Laserfiche WebLink
r < <br /> STEP 4. COMPLETE MINIMUM REQUIREMENTS <br /> The more information provided in these subsections typically corresponds to faster review and permit <br /> issuance times. Submitted checklists that lack the necessary information for review are considered <br /> incomplete and will be returned unprocessed to the applicant. <br /> Preparation of Stormwater Site Plan <br /> The purpose of this task is to convey all relevant information aboutthe proposed projectto the Cityfor review <br /> to ensure the project is in compliance with the current City and State stormwater management standards. <br /> This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br /> significant and insignificant aspects of the project with regards to stormwater management. <br /> Task 1: Describe existing site conditions <br /> Provide description of existing site conditions: <br /> The subject property is currently developed with an existing Single-Family <br /> Residence. The site consists primarily of vegetation though a gravel patio is <br /> located in the rear of hte property and a concrete walkway extends from the front <br /> entrance to the public ROW. CI <br /> Describe existing structures (location, type): <br /> A 771sf residence is located approximately 24' from the front property line. An <br /> existing 4' retaining wall and 48sf shed are located towards the back of the <br /> property, closer to the alley. <br /> Describe slopes on your site (flat, rolling, steep, %): <br /> The site slopes approximately 6% from the alley property line to the front <br /> property line. <br /> Describe hard surfaces (roof, ground treatment): <br /> Existing roof area of the main residence is approximately 910sf. The roof area of <br /> the existing detached shed is approximately 80sf. A concrete walkway connects <br /> the front entrance to the sidewalk. <br /> Describe vegetative surfaces (location, quantity ft2): <br /> The subject site consists primarily of vegetation including lawn and planting <br /> beds. Approximately 77% (4600sf) of the site is vegetated. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in J6—� <br /> the Combined Sewer Area-April 2021 CS7/5) <br />