My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3553 - 1 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> SECTION 01 3553 - SECURITY PROCEDURES <br /> 1.1 SUMMARY <br /> A. Section Includes: Procedures to maintain security including unauthorized entry, <br /> vandalism, and theft to buildings and grounds at Project site. <br /> B. Contractors shall understand that maintaining security at each of the City's sites <br /> is of the utmost importance and should the Contractor fail to adhere to the <br /> ' agreed upon security procedures access may be limited to the hours associated <br /> within the working hours of City staff. <br /> ' C. Related Sections: <br /> 1. Section 01 3119 - Project Meetings <br /> ' 2. Section 01 5000 - Temporary Facilities and Controls <br /> 1.2 SECURITY PROGRAM <br /> A. Discuss with City, at Preconstruction Meeting specified Section 01 3119, a <br /> security program to prevent unauthorized entry and to protect against other <br /> security problems, including loss due to theft, vandalism, and fire. <br /> ' B. Arrange with City for access through locked gates as necessary to perform <br /> Work of this Contract. <br /> 1. Contractor is responsible for supplying a keyed padlock to secure the <br /> ' gates at Water Pollution Control Facility Biosolids Pad. Contractor will <br /> coordinate with City to place lock in the daisy chain securing these gates. <br /> C. Establish adequate flood lighting to allow monitoring of Project site during <br /> morning and evening hours. Contractor is responsible to position lighting to <br /> avoid glare shining towards residential areas surrounding the WPCF. <br /> ' D. Contractor shall note that the City's Biosolids Pad is monitored by security <br /> cameras; however, this does not exclude the contractor from taking measures <br /> ' to secure and protect his equipment from theft or vandalism. <br /> 1.3 STORAGE AND PROTECTION <br /> A. Provide for secure lockup of stored materials and take additional measures to <br /> protect against theft vandalism, and other loss of property belonging to City <br /> located on site and at off-site facilities. <br /> I <br /> 01 3553 - 1 SECURITY PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.