Laserfiche WebLink
City of Everett 01 1100 - 3 <br /> ' 2022 Biosolids Removal and Disposal UT 3752-30 <br /> B. Work sites are available from 06:00 — 22:30 seven days a week excluding City <br /> ' observed holidays unless otherwise approved by the City's Project Manager. <br /> Any additional or alternate work hours will require advance approval and <br /> coordination with the City's Project Manager. See 01 5000 for Noise Ordinance. <br /> 1.6 CITY OCCUPATION AND OPERATION <br /> A. The City intends to operate all treatment lagoons during the project. Contractor <br /> ' is expected to coordinate with City to avoid disruption to ongoing wastewater <br /> treatment processes or operations. <br /> ' B. Contractor will be responsible for locking the gated entrances to the Biosolids <br /> Pad outside of working hours. Contractor City will not accept liability for damages, <br /> ' vandalism, theft, or other loss due to failure of Contractor to maintain site security. <br /> See Section 01 3553. <br /> ' C. The Contractor shall coordinate with City in scheduling operations to minimize <br /> conflict with concurrent construction projects, plant operations and maintenance <br /> activities. <br /> 1.7 BIOSOLIDS REMOVAL AND DEWATERING <br /> A. Decontamination <br /> 1. Contractor shall decontaminate all equipment prior to starting work at the <br /> WPCF. See 01 7400 Invasive Species Equipment Decontamination. <br /> ' B. Dredging <br /> ' 1. Dredging Equipment <br /> a. The Contractor will provide the dredge and all necessary equipment <br /> to dredge biosolids from the WPCF Oxidation Pond. <br /> b. The Contractor will also provide all fuel and other equipment and <br /> appurtenances necessary to perform and support the dredging <br /> operations. <br /> ' c. Contractor is responsible to maintain and repair any damage incurred <br /> to the dredge during dredging operations. <br /> 2. Spills <br /> ' a. Any spillage of polymer, fuel, or any debris or materials associated <br /> with the Contractor's activities or operations must be reported to the <br /> City's Project Manager as soon as possible. <br /> 01 1100 - 3 SUMMARY OF WORK <br />