My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 16 , <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> If requested by the Contractor,the Owner will arrange meetings with other contractors performing work <br /> on behalf of the Owner to plan coordination of construction activities. The Contractor shall inform itself <br /> of the planned activities of other contractors and will coordinate its work with the other contractors. <br /> Contractor shall notify the Owner of problems,interference or any difficulty with other contractors or <br /> workers engaged by the Owner. The Notice shall be sufficiently prompt and specific so as to allow the <br /> Owner to mitigate or avoid increased costs,time of performance, damages or injury. Contractor's failure <br /> to provide such Notice in a timely way shall be deemed a waiver and release of any and all Contract <br /> Claims relating to,arising out of, or caused by, any alleged interference,difficulty or problem with <br /> another contractor or worker engaged by the Owner. <br /> 5. PROGRESS AND COMPLETION <br /> 5.1. NOTICE TO PROCEED <br /> Following execution of the Contract by the Owner,the Owner or Owner's Representative will give the <br /> Contractor a written Notice to Proceed. Notwithstanding other provisions of the Contract,the Contractor <br /> shall not be obligated to perform Work,and the Owner will not be obligated to accept or pay for Work <br /> performed by the Contractor or be liable for any Delays,prior to delivery of the Notice to Proceed. The <br /> Owner's knowledge of Work being performed prior to delivery of the Notice to Proceed will not obligate <br /> the Owner to accept or pay for such Work. Contractor waives any and all Contract Claims for an <br /> adjustment of Contract Sum and Contract Time arising out of, or related to,work it performs prior to <br /> receipt of the Notice to Proceed. The Owner may issue partial Notices to Proceed. I <br /> 5.2. CONTRACT TIME <br /> 5.2.1. General , <br /> TIME IS OF THE ESSENCE IN PERFORMING THE CONTRACT. Failure to complete the <br /> Project within the contractually specified time may affect other Projects and Owner activities. Contract <br /> Time starts upon the later of the issuance of the Notice to Proceed or a date specified in the Notice to <br /> Proceed. The Contractor shall promptly start the Work as soon as possible after the date of the Notice to <br /> Proceed and shall prosecute the Work so that the various portions of the Project shall be completed in <br /> accordance with the Contract Time period. Contractor shall perform its work at such times and in such <br /> ways that the Work is not damaged by weather such as wind,rain,or snow. Contractor shall correct or <br /> repair at its sole expense any Work damaged by weather,irrespective of whether such damage is covered <br /> by insurance. No portions of the Work where acceptable quality will be affected shall be constructed <br /> while unfavorable conditions exist. By bidding on the Project and executing a Contract to perform the <br /> Work, Contractor agrees the contractually required completion dates are feasible,reasonable, and <br /> achievable for the Contract Sum. Contractor represents that it has considered all factors relevant to its <br /> price and achieving the Completion Dates,including,but not limited to,weather, Site access,labor <br /> conditions and the availability of materials,supplies and Equipment. Compliance with ARTICLE 10. <br /> NOTICE TO OWNER,ARTICLE 12. CONTRACT CLAIMS,and 5.2.2. Construction Schedule <br /> are conditions precedent to a request for,consideration of, and grant of,any extension of Contract Time. <br /> Failure to request a time extension in the manner and in the time required by this section, and the <br /> Specifications referred to herein, constitutes a waiver by the Contractor of any and all entitlement to an <br /> extension of time and any adjustment of Contract Sum arising out,or related to,such Delay. <br /> 5.2.2. Construction Schedule <br /> 5.2.2.1 General <br /> Contractor shall submit,update and maintain schedules as required by the Contract Documents. <br /> The Contractor shall provide sufficient material, equipment,and labor to meet the interim milestones, <br /> Substantial Completion,Physical Completion and Completion Dates provided by the Contract , <br /> Documents. The Owner allocates its resources to a Contract based on the total time allowed in the <br /> 00 7200 - 16 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.