My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1718 PINE ST 2022-04-05
>
Address Records
>
PINE ST
>
1718
>
1718 PINE ST 2022-04-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2022 11:32:55 AM
Creation date
4/5/2022 11:32:16 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
1718
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Describe drainage flow paths (direction, location): <br /> Drainage flow paths are oriented towards the east, slopwing downward towards <br /> Pine St. A previous owner installed French drain systems directing drainage <br /> away from the residence and to the east. <br /> Are there Critical Areas?What are they and where are they located relative to your project? <br /> (Check with the Planning Division at planning(a�everettwa.gov if you are unsure if the property is in <br /> close proximity to a Critical Area.): <br /> N/A <br /> : Task 2: Describe proposed project <br /> Describe your proposed project: <br /> Proposed 400sf DADU with attached 240sf garage and 60sf porch. A 10' x 23' <br /> paved parking stall is also proposed. Demolition of the existing shed will be <br /> necessary. <br /> How will your project change the existing condition?: <br /> The proposed project will remove some of the vegetation on site and replace it <br /> with impervious surface(s). <br /> Describe roofs, patios, driveways, or structures added: <br /> The proposed roof area is 875sf and the proposed parking pad will be 230sf. <br /> How will stormwater be managed in the final condition?: <br /> Stormwater shall be directed to existing vegetation on site. Gutters and <br /> downspouts to drain to splashblocks. <br /> Describe how the project will affect existing drainage systems onsite or on adjacent properties <br /> or both: <br /> Project will result in more impervious surface(s). Substantial vegetation shall <br /> remain onsite with drainage directed following existing vegetated slope on site, <br /> and away from neighboring properties. <br /> City of Everett Public Works <br /> (/___(5 <br /> Small Project Stormwater Site Plan Report for Projects in l <br /> the Combined Sewer Area-April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.