My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2022 WPCF Biosolids Removal and Disposal <br /> I Pre-Bid Walk Agenda <br /> 10:30 a.m. 1/9&11/22 <br /> I <br /> 1. Greetings <br /> I a. Contractor Sign In <br /> b. Introductions <br /> I 2. City Team Members <br /> a. Project Manager— Hanna Lintukorpi (hlintukorpi(a�everettwa.gov) <br /> b. Onsite Manager— Mike Robinson <br /> I c. WPCF Pant Manager— John Smit <br /> d. WPCF Senior Wastewater Operator— Eddie Jones <br /> 1 3. Project Overview <br /> a. Work Area <br /> Dredging - south end of Oxidation Pond, west of Biosolids Pad <br /> Ii. <br /> ii. Solids handling - Biosolids Pad <br /> iii. Water <br /> The Biosolids Pad has potable (2) water available. <br /> I1. <br /> Contractor is responsible for determining if this water source <br /> is adequate for their operational needs. Any additional water <br /> use shall be the responsibility of the contractor. <br /> I2. The City has non-potable (3) water at the WPCF site for wash <br /> down and site cleaning. <br /> I iv. Power <br /> 1. City has provided 1200-amp 3-phase power to the Biosolids <br /> Pad. Electrical power is available via three 300 amp and one <br /> I 150 amp terminals. Quick disconnects and ground fault <br /> protection are not provided. Any additional electrical power <br /> needs shall be the responsibility of Contractor. <br /> I 2. Contractor is responsible for providing licensed and qualified <br /> personnel to connect to power as well as all necessary <br /> equipment. <br /> I 3. All lighting must be provided by the Contractor as necessary. <br /> v. Contractor must provide temporary restroom facilities <br /> b. Access <br /> I i. Access site through Biosolids gate <br /> ii. Daily sign in at WPCF Main building <br /> iii. Contractor to secure gate at end of day <br /> I iv. Contractors will be sharing the use of pad and the scale <br /> v. Work site available between 6:00 — 10:30 seven days a week <br /> 1. Noise Ordinance - 7:00 AM to 10:00 PM on weekdays, 8:00 <br /> IAM to 6:00 PM on weekends and state holidays <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.