Laserfiche WebLink
I <br /> c. Schedule I <br /> i. Bid Opening — January 18th, 2022 <br /> ii. Anticipated Notice to Proceed — March 1`4th, 2022 I <br /> d. Bid Documents <br /> i. Bid Form — Payment is for dry tons <br /> 1. Each truckload shall be sampled (3 grabs) by the contractor I <br /> to verify the minimum TS of 28% to be eligible for payment <br /> ii. Decontamination — pressure wash with hot water all equipment that <br /> will come in contact with the Ox Pond I <br /> 4. Questions? <br /> a. Email additional questions to Hanna Lintukorpi 1 <br /> b. Addendum published after January 11th with notes from Pre-bid meetings <br /> 5. Site Visit/Sampling I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />