recommend <br /> vertical slopes for cuts deeper than four feet, if worker access is necessary. We recommend that cut slope <br /> heights and inclinations conform to appropriate OSHA/WISHA regulations. <br /> Foundation Underpinning Improvements <br /> General: We recommend that at a minimum, the eastern, and portions of the northern and southern <br /> foundations extending from the eastern side of the building, be supported on a deep foundation system <br /> such as pin pile or helical anchors, to transfer structure loads down into the underlying competent native <br /> bearing materials to limit future settlement and damage to the structure. Structural brackets should be <br /> used to attach the pin piles/helical anchors to the existing foundations. The structural engineer should <br /> design the new foundation supports and determine the location of the supports based on the <br /> recommendations provided in this letter. A qualified contractor specializing in foundation retrofit should <br /> be retained to complete the repairs. Considering the limited site access conditions, it is our opinion that <br /> the most feasible foundation underpinning systems are 2-inch diameter pin piles driven to refusal using a <br /> hand operated 140-pound jackhammer or hydraulically driven helical anchors. Extreme care should be <br /> taken during the proposed repairs as to not impact existing utilities within the vicinity of the residence. <br /> Our explorations encountered loose undocumented fills within the planned areas to be repaired. If large <br /> objects or debris are present within the fill, there is a possibility that this material may obstruct some piles <br /> or anchors at shallow depths. There should be contingencies in the budget and design for <br /> additional/relocated piles/anchors that may be obstructed by possible debris in the fill. <br /> Due to the rigid pile/anchor support, friction between the foundation and subgrade soil should not be <br /> considered for resisting lateral pressures on this structure. Also, passive resistance acting on the below- <br /> grade portion of the foundation should not be used to resist lateral pressures. We recommend that all <br /> lateral loads be transferred to the remainder of the structure. <br /> We should be retained to review final plans and to monitor installation of the pin piles/anchors during <br /> construction. <br /> 10 \ i.I <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />