Laserfiche WebLink
Step 5. Construction Stormwater Pollution Prevention <br /> (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters.A Construction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br /> management concerns.A copy of this SWPPP is required to be kept by the contractor performingthework at <br /> the jobsite for reference and updating during the duration of construction. <br /> Task 1: Describe the project during construction <br /> 7 (You may attach a narrative that answers the following questions) <br /> Nature and purpose of the construction project: <br /> Proposed construction of a detached accessory dwelling unit and adjacent <br /> parking pad. <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that might be <br /> affected by the construction project: <br /> No critical areas are located nearby. The adjacent alleyway connects to 17th St <br /> and 18th St and the project site fronts on Pine St. <br /> How upstream drainage areas may affect the site: <br /> N/A <br /> Downstream drainage leading from the site to a receiving body of water: <br /> N/A <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> N/A <br /> Special requirements and provisions for working near or within critical areas: <br /> N/A <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in /� <br /> the Combined Sewer Area-April 2021 <br />