Laserfiche WebLink
Native Soil—stockpile site duff and topsoil and reapph after grading and <br /> construction. <br /> Option 3 V . Enter lettered areas from site plan where this option will be used: <br /> LOT A <br /> • Enter combined square footage of lettered areas in thousands 2.5 <br /> (example:for 4,525 sq ft,enter 4.525;for 500 sq ft,enter 0.5) <br /> • Multiply combined square footage by 25 and enter product in box B: <br /> B 65 CYDS <br /> AMOUNT OF TOPSOIL TO BE STOCKPILED AND REAPPLIED IN THESE <br /> AREAS <br /> Import to psoil. <br /> • Enter lettered areas from site plan where this option will be used: <br /> Option 4 <br /> • Enter combined square footage of lettered areas in thousands -- <br /> (example:for 4,525 sq ft,enter 4.525;for 500 sq ft,enter 0.5) <br /> • Multipl, combined square footage by 25 and enter product in box C: <br /> C =Cubic Yards <br /> AMOUNT OF IMPORTED TOPSOITHESE NEEDED FOR THESE AREAS <br /> Order These.Amounts: <br /> Order,. '. • Enter amount in Box A: Cubic Yards of Compost <br /> • Enter amount in Box C: Cubic Yards of Topsoil <br /> Note: MR 5 is triggered on sites with more than 2,000 sq.ft.of new,replaced,or new plus replaced <br /> impervious surface,or 7,000 sq.ft.or greater of land disturbing activity. <br /> Effective September 30,2010 <br /> S:ICSC}Document Warehous tFORMSICurrent FormslCompost and Topsoil Calculation Worksheet 9_13_10.docx <br /> Kymera 2-Lot SP Full Drainage Report <br /> Revised:April 21,2018 Page 19 <br />