Laserfiche WebLink
E <br />3 <br />0 <br />3 <br />0 <br />0 <br />0 <br />4 <br />W <br />N <br />r <br />H <br />ry <br />Lu <br />� w <br />Q <br />�o <br />aQ <br />J� <br />w Q <br />W <br />mw <br />Lu <br />n� <br />0 0 <br />a <br />N <br />EL V <br />EL Lu <br />m O <br />v ate. <br />N N <br />ow <br />ox <br />�_j <br />�_ <br />w Z <br />r) oa <br />O 3 <br />0. Ll <br />0 <br />ml <br />m <br />61 <br />I <br />I <br />I <br />A <br />,t <br />WI ASSEMBLY <br />Lu <br />< ' <br />II <br />—� <br />oI <br />' <br />Lu 4z) I ' I <br />< <br />MATERIALS <br />FINISH PER SCHEDULE <br />ARCHITECTURAL WALL PANEL (AWP) <br />CLIP SYSTEM (DRAINAGE CAVITY) <br />WEATHER RESISTIVE BARRIER (FLUID -APPLIED) # <br />PLYWOOD SHEATHING [31 <br />WOOD STUD FRAMING <br />THERMAL BATT INSULATION <br />VAPOR BARRIER <br />MATERIAL AND FINISH PER SCHEDULE <br />$ ARCHITECTURAL WALL PANEL CLIP SYSTEM <br />INCLUDING ACCESSORIES HARDWARE SPACERS AND <br />COMPONENTS FOR DRAINAGE CAVITY SYSTEM. <br />## VAPOR PERMEABLE AIR BARRIER. <br />FI ASSEMBLY <br />LQ LU <br />'. <br />y . <br />® .� = 4 <br />y <br />a - -f ,r< _.-,_.- ._.-;_.. <br />MATERIALS <br />MATERIAL AND FINISH PER SCHEDULE <br />CAST -IN -PLACE CONCRETE SLAB ON GRADE [41 <br />WATERPROOFING SYSTEM <br />CAPILLARY BREAK LAYER (4 INCH MINIMUM) # <br />¢ RECESSED SLAB FOR FLOOR FINISHES AS <br />REQUIRED. <br />* REFER TO GEO-TECHNICAL REPORT. <br />RI ASSEMBLY <br />MATERIALS <br />W2 ASSEMBLY <br />MATERIALS <br />FINISH PER SCHEDULE <br />FINISH PER SCHEDULE <br />SINGLE -PLY MEMBRANE ROOFING <br />CONCRETE MASONRY UNIT (VENEER) <br />< ^ <br />W <br />114" COVER BOARD <br />AIR SPACE (DRAINAGE CAVITY) <br />RIGID INSULATION (C.I.) <br />II <br />STAINLESS STEEL VENEER TIES <br />PLYWOOD SHEATHING C31 <br />WEATHER RESISTIVE BARRIER (FLUID -APPLIED) * <br />a " <br />MANUFACTURED WOOD TRUSSES <br />PLYWOOD SHEATHING [31 <br />LL_ <br /># <br />Cl) Lu <br />z I II <br />WOOD STUD FRAMING <br />THERMAL BATT INSULATION <br />® <br />® <br />a REFER TO STRUCTURAL DRAWINGS FOR MEMBER <br />SIZES AND LAYOUT. <br />VAPOR BARRIER <br />a <br />MATERIAL AND FINISH PER SCHEDULELu <br />3 <br />cz 0 I 910 <br />3 <br />° FASTENED INTO WOOD STUD FRAMING. <br />1 <br />� 6 <br />$# VAPOR PERMEABLE AIR BARRIER. <br />BUILDIN('7"AS"'SEMBLY <br />NOTES <br />1. WALL TYPES: REFER TO FLOOR PLAN FOR <br />WALL TYPE LEGEND. <br />FOOTNOTES <br />2. REFER TO EXTERIOR ELEVATIONS FOR EXTEND OF EXTERIOR WALL ASSEMBLY. <br />[0 INSTALL MEMBRANE FLASHING C ALL PENETRATIONS THRU WEATHER RESISTIVE <br />BARRIER FOR WATERTIGHT INSTALLATION. INSTALL MEMBRANE FLASHING <br />3. <br />REFER TO ROOF PLAN FOR ROOF ASSEMBLY <br />LOCATIONS. <br />ACCORDING TO MANUFACTURERS STANDARD INSTALLATION DETAILS. <br />4. <br />EXTERIOR FINISHES: REFER TO EXTERIOR FINISH SCHEDULE. <br />[21 EXTERIOR PLYWOOD SHEATHING: REFER TO <br />SPECIFICATION DIVISION 06, SHEET G050. <br />5. REFER TO BUILDING EXTERIOR OPENING PROTECTION <br />LEGEND FOR EXTERIOR WALL OPENING MEMBRANE <br />[31 REFER TO STRUCTURAL DRAWINGS FOR REINFORCING STEEL. <br />MEMBRANE FLASHING REQUIREMENTS. <br />6. <br />REFER TO BUILDING THERMAL ENVELOPE LEGEND FOR INSULATION VALUES AND INSTALLATION REQUIREMENTS. <br />COLORS AND MATERIALS SCHEDULE <br />SYMBOLI <br />MATERIAL <br />MANUFACTURER <br />SPECIFICATIONS <br />COLOR / PATTERN / TYPE <br />LOCATION <br />DIVISION 3 - CONCRETE <br />CONC-I I ARCHITECTURAL CONCRETE - - COLOR: NATURAL GRAY. TEXTURE: SMOOTH 1EXPOSED VERTICAL SURFACES <br />DIVISION 4 - MASONRY <br />CMU-I <br />CONCRETE MASONRY UNIT <br />BASALITE <br />SHAPE: SPLIT FACE (4-6-I6) <br />COLOR: MESA BLUFF <br />REFER TO EXTERIOR ELEVATIONS <br />CMU-2 <br />CONCRETE MASONRY UNIT <br />BASALITE <br />SHAPE: GROUND FACE (4-8-16) <br />COLOR: MESA BLUFF <br />REFER TO EXTERIOR ELEVATIONS <br />CMU-3 <br />CONCRETE MASONRY UNIT <br />BASALITE <br />SHAPE: SPLIT FACE (8-8-16) <br />COLOR: MESA BLUFF <br />DUMPSTER ENCLOSURE <br />CMU-4 <br />CONCRETE MASONRY UNIT <br />BASALITE <br />SHAPE: GROUND FACE (8-8-16) <br />COLOR: MESA BLUFF <br />DUMPSTER ENCLOSURE <br />CSMU-1 <br />CAST STONE MASONRY UNIT <br />MUTUAL MATERIALS <br />SHAPE: SLOPED CAP (10-4-I6) <br />COLOR: MESA BLUFF <br />DUMPSTER ENCLOSURE <br />M-1 <br />MORTAR <br />DAVIS COLORS <br />- <br />COLOR: <br />DIVISION 5 - METALS <br />MF-I <br />METAL FABRICATIONS (AESS) <br />JAESS MEMBERS AND FABRICATION <br />COLOR: PT-4 <br />DUMPSTER ENCLOSURE <br />ALUM-2 <br />PRE -FINISHED ALUMINUM CANOPY <br />MAPES <br />ILUNISHADE CANOPY <br />COLOR: BRONZE BAKED ENAMEL <br />IREFER TO EXTERIOR ELEVATIONS <br />DIVISION 7 - THERMAL AND MOISTURE PROTECTION <br />ALUM -I <br />ALUMINUM FLASHING AND TRIM <br />KAWNEER <br />REFER TO STOREFRONT SYSTEM SCHEDULE <br />FINISH: ANODIZED DARK BRONZE #40 <br />STOREFRONT SYSTEM FLASHING AND <br />TRIM <br />AWP-i <br />ARCHITECTURAL WALL PANEL <br />NICHIHA FIBER CEMENT <br />ILLUMINATION SERIES: AWP 1818, HORIZONTAL <br />[31 <br />COLOR: <br />AWP-2 <br />ARCHITECTURAL WALL PANEL <br />NICHIHA FIBER CEMENT <br />ILLUMINATION SERIES: AWP 1818, HORIZONTAL <br />131 <br />COLOR: <br />MTL-I <br />METAL FLASHING AND TRIM <br />AEP SPAN <br />- <br />COLOR: AEP SPAN COOL DARK BRONZE <br />REFER TO EXTERIOR ELEVATIONS <br />MTL-2 <br />METAL FLASHING AND TRIM <br />- <br />- <br />COLOR: MATCH AWP-1 <br />REFER TO EXTERIOR ELEVATIONS <br />SPMR-1 <br />SINGLE -PLY MEMBRANE ROOFING <br />CARLISLE SYNTEC SYSTEMS <br />60 MIL TPO MEMBRANE <br />COLOR: WHITE <br />ROOF MEMBRAINE <br />DIVISION 8 -OPENING <br />GL-I <br />INSULATED GLASS <br />PPG .INDUSTRIES <br />INSULATED GLAZING UNIT: [41 <br />COLOR: CLEAR <br />EXTERIOR GLAZING: <br />WINDOWS/STOREFROINTS [21 <br />HDW-I <br />HARDWARE <br />- <br />- <br />- <br />REFER TO DOOR HARDWARE SCHEDULE <br />HM-1 <br />HOLLOW METAL DOOR AND FRAME <br />SDI OR NAAM MEMBERS <br />- <br />COLOR: [31 <br />LVR-1 <br />LOUVERS <br />GREENHECK <br />ALUMINUM; MODEL ESJ-401 42"x24" <br />FINISH: KYNAR 3 COAT, COLOR DARK BRONZE <br />- <br />SF -I <br />STOREFRONT SYSTEM <br />KAWNEER <br />REFER TO STOREFRONT SYSTEM SCHEDULE <br />FINISH: ANODIZED DARK BRONZE #40 IREFER <br />TO SCHEDULES [11 <br />DIVISION 9 - FINISHES <br />PT-1 <br />PAINT <br />SHERWIN WILLIAMS <br />MPI PREMIUM GRADE <br />COLOR: SW7547 SANDBAR <br />REFER TO EXTERIOR ELEVATIONS <br />PT-2 <br />PAINT <br />SHERWIN WILLIAMS <br />MPI PREMIUM GRADE <br />COLOR: SW7549 STUDIO TAUPE <br />REFER TO EXTERIOR ELEVATIONS <br />PT-3 <br />CLEAR SEALER <br />SIKKENS <br />CETOL SRD RE, NATURAL <br />COLOR: CLEAR, FINISH: SATIN <br />TRASH ENCLOSURE <br />PT-4 <br />PAINT <br />MPI PREMIUM GRADE <br />COLOR: DARK BRONZE <br />SERVICE DOOR [31 <br />DIVISION 26 - ELECTRICAL <br />- EXTERIOR LIGHT FIXTURES - - COLOR: DARK BRONZE <br />COLCRS AND MATERIALS SCHEDULE <br />[11 ARCHITECTURAL WALL PANEL(AWP): PROVIDE AND INSTALL NICHIHA MANUFACTURED METAL TRIM. INSTALL CORNER KEY TRIM AT ALL OUTSIDE WALL CORNERS. PROVIDE ALL ARCHITECTURAL WALL PANEL COMPONENTS, METAL TRIM, <br />HARDWARE AND ACCESSORIES FOR COMPLETE INSTALLATION. INSTALL METAL TRIM AND METAL FLASHING AT DOOR AND STOREFRONT SYSTEM OPENINGS. INSTALL H-MOLD TRIM AT VERTICAL EXPANSION JOINTS; REFER TO <br />EXTERIOR ELEVATIONS FOR VERTICAL EXPANSION JOINT LAYOUT. INSTALL METAL STARTER FLASHING PRIOR TO INSTALLING STARTER TRACK AT BOTTOM PANEL. PROVIDE SHOP FINISH (POWDER COATED HIGH-PERFORMANCE FINISH) <br />FOR ALL EXPOSED METAL TRIM COMPONENTS. METAL TRIM AND METAL FLASHING COLOR TO MATCH ARCHITECTURAL WALL PANELS. <br />[21 INSULATED GLAZING UNIT: PPG INDUSTRIES. SOLARBAN GO (2) CLEAR + CLEAR. LOW-E GLASS. ARGON GLASS. THICKNESS: 1/4" GLASS. I -INCH INSULATED GLAZING UNIT. NFRC U-VALUE (WINTER ARGON) = 0.24. NFRC SHGC = 0.39 <br />[31 HOLLOW METAL DOORS AND FRAMES; <br />EXTERIOR HOLLOW METAL DOORS: COLOR: PT-4 <br />EXTERIOR HOLLOW METAL FRAMES: COLOR: PT-4 <br />FOOTNOTES: <br />EXTERIOR ENVELOPE: <br />PER 2015 WSEC REQUIREMENTS <br />[I] <br />PER WSEC PARA. A103.2.2 INTERMEDIATE. STUDS FRAMED ON 16 INCH CENTERS WITH DOUBLE TOP PLATE AND SINGLE BOTTOM PLATE. CORNERS USE TWO STUDS OR OTHER MEANS OF FULLY <br />WALL ASSEMBLY: <br />R-21 THERMAL BATT INSULATION [I1 <br />INSULATING CORNERS, AND EACH OPENING IS FRAMED BY TWO STUDS. HEADERS CONSIST OF DOUBLE 2X MATERIAL WITH R-10 INSULATION. INTERIOR PARTITION WALL/EXTERIOR WALL <br />INTERSECTIONS ARE FULLY INSULATED IN THE EXTERIOR WALL <br />ROOF ASSEMBLY: <br />R-38 RIGID INSULATION (C.I.) [21 <br />ARCHITECTURAL WALL PANEL (NICHIHA PANEL) ON WOOD STUDS: R-21 THERMAL BATT INSULATION (CAVITY). <br />SLAB ON GRADE: <br />R-10 RIGID INSULATION (C.I.) [31 <br />[21 <br />SINGLE -PLY MEMBRANE ROOFING: R-40 RIGID INSULATION. <br />VERTICAL FENESTRATION: <br />2) LAYERS OF 4" THICK EXTRUDED POLYSTYRENE (XPS) RIGID INSULATION BOARD. (C.I.) <br />METAL FRAMING: <br />U=0.38 ASSEMBLY MAXIMUM. [4][51 <br />[31 <br />BUILDING PERIMETER. WIDTH = 2'-0" WITH THERMAL BREAK. EXTEND INSULATION VERTICALLY FROM TOP <br />FIXED <br />SHGC=0.40 ASSEMBLY MAXIMUM. [4][51 <br />OF SLAB TO TOP OF FOOTING (MIN. 7-09 <br />OPAQUE DOORS (SWINGIING): <br />U=0.37 ASSEMBLY MAXIMUM. <br />RIGID INSULATION: (1) LAYER OF 2" THICK EXTRUDED POLYSTYRENE (XPS) INSULATION BOARD. <br />AIR BARRIER: <br />PROVIDE CONTINUOUS AIR BARRIER THROUGHOUT THE BUILDING THERMAL. <br />[41 <br />INSULATING GLASS UNIT: DOUBLE PANE SEALED UNIT. VERTICAL FENESTRATION (WINDOWS, STOREFRONTS AND STOREFRONT ENTRANCES): THE ASSEMBLY (INCLUDING THE FRAMES) SHALL HAVE NATIONAL <br />ENVELOPE. - SEE AIR BARRIER REQUIREMENTS BELOW. <br />FENESTRATION RATING COUNCIL (NFRC) CERTIFICATION IN ACCORDANCE WITH 2OI5 WASHINGTON STATE ENERGY CODE REQUIREMENTS. ASSEMBLY SHALL NAVE MAXIMUM U-VALUE AS SPECIFIED. <br />151 <br />VERTICAL FENESTRATION (METAL FIXED): INCLUDES METAL FRAMING WITH OR WITHOUT THERMAL BREAK. <br />FIXED INCLUDES PICTURE WINDOWS STOREFRONTS AND CURTAIN WALL ASSEMBLIES. FIXED UNITS SHALL <br />HAVE MAXIMUM U-VALUE AND SOLAR HEAT GAIN COEFFICIENT (SHGC) AS SPECIFIED. <br />GENERAL NOTES <br />I. ALL INSULATION MATERIALS SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTRUCTIONS TO ACHIEVE PROPER DENSITIES, MAINTAIN CLEARANCES AND MAINTAIN UNIFORM R-VALUES. INSULATE MISCELLANEOUS GAPS AND VOIDS. <br />2. VAPOR BARRIER SHALL BE INSTALLED ON THE WARM SIDE OF INSULATION. TAPE SEAL BUTT ENDS, LAPPED FLANGES, PENETRATIONS, TEARS OR CUTS IN MEMBRANE. EXTEND VAPOR BARRIER TIGHT TO FULL PERIMETER OF WINDOW FRAMES, DOORFRAMES, LOUVERS, METAL DECK AND OTHER ITEMS INTERRUPTING THE PLANE <br />OF MEMBRANE. TAPE SEAL ENDS OF VAPOR BARRIER TO FRAMES, METAL DECK AND OTHER ITEMS. <br />3. ALL INSULATION R-VALUES INDICATED FOR ASSEMBLY TYPES ARE MINIMUMS. <br />4. EXTRUDED POLYSTYRENE (XPS) RIGID INSULATION R-VALUE: R-5.0 PER I" THICKNESS (MAXIMUM CALCULATION). <br />5. POLYISOCYANURATE (ISO) RIGID INSULATION R-VALUE: R-5.7 (LTTR) PER I" THICKNESS (MAXIMUM CALCULATION). <br />6. EXPANDED POLYSTYRENE (EPS) RIGID INSULATION R-VALUE: R-3.6 PER I" THICKNESS (MAXIMUM CALCULATION). <br />7. BUILDING ENVELOPE SHALL COMPLY WITH 2O15 WASHINGTON STATE ENERGY CODE (WSEC) REQUIREMENTS. CODE COMPLIANCE BASED ON PRESCRIPTIVE BUILDING ENVELOPE METHOD AS DEFINED IN SECTION C402 CLIMATE ZONE 4C (MARINE) AS DEFINED IN TABLE C301.1. COMPLY WITH BUILDING ENVELOPE REQUIREMENTS <br />DEFINED IN CHAPTER 4. <br />8. BUILDING THERMAL ENVELOPE INSPECTION: COMPLY WITH WSEC SECTION 104 REQUIREMENTS. WORK SHALL NOT BE DONE BEYOND THE POINT INDICATED IN EACH SUCCESSIVE INSPECTION WITHOUT FIRST OBTAINING THE APPROVAL OF THE CODE OFFICIAL AND THE ARCHITECT. ANY PORTIONS OF WORK THAT DO NOT COMPLY <br />SHALL BE CORRECTED AND SUCH PORTION SHALL NOT BE COVERED OR CONCEALED UNTIL AUTHORIZED BY THE CODE OFFICIAL AND APPROVED BY THE ARCHITECT. INSPECTIONS SHALL INCLUDE THE FOLLOWING: (1) WALL INSULATION; TO BE MADE AFTER ALL WALL INSULATION AND VAPOR BARRIER ARE IN PLACE, BUT <br />BEFORE ANY WALL COVERING IS PLACED. (2) GLAZING INSPECTION; TO BE MADE AFTER GLAZING MATERIALS ARE INSTALLED IN THE BUILDING. (3) EXTERIOR ROOFING INSULATION; TO BE MADE AFTER INSTALLATION OF THE ROOFING INSULATION, BUT BEFORE CONCEALMENT. (4) SLAB AND FLOOR INSULATION; TO BE MADE <br />AFTER THE INSTALLATION OF THE SLAB AND FLOOR INSULATION, BUT BEFORE CONCEALMENT. <br />9. BUILDING THERMAL ENVELOPE INSULATION: AN R-VALUE IDENTIFICATION MARK SHALL BE APPLIED BY THE MANUFACTURER TO EACH PIECE OF BUILDING THERMAL ENVELOPE INSULATION 12 INCHES OR GREATER IN WIDTH. COMPLY WITH WSEC SECTION C303.1.1 REQUIREMENTS. <br />10. FENESTRATION PRODUCT RATING: U-FACTORS OF FENESTRATION PRODUCTS SHALL BE DETERMINED IN ACCORDANCE WITH NFRC 100. THE SOLAR HEAT GAIN COEFFICIENT (SHGC) AND VISIBLE TRANSMITTANCE (VT) OF GLAZED FENESTRATION PRODUCTS SHALL BE DETERMINED IN ACCORDANCE WITH NFRC 200. COMPLY WITH <br />WSEC SECTION C303.1.3 REQUIREMENTS. <br />11. AIR BARRIER (BUILDING TEST): THE COMPLETED BUILDING SHALL BE TESTED AND THE AIR LEAKAGE RATE OF THE BUILDING ENVELOPE SHALL NOT EXCEED THE MAXIMUM AIR LEAKAGE RATE DEFINED IN WSEC SECTION C402.5.1.2.COMPLY WITH WSEC SECTION C402.5.1.2 BUILDING TESTING REQUIREMENTS. <br />12. INSULATION IDENTIFICATION MARK SHALL BE APPLIED TO ALL INSULATION MATERIALS AND INSULATION INSTALLED SUCH THAT THE MARK IS READILY OBSERVABLE DURING INSPECTION <br />0 <br />6 <br />L'o <br />ri <br />r <br />�1 �I ;� is � s; �• ;� <br />43 %REGISTERED <br />CRUCE McKEA4N <br />TATE OF WASHING - <br />HELIX DESIGN GROUP, INC <br />75TH STREET SW <br />EVERETT, WA <br />REVISION DATE <br />9 <br />DATE JOB NO. <br />06.03.20 a 1 9-026 <br />PERMIT SET <br />