My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 7200 - 17 <br /> I2022 Biosolids Removal and Disposal UT 3752-30 <br /> Contract. The Contractor may submit a schedule indicating Completion Date earlier than the end of <br /> I Contract Time,but Owner cannot guarantee its resources will be available to meet such schedule. Owner <br /> shall not pay or be liable for any additional compensation if the Contractor is not able to meet a schedule <br /> that indicates a Completion Date earlier than the end of Contract Time. <br /> I Failure to schedule Owner furnished or installed materials and Equipment for installation on or after its <br /> planned arrival pursuant to the Owner's contract with the supplier or failure to Notify the Owner of tasks <br /> dependent upon the fact or date of arrival of such Owner furnished materials and Equipment, constitute a <br /> I waiver by Contractor of any Contract Claim arising out of or related to the timeliness of the furnishing or <br /> installation of such material and Equipment. All schedules must allow for timely incorporation of any <br /> other's work under separate contract with Owner and for timely incorporation of work provided and <br /> installed by Owner. Unless otherwise expressly authorized in writing by the Owner's Representative,the <br /> IContractor must integrate the schedules with the Schedule of Values and unit price items so that each <br /> construction activity is represented by a dollar value. <br /> I Float in a Progress Schedule belongs to the Owner. <br /> Subcontractors shall review all schedules prior to submission to the Owner and Owner's Representative. <br /> At the Owner's option and sole discretion,Owner may require Contractor to obtain written acceptance of <br /> I each schedule by Subcontractors as practical and feasible, as the schedule relates to Subcontractors' work. <br /> Contractor shall not schedule any activity with an unrealistic,unduly long,or unduly short duration. <br /> Contractor shall use its best efforts in good faith to set reasonable durations for all activities. Contractor <br /> I shall not attempt to"grab the Float"or make any effort to use any Float in the Progress Schedule for the <br /> benefit of the Contractor. <br /> Contractor shall submit with each Application for Payment or progress pay estimate an updated Progress <br /> I Schedule,but no less often than monthly. If requested by the Owner's Representative or the Owner, <br /> Contractor shall prepare and submit updated Progress Schedules from time to time,which may be more <br /> frequent than monthly. <br /> IThe Contractor hereby expressly agrees and acknowledges that any failure by Contractor to provide <br /> accurate, complete, current and updated schedules with each and every progress pay estimate or <br /> Application for Payment constitutes a waiver of any and all claims or requests for adjustment of Contract <br /> Sum or Time that arise out of,result from, or are caused by, any Delay on the Project or scheduling of the <br /> Work. Timely submission of monthly updated schedules is a condition precedent to any later or <br /> subsequent Contract Claim or request for an adjustment of either Contract Sum or Time related to or <br /> I arising out of time, an alleged Delay, or the schedule or sequence of Work. Similarly,the parties agree <br /> the Owner may withhold progress pay estimates if updated schedules are not timely submitted. These <br /> remedies are cumulative and not exclusive of any other remedy. The Owner's use of one or more of these <br /> I remedies does not constitute an election or prevent the Owner from pursuing other remedies for this or <br /> other defaults. <br /> The Owner's Representative's review of any schedule shall not transfer any of the Contractor's <br /> I responsibilities to the Owner. The Contractor alone shall remain responsible for adjusting forces, <br /> equipment,and work schedules to ensure completion of the Work within the Contract Time. Review by <br /> the Owner or Owner's Representative shall not constitute approval or acceptance of the Contractor's <br /> construction means,methods, sequencing, logic, order,precedence and succession of activities or <br /> Contractor's ability to complete the Work in a timely manner. Any mistakes or errors in any schedule, <br /> including,but not limited to,mistakes or errors of logic, order,precedence, and duration, are and remain <br /> I the Contractor's. The Owner or Owner's Representative may comment upon the schedule. <br /> 5.2.2.2 Extensions of Contract Time <br /> Any requests for extensions in Contract Time,whether resulting from Extra Work directed by the Owner <br /> I <br /> or not, shall be accompanied by an analysis of schedules using the critical path method. This analysis <br /> shall include an updated schedule, an as-planned schedule, an as-built schedule,a but-for schedule, and <br /> narrative explaining the alleged causes, schedule impacts and all costs related to or arising out of the <br /> I00 7200 - 17 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.