My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 4200 - 1 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> SECTION 01 4200 - REFERENCES <br /> 1.1 ORGANIZATION AND FORMAT OF SPECIFICATIONS <br /> A. Division and paragraph numbers, as listed in the "Table of Contents" of the <br /> Specifications Book and the Items of Work included under the headings generally <br /> conform with the "Uniform Construction Index" of the Construction Specifications <br /> Institute (C.S.I.). Numbering of paragraphs and divisions, and trade headings are <br /> merely for convenience and identification, and may not be consecutive. <br /> 1.2 NUMBER OF SPECIFIED ITEMS REQUIRED <br /> ' A. Wherever in these Specifications an article, device or piece of equipment is <br /> referred to in the singular number, such reference applies to all and as many such <br /> articles as are shown on the Drawings or required to complete the installation. <br /> 1.3 SPECIFICATIONS OF MANUFACTURER <br /> A. Wherever in these Specifications an article, device or piece of equipment is <br /> ' referred to by the Manufacturer Model Number, Serial Number of Manufacturer's <br /> standard product indication, the specification of that article, device or piece of <br /> equipment shall hereby be considered to be included within these Specifications. <br /> t For the purposes of substitution, such specification shall be deemed to be the <br /> basis for the City's decision for substitution approval or disapproval. No <br /> substitutions shall be considered prior to Award of the Contract. <br /> 1.4 DEFINITIONS <br /> ' A. The following terms are used in the Contract Documents and are defined as <br /> follows: <br /> ' 1. The terms"Owner" and "City" mean the same and shall be interchangeable. <br /> 2. The terms "approved" and "for approval" mean "approved by the City". <br /> ' 3. The term "coordinate" means "satisfactorily combine the Work of All Trades <br /> for a complete and operating installation". <br /> 4. The term "selected" means "as selected by the City." <br /> 5. The term "provide" means "furnish and install". <br /> 6. The term "City" means "City's Representative". <br /> 7. The term "directed" means "as directed by the City's Representatives". <br /> 8. Where the terms "or approved" and "or approved equal" are used, the City's <br /> Representative is the sole judge of the quality and suitability. <br /> 9. The term "indicated" means "as indicated in these Contract Documents". <br /> 01 4200 - 1 REFERENCES <br />
The URL can be used to link to this page
Your browser does not support the video tag.