Laserfiche WebLink
City of Everett 01 4500 - 2 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> Representative will meet to discuss changes to sampling, storage and testing <br /> procedures. ' <br /> 1.2 DEFINITIONS <br /> A. Quality-Assurance Services: Activities, actions, and procedures performed <br /> before and during execution of the Work to guard against defects and deficiencies <br /> and ensure that proposed construction complies with requirements. <br /> B. Quality-Control Services: Tests, inspections, procedures, and related actions <br /> during and after execution of the Work to evaluate that completed construction <br /> complies with requirements. Services do not include contract enforcement <br /> activities performed by Engineer. <br /> C. Testing Agency: An entity engaged to perform specific tests, inspections, or both. <br /> Testing laboratory shall mean the same as testing agency. <br /> 1.3 SUBMITTALS <br /> A. Qualification Data: For testing agencies as specified in Section 1.4 Quality 1 <br /> Assurance, to demonstrate their capabilities and experience, the agency must <br /> include proof of qualifications in the form of a recent report on the inspection of <br /> the testing agency by a recognized authority. <br /> B. Delegated-Design Submittal: In addition to Shop Drawings, Product Data, and <br /> other required submittals, submit a statement, signed and sealed by the <br /> responsible design professional, for each product and system specifically <br /> assigned to Contractor to be designed or certified by a design professional, , <br /> indicating that the products and systems are in compliance with performance and <br /> design criteria indicated. Include list of codes, loads, and other factors used in <br /> performing these services. <br /> C. Reports: Prepare and submit certified written reports that include the following: <br /> 1. Date of issue. , <br /> 2. Project title and number. <br /> 3. Name, address, and telephone number of testing agency. <br /> 4. Dates and locations of samples and tests or inspections. <br /> 5. Names of individuals making tests and inspections. <br /> 6. Description of the Work and test and inspection method. 1 <br /> 7. Identification of product and Specification Section. <br /> 8. Complete test or inspection data. <br /> 9. Test and inspection results and an interpretation of test results. ' <br /> 10. Ambient conditions at time of sample taking and testing and inspecting. <br /> I <br /> 01 4500 - 2 QUALITY CONTROL <br /> I <br />