Laserfiche WebLink
Task 3: Attach Project Specific Stormwater Site Plan Drawings (required) <br /> 0 See City of Everett standard drawings#100-104 for stormwater site plan requirements and <br /> examples,includinga Temporary Erosion&Sediment Control(TESC)plan drawing <br /> example and drainage plan drawing example,available online <br /> at:everettwa.gov/DocumentCenterNiew/7040 <br /> Task 4: Attach Topographic Survey (if applicable) <br /> ,,,,cy"; <br /> A topographic survey prepared by a registered land surveyor, civil engineer or other <br /> qualified professional is required if your project site includes steep slopes,critical areas, <br /> flood or geologic hazards or at the discretion of the stormwater reviewer. <br /> 0 Task 5: Attach Declaration of Covenant <br /> To ensure future maintenance and allow access for inspection, any development <br /> project which constructs stormwater facilities must have a Declaration of Covenant. <br /> Fill out and attach the Declaration of Covenant. For a copy,click on the Permitting <br /> Resources tab at everettwa.gov/I 985/Stormwater-Technical-Resources. <br /> City of Everett Public Works :'� <br /> Small Project Stormwater Site Plan Report for Projects in - $_- <br /> the Combined Sewer Area-April2021 iA5 <br />