My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 22 1 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> Contractor,take over suchportion or anyWork that isbehind 'schedule. In such case,the Owner's <br /> Representative will prepare a list of incomplete Work taken over by the Owner. The cost of Owner's <br /> work will be charged to and deducted from amounts due to the Contractor. The Substantial Completion <br /> date of the entire or a portion of the Project will be established as the date when the Owner actually <br /> begins using the Project or portion of the Project for its intended purpose. Division of responsibilities <br /> between Owner and Contractor,beginning of warranties, and any other issues relating to Substantial <br /> Completion shall be as specified in 5.7.SUBSTANTIAL COMPLETION. <br /> 5.7. SUBSTANTIAL COMPLETION <br /> When the Contractor considers the Work to be Substantially Complete and ready for its intended use,it <br /> shall give Notice to the Owner's Representative. The Notice shall include an itemized list of remaining <br /> incomplete Work. If the Owner's Representative determine the Work is not substantially complete,the <br /> Contractor will be notified in writing,identifying the reasons for such a determination. If the Owner's <br /> Representatives find the Work substantially complete,he or she will meet with the Contractor to(1) <br /> prepare a Punch List of incomplete items of Work; (2)define the division of responsibility between <br /> Owner and Contractor with respect to security, operation,maintenance,heat,utilities,insurance,and <br /> warranties; and(3) describe any other issues related to acceptance of the substantially completed Work. <br /> If the Owner's Representative is not an employee of the Owner,the Owner's Representative will write to <br /> the Owner upon reaching agreement with the Contractor, certifying that the Work is substantially <br /> complete,listing the items of incomplete Work, stating the date for completion of incomplete Work, <br /> defining the division of responsibilities,and setting forth any other terms related to acceptance. In such <br /> event,the Owner will review the Owner's Representative's certification that the Work is substantially <br /> complete. If the Owner concurs,the Owner will notify the Contractor in writing that the Work is <br /> accepted as substantially complete. Except for any portion(s)of Work specified for early completion or <br /> required by the Owner for early possession, Substantial Completion will not occur for any Work until the <br /> entire Project is ready for possession and use. The acceptance notice will include a Punch List of <br /> incomplete Work items and corrective Work, set the date for their completion and repair,describe the <br /> division of responsibility between the Owner and Contractor, and describe any other terms of acceptance. <br /> The Contractor will acknowledge receipt of the acceptance notice in writing,indicating acceptance of all <br /> of its terms and provisions. <br /> Subsequent to the Substantial Completion date,the Owner may exclude the Contractor from the Work , <br /> during such periods when construction activities might interfere with the intended operation of the <br /> Project. The Owner,however, shall allow the Contractor reasonable access for completion or correction <br /> of incomplete Punch List items. , <br /> 5.8. ACCEPTANCE OF WORK <br /> Upon completion of the Project,including,but not limited to,record drawings,as-builts,required reports <br /> and operations and maintenance manuals,the Contractor shall so notify the Owner's Representative in <br /> writing. Upon receipt of the notification,the Owner's Representative will promptly,by personal <br /> inspection,determine the actual status of the Work in accordance with the terms of the Contract. If the <br /> Owner's Representative finds materials,Equipment,or workmanship that do not meet the terms of the <br /> Contract,he or she will prepare a Punch List of such items and submit it to the Contractor. Following <br /> completion of the corrective Work by the Contractor,the Owner's Representative will notify the Owner <br /> that the Work has been completed in accordance with the Contract. The Owner shall make the final <br /> determination of acceptability and completion. For portions of the Project not previously accepted as <br /> substantially complete,the conditions of guarantee shall commence on the date that the Owner determines <br /> the Project is complete. I <br /> 00 7200 - 22 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.