My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Washington State Department of Labor and Industries <br /> ' Policy Statement <br /> (Regarding the Production of"Standard" or "Non-standard" Items) <br /> Below is the department's (State L&I's) list of criteria to be used in determining whether a <br /> prefabricated item is "standard" or"non-standard". For items not appearing on WSDOT's <br /> predetermined list, these criteria shall be used by the Contractor (and the Contractor's <br /> ' subcontractors, agents to subcontractors, suppliers, manufacturers, and fabricators) to <br /> determine coverage under RCW 39.12. The production, in the State of Washington, of <br /> non-standard items is covered by RCW 39.12, and the production of standard items is not. <br /> ' The production of any item outside the State of Washington is not covered by RCW 39.12. <br /> 1. Is the item fabricated for a public works project? If not, it is not subject to RCW 39.12. <br /> ' If it is, go to question 2. <br /> 2. Is the item fabricated on the public works jobsite? If it is, the work is covered under <br /> RCW 39.12. If not, go to question 3. <br /> ' 3. Is the item fabricated in an assembly/fabrication plant set up for, and dedicated <br /> primarily to, the public works project? If it is, the work is covered by RCW 39.12. If not, <br /> ' go to question 4. <br /> 4. Does the item require any assembly, cutting, modification or other fabrication by the <br /> supplier? If not, the work is not covered by RCW 39.12. If yes, go to question 5. <br /> ' 5. Is the prefabricated item intended for the public works project typically an inventory <br /> item which could reasonably be sold on the general market? If not, the work is covered <br /> by RCW 39.12. If yes, go to question 6. <br /> 6. Does the specific prefabricated item,generally defined as standard, have any unusual <br /> characteristics such as shape, type of material, strength requirements, finish, etc? If yes, <br /> ' the work is covered under RCW 39.12. <br /> Any firm with questions regarding the policy, WSDOT's Predetermined List, or for <br /> determinations of covered and non-covered workers shall be directed to State L&I at(360) <br /> 902-5330. <br /> I <br /> I <br /> I <br /> Supplemental to Wage Rates 1 <br /> 01/05/2022 Edition, Published January 5, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.