Laserfiche WebLink
I <br /> City of Everett 01 3553 - 2 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 I <br /> 1.4 ENTRY CONTROL <br /> A. Provide City with list of Contractor staff that will be working at each site. City I <br /> staff will check the list prior to granting access at WPCF. Thus, Contractor must <br /> keep the list up to date. 1 <br /> B. Restrict entrance of unauthorized persons and vehicles into construction areas. <br /> C. Maintain security of construction fencing and gates as approved by City in I <br /> advance. Lock at end of each working day. <br /> D. Maintain security site lighting systems as approved by City in advance. I <br /> E. Maintain public access to areas outside of project limits and coordinate with City <br /> at least 2 weeks in advance of planned disruptions to the public access to the I <br /> adjacent areas outside of the project limits. <br /> END OF SECTION 01 3553 I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> 01 3553 - 2 SECURITY PROCEDURES <br /> I <br />