Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />In the event that the temporary surtace subsides after the initial placement, additional <br />MC 250 or HMA (as approved by the Engineer) and crushed surfacing shall be applied <br />as necessary to mairtain the surface. <br />Stockpite of plant mix and crushed surfacing for temporary patching shall be provided <br />on the site by the Contractor. <br />Prior to final restoration of the pavement, the Contractor shall be responsible for <br />removing and disposing of temporary pavement patching materials. <br />5-06.3�7) Incidental Pavement Patching <br />Incidental pavement patching shall be done only at the direction of the Engineer for <br />patching and restoring areas between the back of new sidewaiks and adjacent asphalt <br />driveways, paving ramps at the ends of sidewalks, and gutters that are adjusted to <br />grade. <br />Asphalt for incidental pavement patching shall be HMA CL 1/2", PG 64-22. <br />5-06.4 Measurement <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B— Bid Item Descriptions of these Special Provisions and Section 1- <br />09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />5-OG.S Payment <br />Payment for bid items of Work completed pursuant to the Contract Documents will be as <br />described in Division B— Bid Item Descriptions of these Special Provisions and Section 1- <br />09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />3 Ave Detention Pond Retrofit Division 5— SURFACE TREATMEN7S ANO PAVEMENTS December �1, 2014 <br />WO No. — UP3531 SP -138 <br />