My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 2600 - 1 <br /> I2022 Biosolids Removal and Disposal UT 3752-30 <br /> ISECTION 01 2600 - CONTRACT MODIFICATION PROCEDURES <br /> I1.1 SUMMARY OF MODIFICATIONS PROCEDURES <br /> A. Changes to the Work may be required due to field conditions, requests made by <br /> I the Owner, clarifications to the bid documents, or other needs that result in a <br /> change in the cost of the work and/or change in the number of contract days per <br /> 00 7200 General Conditions, Article 6. The changes to the work will be tracked <br /> I individually as Request for Change Proposals (RFCP). Request for Change <br /> Proposals may either be prepared as a Field Directive, or as a request for pricing <br /> prior to proceeding with the work. <br /> IB. A change order will be issued for one or more RFCP's grouped into a single <br /> change order. Payment for changed work cannot be paid until the change order <br /> Iis finalized and approved as outlined per 00 7200 General Conditions, Article 6. <br /> C. The Request for Change Proposal shall clearly identify all labor, material, <br /> I equipment, and incidentals, including subcontractor's and supplier's invoices or <br /> quotes as well as Contractor's timecards. A reference from the latest approved <br /> schedule shall be attached justifying any time extension request. Mark ups for <br /> I all overhead, profit, bond cost, B & 0 taxes, and insurance shall be added per 00 <br /> 7200. The form included at the end of this section will be used for directing the <br /> work to be done in one of the two manners described below. <br /> ID. Contractor, and Subcontractors where required, shall provide a breakdown of <br /> labor costs including basic wage rates, fringe benefits, FICA, FUTA and SUCA <br /> I add-ons, per 00 7200 General Conditions. Where premium time is involved, the <br /> Contractor shall provide a breakdown of costs in the same detail. <br /> 1.2 FIELD DIRECTIVE MODIFICATION PROPOSALS <br /> A. Changed conditions and/or unanticipated circumstances may require immediate <br /> lrevisions to Work which are essential and from which a delay would result in a <br /> time and or cost penalty to the project. When such a condition exists, the Owner <br /> Ishall issue a written Field Directive to the Contractor. <br /> B. The Owner will provide direction for the Contractor identifying the necessary <br /> I changes to be made. The Field Directive shall be identified with a Request for <br /> Change number. The Contractor will provide pricing per 1.1 of this section within <br /> 15 days of the completion of the work. <br /> I <br /> I01 2600 - 1 CONTRACT MODIFICATION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.