City of Everett 00 7200 - 14 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> working conditions that are unsanitary,hazardous, or dangerous to its health and safety as determined <br /> under construction, safety,and health standards promulgated by the Secretary of Labor. These <br /> requirements do not apply to the purchase of supplies or materials or articles ordinarily available on the <br /> open market, or contracts for transportation or transmission of intelligence. <br /> 4.4.9. Public Safety and Convenience <br /> The Contractor shall conduct its work so as to ensure the least possible obstruction to Traffic and <br /> inconvenience to the general public,business, organizations and residents in the vicinity of the Work and <br /> to reasonably protect persons and property. No roads or street shall be closed to the public except with <br /> the permission of the Owner's Representative and the proper governmental authority. Fire hydrants on or <br /> adjacent to the Work shall be accessible to fire fighting Equipment. Temporary provisions shall be made <br /> by the Contractor for the use of sidewalks,private and public driveways and proper functioning of gutters, <br /> sewer inlets, drainage ditches and culverts, irrigation ditches and natural water courses. <br /> 4.4.10.Access to Work <br /> Owner, Owner's Representative,their consultants and other representatives and personnel of Owner, I <br /> independent testing laboratories, and governmental agencies with jurisdictional interests will have access <br /> to the Site and the Work at reasonable times for their observation,inspecting, and testing. Contractor shall <br /> provide them proper and safe conditions for such access and advise them of Contractor's Site safety <br /> procedures and programs so that they may comply therewith as applicable. <br /> 4.4.11. Emergencies <br /> In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent <br /> thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give <br /> Owner's Representative prompt written notice if Contractor believes that any significant changes in the <br /> Work or variations from the Contract Documents have been caused thereby or are required as a result <br /> thereof. If Owner's Representative determines that a change in the Contract Documents is required be- <br /> cause of the action taken by Contractor in response to such an emergency, a Work Change Directive or <br /> Change Order will be issued. I <br /> 4.4.12. Trench Excavation <br /> For all trench excavations that exceed a depth of four feet,the Contractor must use adequate safety <br /> systems that meet the requirements of the Washington Industrial Safety and Health Act, chapter 49.17 <br /> RCW. <br /> 4.4.13 'COVID-19 Requirements , <br /> The Contractor shall be in compliance at all times with all governmental laws,regulations,requirements, <br /> and orders relating to COVID-19 applicable to the Work, including without limitation OSHA,L&I or <br /> other safety rules relating to COVID-19 and COVID-19 gubernatorial proclamations and orders. These <br /> laws,regulations,requirements, and orders are referred to as "COVID-19 Requirements." <br /> Contractor's Bid includes all costs necessary for the duration of the Work for compliance with COVID-19 I <br /> Requirements. Contractor's Bid takes into account that COVID-19 Requirements may create direct and <br /> indirect costs, including inefficiency and delay. <br /> Contractor shall have no entitlement to an adjustment or other increase to the Contract Sum for any direct or , <br /> indirect costs (including without limitation delay,cumulative impact, inefficiency or ripple costs)incurred <br /> by the Contractor to comply with COVID-19 Requirements. <br /> 1 <br /> 00 7200 - 14 GENERAL CONDITIONS <br />