Laserfiche WebLink
Print Form <br /> Soil Management Plan Summary Form <br /> For Post-construction Soil Standard Snohomish County Planning and Development Services <br /> Achieving the Post-construction Soil Standard booklet instructions to carry out this Soil Management Plan. <br /> Project Information Complete all information on page 1,only site address Area: 1 (refer to lettered areas mapped on site plan) <br /> and permit number on additional pages. <br /> Site address/Lot Square footage:2,600 <br /> No. <br /> Selected soil treatment option: Option 1 Option 2 <br /> Permit Type Single Family <br /> X Option 3 Option 4 <br /> Permit Number If using option 2,select type of amendment rate: <br /> Pre-approved(2") Custom with %Target Soil <br /> Permit Holder <br /> Organic Matter <br /> Phone Area: (refer to lettered areas map <br /> ped on site plan) <br /> Square footage: <br /> Mailing Address <br /> Selected soil treatment option: Option 1 Option 2 <br /> Contact Person Richard Deccio P.E. <br /> Option 3 Option 4 <br /> If using option 2,select type of amendment rate: <br /> Phone 206-390-8374 <br /> [ Pre-approved(2') ❑Custom with %Target Soil <br /> Plan Prepared By Richard Deccio P.E. Organic Matter <br /> Attachments-attach the following to this plan: Area: (refer to lettered areas mapped on site plan) <br /> * Scale stormwater site plan drawings that include areas to be <br /> treated with Soil Treatment Options 1,2,3,4. Square footage: <br /> Selected soil treatment option: O tion 1 Option 2 <br /> *Completed Compost and Topsoil Calculation Worksheet results. pP <br /> Option 3 Option 4 <br /> *Original compost and/or topsoil test results reports demonstrating If using option 2,select type of amendment rate: <br /> that products contain adequate organic matter(for soil treatment [' Pre-approved(2") Custom with %Target Soil <br /> options 2)and meet topsoil soil quality standard. Organic Matter <br /> Record the compost and/or topsoil products to be used <br /> Note:Retain original delivery tickets for compost and/or topsoil <br /> products for verifi cation purposes. Compost Product#1: <br /> Soil Treatment Options for Areas Identified on Site Plan Test Results% <br /> Soil treatment options available: organic matter: Quantity in cubic yards <br /> *Option 1-Leave native soil undisturbed,and protect from Supplier <br /> compaction during construction. <br /> *Option 2-Amend existing soil in place. Compost Product#2: <br /> Test Results% <br /> *Option 3-For native soil:stockpile site duff and topsoil,and reapply organic matter. Quantity in cubic yards <br /> after grading and construction. <br /> Supplier <br /> *Option 4-Import topsoil mix with 8-13%soil organic matter content. <br /> FOR PDS USE ONLY Plan Approval Record Topsoil Product#3: <br /> Date: Reviewer. Approved: Test Results% <br /> Revisions Required: _ organic matter: Quantity in cubic yards <br /> Supplier <br /> Topsoil Product#4: <br /> Date: Reviewer. _ _ _ Approved: Test Results% <br /> Revisions Required: organic matter. Quantity in cubic yards <br /> Supplier <br /> Total cubic yards compost: Total cubic yards topsoil: <br /> Kymera 2-Lot SP Full Drainage Report <br /> Revised:April 21,2018 Page 18 <br />