My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 43 <br /> ' 2022 Biosolids Removal and Disposal UT 3752-30 <br /> 11. DIFFERING SITE CONDITIONS <br /> ' Upon discovery and before such conditions are disturbed, the Contractor shall promptly provide Notice to <br /> the City's Representative of: <br /> ' 1. Pre-existing subsurface or latent physical conditions at the site differing materially from <br /> those indicated in this Contract, or <br /> 2. Pre-existing unknown physical conditions at the site, of an unusual nature, differing <br /> ' materially from those ordinarily encountered and generally recognized as inhering in <br /> work of the character provided for in this Contract. <br /> Upon written request,the City's Representative shall determine whether the actual conditions <br /> ' encountered by the Contractor conditions are materially different and, if so, are the cause of a material <br /> increase or decrease in the Contractor's cost of performance of the Work, or extend the duration of the <br /> critical path of the schedule. Upon such determination,the City's Representative will make an adjustment <br /> of Contract Sum or Contract Time,as appropriate. Extensions of Contract Time will be evaluated in <br /> accordance with 5.2.2.2 Extensions of Contract Time. <br /> The City's Representative's determination that differing site conditions do not exist and/or the appropriate <br /> ' adjustment in Contract Sum or Contract Time(if any) shall be final. If there is a decrease in the cost or <br /> time required to perform the Work,failure of the Contractor to notify the City's Representative of the <br /> differing site condition shall not affect the City's right to make an adjustment in the Contract Sum or <br /> Contract Time. Additionally, no Contract Claim or adjustment of Contract Sum or Contract Time shall <br /> be allowed unless the Contractor has followed the procedures provided for in this Contract,including,but <br /> not limited to, furnishing timely Notice of the event and its effect on Contract Time and Contract Sum as <br /> ' required herein. <br /> Contractor shall in no event be entitled to a Contract Claim or adjustment of Contract Sum or Contract <br /> Time based on an allegation that the pre-existing subsurface or latent physical conditions at the site <br /> ' differing materially from those indicated in this Contract unless Contractor establishes that it reasonably <br /> relied on the conditions indicated in this Contract when making its bid,that the actual conditions <br /> encountered on the site differed materially from those indicated in this Contract, and that such materially- <br /> different conditions were not foreseeable at the time of its bid. <br /> f12. CONTRACT CLAIMS <br /> 12.1 GENERAL <br /> If the Contractor requests or believes for any reason that it is entitled to an adjustment of Contract Sum or <br /> Contract Time,or if the Contractor has a Dispute with the Owner and wants the Owner to take some <br /> ' action, or refrain from taking action,the Contractor shall file a Contract Claim as provided in this section. <br /> A timely and complete Contract Claim is a condition precedent to any entitlement by the Contractor to an <br /> adjustment of Contract Sum or Contract Time. No Contract Claim shall be allowed unless the Contractor <br /> has given Notice as required by 10. NOTICE TO OWNER and/or 11. DIFFERING SITE <br /> CONDITIONS and otherwise fully complies with the requirements of this section 12. CONTRACT <br /> CLAIMS. The Contractor waives any Contract Claim if: (a)Notice was not timely given in accordance <br /> ' with the requirements of 10. NOTICE TO OWNER and/or 11. DIFFERING SITE CONDITIONS; <br /> (b)the Owner's Representative is not afforded reasonable access by the Contractor to complete records, <br /> including,but not limited to, correspondence,job diaries, and actual cost and additional time incurred; (c) <br /> a Contract Claim is not timely filed as required by the General Conditions; or(d) adequate,accurate, <br /> contemporaneous and segregated supporting time and expense records are not kept and maintained. The <br /> fact that the Contractor provided proper and timely Notice,provided a properly filed Contract Claim, or <br /> 00 7200 - 43 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.