Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />5-04.4 Measurement <br />Delete all paragraphs of 5-04.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B— Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />5-05.5 Payment <br />Delete all paragraphs in 5-05.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B— Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />Supplement Division 5 of the Standard Specifications by adding the following: <br />5-06 PAVEMENT PATCHING <br />��RR�ff� <br />5-06.1 Description <br />This Work shall consist of the reconstruction and patching of trenches and other <br />excavations in paved streets and other paved areas. <br />5-06.2 Materials <br />Provide materials conforming to the requirements specified for the materials in Sections 5- <br />04 8 5- 05 of the Standard Specifications except as modified by these Special Provisions. <br />For HMA pavement patching provide HMA CL 1/2", PG 64-22 as specif;ed in Section 5-04 <br />of the Standard Specifications. <br />Provide asphalt for temporary pavement patch as either: cold mix asphalt (MC 250) per <br />Section 9-02 of the Standard Specifications or hot mix asphalt (HMA CL 1/2", PG 64-22). <br />Mineral aggregate of MC 250 shall meet the same requirements as the aggregates used in <br />HMA CL 1/2", PG 64-22. <br />For tack coat provide emulsified asphalt grade CSS-1 as specific:d in 9-02.1(6) of the <br />Standard Specifications. <br />For cement concrete pavement patching provide Type III (H.E.S.) with minimum 4,000 psi <br />28-day compressive strength and having curing time of five days. <br />Provide crushed surfacing top course used for pavement patching conforming to the <br />requirements of 9-03.9(3) of the Standard Specifications. <br />5-06.3 Construction Requirements <br />5-06.3(1) General <br />Schedule pavement patching to accommodate the demands of traffic and perform as <br />rapidiy as possible to provide maximum safety and convenience to public traffic. <br />Placing and c�mpact lhe trench backfill and the preparation and compaction of the <br />subgrade in accordance with the various applicable sections of the Standard <br />Specifications except as modified by these Special Provisions. <br />Before the pavement patch is to be constructed saw cut the pavement so that the <br />marginal edges of the patch will form a rectangular shape with straight edges and <br />vertical faces. <br />Provide signs, barricades, lights and other warning devices in accordance with the <br />requirements of the "Manual on Uniform Traffic Control Devices" and they maintain 24- <br />hours a day until the patching work is completed and ready for traHic. <br />3 Ave Detention Pond Retrofit Division 5— SURFACE TREATMENTS AND PAVEMENTS December 31, 2014 <br />WO No. — UP3531 SP -136 <br />