My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett <br /> 00 7200 - 23 <br /> I2022 Biosolids Removal and Disposal UT 3752-30 <br /> 6. CHANGES <br /> I6.1 OWNER'S RIGHT TO DIRECT CHANGES TO THE WORK <br /> The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br /> 1 Contract nor release the surety, and the Contractor agrees to perform the Work as changed. Among <br /> others,these changes and alterations may include: <br /> I 1. Deleting or omit any part of the Work,Equipment or material to be provided under this Contract, <br /> and <br /> 2. Increasing or decreasing quantities, <br /> I 3. Altering Specifications, designs, or both, <br /> 4. Altering the way the Work is to be done, <br /> I 5. Adding new Work or Extra Work, <br /> 6. Altering facilities,Equipment,materials, services, or sites,provided by the Owner, and <br /> 7. Ordering the Contractor to accelerate or Delay Work. <br /> ' If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the Contract Sum <br /> and Contract Time,the Owner may,at its sole option,unilaterally direct the Contractor to implement any <br /> change by notice. The Owner shall not pay or be responsible or liable for any change implemented by the <br /> IContractor without explicit notice from the Owner to proceed. <br /> 6.2 EXTRA WORK <br /> I At its sole option,the Owner may(1)perform Extra Work itself, (2) employ others to do it, (3) direct the <br /> Contractor to perform the Extra Work at existing unit bid price, (4) direct the Contractor to perform the <br /> Extra Work at a mutually agreed upon price, or(5) direct the Contractor to perform the Extra Work on a <br /> IForce Account basis. <br /> 6.3 CHANGE ORDERS <br /> I Changes to the Work may result in an increase or decrease in Contract Sum, as provided in 9.2. <br /> PAYMENT FOR CHANGES. Requests for an increase in Contract Time must be made as provided in <br /> 5.2.2.2 Extensions of Contract Time, as applicable. Substantial changes in Contract Time, Contract <br /> I Sum or Work will often be negotiated and agreed between the Contractor and Owner before the Owner <br /> directs the Contractor to proceed with the change. <br /> If the Contractor and Owner agree on the scope of Work and any changes to Contract Sum and Contract <br /> I Time,the Contractor and Owner shall execute an agreed Change Order. However, if the Contractor and <br /> Owner do not agree,the Owner may, in its sole discretion, issue a unilateral Change Order changing the <br /> scope of Work and making any adjustments to the Contract Sum pursuant to 9.2.PAYMENT FOR <br /> I CHANGES and Contract Time in such amount and for such time as the Owner thinks appropriate. <br /> Contractor agrees to use the agreed and unilateral Change Order forms included in the Contract <br /> Documents or otherwise provided by Owner. The Contractor accepts all requirements,terms and <br /> I conditions of a Change Order by: signing it;writing a separate acceptance; or by failing to notify the <br /> Owner immediately in writing that Contractor disagrees with the Change Order and does not intend to be <br /> bound by its terms. <br /> I The Contractor waives all Contract Claims with respect to (and is estopped from denying its agreement <br /> with) any unilateral Change Order for which the Contractor does not immediately give Notice to the <br /> Owner as provided in ARTICLE 10.NOTICE TO OWNER and submit a Contract Claim as provided <br /> I in ARTICLE 12.CONTRACT CLAIMS. A unilateral Change Order that is not timely protested as <br /> provided in this section shall be full payment and final settlement of all asserted and unasserted Contract <br /> I00 7200 - 23 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.