Laserfiche WebLink
MECHANICAL SPECIFICATIONS <br />1 GENERAL <br />1-1 GENERALREOUiREI',11ENTS: <br />1.11 REQUIREMENI"S UNDER DIVISION ONE AND I HE GENERAL AND SUPPLEMENTARY CONDITIONS <br />OF SPEC{F|CATIONS SHALL BEAPARTDFTHIS SECTION. EACH CONTRACTOR SHALLBECOME <br />THOROUGI-ILY ACQUAINTED WITFi ITS CONTENTS AS TO REQUIREMENTS THAT AFFECT THIS DIVISION OR <br />SECTION. THEV�ORK REQUIRED UNDER THIS SECTION INCLUDES MATERIAL. EQUIPMENT, APPLIANCES, <br />TRANSPORTATI(),N!, SERVICES, AND LABOR RE"QUIREDTO fG(_)MPLETE 111E ENTIRE SYSTEM AS REQUIRED BY <br />THEDRAWINGS AND SPECIFICATIONS. HEREAFTER|NTHIS SPECIFICATION, THE WORD "MECHAN!CAL <br />CO�TRACTOR"SHALL REFER TOTHE INSTALLING MECHANICAL CONTRACTOR AND''OVV0ER"SHALL REFER <br />TO) 7-ELEVEN.REFERTQ8HEET'D{}W:FOR RESPONSIBLE PROVIDERS <br />THE CPEC|FICAT{ONSANDDRAWINGS FOR THE PROJECT ARE COKAPLEK8E0TARY.AND <br />PORTIONS OF THE WORK DESCRIBED IN ONE. SHALL BE PROVIDED AS IF DESCRIBED IN BOTH. IN THE <br />EVENT OF DISCREPANCIES, NOTIFY THE ENGINEER AND/OR OWNER AND REQUEST CLARIFICATION PRIOR <br />TOPROCEEDING WITH THEWORK INVOLVED. <br />1.2 >NSPECT0N[JFSiTE� <br />12.1 PRIOR TO SUBMITTING BID, VISIT THE _SITE OF THE PROPOSED WORK AND BECOME FULLY <br />}NFORK0EDA8TOTHECONDITIONS UNDER WHICH THE WORK {GTOBEDDNE. FAILURE TODO8OWiLLNOT <br />BE CONSIDERED SUFFIC 'IENT Ji-ISTIFICATION TO REQUEST OR OBTAIN EXTRA COMPENSATION OVER AND <br />ABOVE THECONTRACT PRICE. <br />13 VIATERIALAND WORK MANSH|P' <br />13�1 PROVIDE NEW MATERIAL, EQUIPMENT, AND APPARATUS UNDER THIS CONTRACT UNLESS <br />OTPIERWISES'TAT ED HEREIN, OF BEST QUALITY NORMALLY USED) FOR THE PURPOSE IN GOOD <br />CONIMERC(ALPRACTICE- AND FREE FROM ANY DEFECTS. MODEL NUMBERS LISTED iNTHE SPECIFICATIONS <br />OR SHOWN ONTHEE DPAWINIG)S ARE NOT NECESSARILY INTENDED TO DESIGNATE THE REQUIRED TRIM, <br />WRITTEN DESCRIPTIONS DFTHE TRIM'GOVERN MODEL. NUMBERS. <br />132 WORK PERFORMED UNDER THIS CONTRACT SHALL PROVIDE A NEAT AN D"WORKMAN LIKE" <br />APPEARANCE WHEN "I'O"THE SAT1SF,_'\C.TION 0" THE ARr,HITECI AND ENGINEER. <br />VVORKKXAM8H(PSHALL 8ETHEFINEST POSSIBLE BYEXPERIENCED MECHANICS. I0ST4LLATONSSHALL <br />C'O�8PLYVNTHAPPLICABLE CODES AND LAWS. <br />13.3 THIE COMPLETE LKISTALI-A TION SHALL FUNCTION AS DESIGNED AND INTENDED WITH RESPECT <br />TOEFFICIENCY. CAPACITY. NOISE LEVEL. ETC, ABNORMAL NOISE CAUSED BYRATTLING EQUIPMENT. <br />P|P|NG.DUCTS.A!ROEV|CES.AND8QUEAKQ!NROTAT|NGCOK8P0NENTSWILLNOT8EACCEPTABLE_ IN <br />GENERAL, MATERIALS AND EQUIPMENTSI-IALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. <br />L|BHTDUTY AWDRESIDENTIALTYPE EQUIPMENT WILL NOT BEACCEPTED. <br />13.4 REMOVE FROMTHE PREMISES WASTE MATERIAL PRESENT AS A RESULT OF WORK, INCLUDING <br />C,-"-.RTONS.CRAT|NS.PAPER, STICKERS, AND/OR EXCAVATION MATERIAL NOT USED /NBACKF|LL!N8.ETC- <br />CLEAN EOU|PKXENT|NSTALLEDUNDER THIS CQNTRACTTDPRESENTANEATANDCLEAN|N8TALLAT|DMAT <br />THETERK0iNAT{ONOFTHE WORK. <br />1_'5 REPAIR ORREPLACE PUBLIC AND PRIVATE PROPERTY DAMAGED, A8ARESULT OFWORK <br />PERFORK8EDUNDERTH{8C(}NTRACTTOTHESAT|GFACTiONOFAUTHOR0E3ANDREGULAT0NGHAV|NG <br />JUR!SDICT|ON. <br />1.4 COORD!NATON� <br />1.4.1 COORDIWATEVVORK WITHTHAT0FOTHER TRADE8SOTHATTHE VARIOUS COMPONENTS OF <br />THE GY8TE�X�THATARE8BN8INSTALLED AND/OR EXISTING SYSTEMS WILL BEINSTALLED ATTHE PROPER <br />WII.J.. FIT THE AVAILABLE SPA'CE, ANID'vAJILL.. ALLOVV PROPER SERVICE ACCESS [-0 THOSE ITEMS <br />REQUIRING MAINTENANCE. COMPONENTS WHICH ARE |NGTALLEDWITHOUT REGARD TOTHE ABOVE SHALL <br />BERELOCATED ATNOADDITIONAL COST TOTHE OWNER. <br />14�2 UNLE8SOTHER�NSE�NOiOATED.THEGE�ER�LCDNTR�CTOR 'AtILLPROVIDE CHASES AND <br />OPENINGS |NBU|LD!NGCONSTRUCTION REQUIRED FOR INSTALLATION OFTHE SYSTEMS SPECIFIED HEREIN. <br />MECHANICAL CONTRACTOR SHALL FURNISH THE GENERAL. CONTRACTOR WITH INFORMATION WHERE <br />CHASES AND OPENINGS ARE REQUIRED, KEEP INFORMED A3TDTHEVVORKOFOTHERTRADES ENGAGED <br />IN THE CONSTRUCTION OF THE PROJECT. AND EXECUTE WORK INI A MANNER AS TO NOT INTERFERE00TH <br />ORDELAYTHEVVORKOFOTHERTRADES. <br />1Al,3 FIGURED DIMENSIONS SHALL GETAKEN !NPREFERENCE TOSCALE DIMENSIONS. MECHANICAL <br />C_101kT RA'-''T'(-.)R SHALLTAKE HIS 0'%AIN MEASUREMENTS ATTHE BUILDING, AS VARIATIONS MAY OCCUR. <br />K8ECH4N|��LCONTRA�TORYNLLBEHELDRE8pDNS!8LEFORERROR8THATCOULD HAVE BEEN Nv03!DED <br />BYPROPER CHECKING AND INSPECTION. <br />1.4A PROVIDE THATWILL PROPERLY F|TTHETYPESQFCBL{N8.VVALLQR <br />FLOOR FINISHES ACTUALLYINSTALLED. MODEL NUMBERS LISTED iNTHE SPECIFICATIONS ORSHOWN QN <br />THE DRAVXWGGARENUTINTENDED TDDESIGNATE THE REQUIRED TRIM. <br />1. 11.5 I'VIECI LANICAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR DUCTWORK LAYOUT TO THE <br />CONSTRUCTION PROJECT MANAGER FOR OWNER APPROVAL PRIOR TOINSTALLATION. <br />1.5 ORDINANCES ANDCODE& <br />1�5�1 VVORKPERFDRK8EDUNDERTH!8CONTRACT8HALL.ATAK8!NIKXUM.BE!NCOMFOR[0ANCEy@TH <br />APPL|�A8LENAT!ONAL.8TATEAND LOCAL CODES HAVING JUR0D|CT0N. EQUIPMENT FURNISHED AND <br />ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN! STRICT COMPLIANCE <br />WITH CURRENT APPLICABLE CODES ADOPTED BY J-HE7 LOCAL AHJ INCLUDING ANY AMENDMENTS AND <br />8TANDARDSA83ETFORTHBYTHEN&T0NALF|REPROTECT0NA88OC|AJ!ON(NFPA).UNDERVVR}TERS <br />LA8OR�T0R!E�(UL).OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (O8HA).AMERiCANSOCIETY OF <br />MECHANICAL ENGIINIEERSASME), AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR <br />CONDIT!ON!0QENGINEERS (ASHRAE).AMER|CANNATIONAL- STAMDARD8INSTITUTE (AN3}).AK8ER/CAW <br />'SOCIETY OF TESTING MATERIALS `ASTM` AND OTFIER NATIONAL STANDARDS AND CODES WHERE <br />APPLICABLE- WHERE THE CONTRACTDOCUMENTS EXCEED THE REQUIREMENTS OF THEIR REFERENCED <br />CODES.STANDARDS, ETC..TH[CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE. <br />1.5.2 PROCURE AND PAY FOR PERMITS AND LICENSES REQUIRED FOR THE ACC'OMPUSHMENT OF <br />THE WORK HEREIN DESCRIBED. VVHEREREUU|REO.OBTA|0.PAY FOR AND FURNISH CERTIFICATES OF <br />iNDPECT{ONTOOWNER. KXECHAN|CALCONTRACTOR WILL 8EHELD RESPONSIBLE FOR VIOLATIONS OFTHE <br />LAVV <br />1� FROTECT���OFEOU|PK�ENTANDK�ATER�ALS� <br />1,6-1 STORE AND PROTECT FROKvlDAK8AQEEQUIPMENT AND MATERIALS DELIVERED TOJOB SITE. <br />COVERVNTHYVATERPRODF.TEAR'RES|8TANT.HEAVYTARPORPULYETHYLENEPLAST1CASREOQ!REOTO <br />PRDTECTFROK3PLASTER, DIRT, PAINT .VVATER.ORPHYSICAL DAMAGE. EQUIPMENT AND kXAJER|ALTHAT <br />HAS BEEN [3)AMAGED BY CONSTRUCTION ACITIVITIES WILL BE REJECTED, AND MECHANICAL CONTRACTOR <br />IS, ()BLIGA"FEDTO; FURNISH NEW EQUIPfAENTAND MATERIAL OF A LIKE KIND AS APPROVED BY OWNER. <br />1_8, 2 KEEP PREMISES ROOM CLEAN FROU11FOREIGN MATERIAL CREATED DURING WORK <br />PE-HFORK,'IEDUNDERTHISCONTRA(,T- PIPING, EQUIPMENT, ETC..SHALL HAVE ANEATANDCLEAN <br />APPEARANCEATTHETERMINATION OFTHEWORK. <br />�8�3 PLUG OR CAP OPEN ENDS OFDUCTVVORKAND PIPING SYSTEMS WHILE STORED ORINSTALLED <br />DURIN(."l CONSTRLICTI(D'N WHEN W)TINLISE TO PREVENT'THE ENTRANCE OF DEBRIS INTO THE SYSTEMS. <br />1.84 KEEPTHEMANUFACTURERPRDV!DEDPROTECT|VECOVER(NGSONFLDORDRAiNS.FLODR <br />SINKS, AND TRENCH DRAINS DUR!NGCONSTRUCTION. REMOVE COVERINGS ATTHE "TERMINATION QFTHE <br />WORK AND P0L|SHEXPOSED SURFACES_ <br />17 OPERATION AND MA|NTENANCEINSTRUCTIONS: <br />1- r1 COLLECT ANDCOMPILE A COMPLETE BROCHURE OF FIXTURES, MATERIALS, AND EQUIPMENT <br />FURN!8HEDAWO|NSTALLED ONTHIS PROJECT. INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS, <br />MAN U FACTU RER'S CATALOG SFIEETS. WIRING DIAGRAMS, PARTS L.ISTS, APPROVED SHOP DRAWINGS, AND <br />DE8C,R!PT!VEL!TERATUREFURNISHED BYTHEMANUFACTURER INCLUDE AWINSIDE COVER SHEET THAT <br />L!STSTHFPROJECTWAME.DATE.OVVNER.ARCH!TECT.E0G|NEER.6ENERALCO0TRACTOR. <br />SU8CO�TRACTDR.AND ANINDEX OFCONTENTI�._l <br />172 SUBMIT COPIES OF LITERATURE BOLIND IN APPROVED BINDERS TO THE ARCHITECT AND <br />OWNER ATTHE TERM!MAT0NOFTHEWORK. PAPER CLIPS, STAPLES, RUBBER BANDS, AND MAILING <br />ENVELOPES ARE NOT CONSIDERED APPROVED BINDERS. FINAL APPROVAL OFMECHANICAL AND <br />PLUMBING SYSTEMS WILL BE WIT I IHELD UNTIL T HIS EQLAPMENT BROCHURE IS DEEMED COMPLETE BY THE <br />ARCHITECT, ENGINEER, AND OWNER. <br />,Z� <br />c'I <br />0� <br />1�0 WARRANTIES: 2.4DIFFUSERS AND GRILLES (REFER TOSHEET 'DOVVFORRESPONSIBLE PROVIDER. IFNOT SPECIFIED, co rn <br />OWNER PROVIDED': <br />1L8.1 WARRANT EACH SYSTEM AND EACH ELEMENT THEREOF AGAINST ALLDEFECTS DUE, TO 341 ALL SUPPLY AND RETURN AIR DEVICES SHALL INSTALLED BYTHE MECHANICAL CONTRACTOR. <br />FAULTY WORKMANSHIP, DESIGN OR MATERIAL FOR A PERIOD OF 12 MONTHS 'FROM DATE OF <br />SUBSTANT!A: COMPLETION, UNLESS SPECIFIC ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN 242 ALL AIR TERMINAL DEVICES SHALL BE INSTALLED AS SHOWN ON THE PLANS IN ORDER TO <br />THE CONSTRUCTION DOCUMENTS OR MANUFACTURER'S STAN DAR D WAR RA NTY EXCEEDS 12 <br />HANDLETHEDESlS0EDA|RFLOVY��PAOTiESVNTHAKA�N|k8UK8AK80UMT0FNOiSE�NDSTAT!C <br />K�DNTHS, REK4EDYALL DEFECTS, OCCURRING VNTH|NTHE VVARRANTYpER0D(S).ASSTATED }NTHE PRESSURE. <br />SENERALCOND{T/ONGANDD|V!S0N1 ° <br />25CONDENSATE DRAINS: <br />1�82 WARRANTIES SHALL INCLUDE LABOR AND MATERIAL. MAKE REPAIRS ORREPLACEMENTS <br />VNTHOUTANYADD|T|ONALCOSTSTOTHEOVVNER� 2.5.1 THEK�ECHANiCALCONTRACTOR SHALL PROVIDE AND INSTALL A8Ak0}N|K�DK�A4"DEEP P-TRAP <br />' ON CONDENSATE DRAIN OUTLETS WHERE THE CONDENSATE'WATER WILL EXIT THE P.-TRAP AT A POINT 1" <br />1,&3 PERFORMTHEREME0ALVVDRKPR[)K8PTLY.UPONVVR}TTENNOT!CEFROK3THEEN8|NEER LOVVERTHANTHE DRAIN CONNECTION ATTHE UNIT, THE MECHANICAL CONTRACTOR SHALL PROVIDE <br />OR OWNER. AND INSTALL CONDENSATE I-INES AS REQUIRED TO MEET LOCAL CODES AND AS SHOWN ON THE <br />MECHANICAL PLANS. THESE LINES SHALL BESLOPED AWAY FROM THE UNITS, SUPPORTED A3REQUIRED <br />CIS <br />1,8A AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER TO THE OWNER ALL WARRANTIES, IN 1-0 ASSURE PROPER FLOW, AND ATTHE MECHANICAL CONTRACTOR'S OPTION. CONDENSATE DRAIN LINES <br />WRITING AND PROPERLY EXECUTED, INCLUDING TERM LIMITS FOR WARRANTIES EXTENDING BEYOND MAY 8ESCHEQULE4DPVC ORCOPPER. ALLJ0NT3SHALLBESECURELY GLUED ORSOLDERED AG <br />` THE ONE YEAR PERIOD, EACH WARRANTY INSTRUMENT BEING ADDRESSED TO THE OWNER AND REQUIRED. INSULATE WITH 3A''THICK PIPE INSULATION WHERE REQUIRED. <br />STATING THE COMMENCEMENT DATE AND TERM. <br />2.000NTROLS: <br />19 CUTTING - - 28.1 REFER TO SHEET'DOW` FOR RESPONSIBLE PROVIDER. IF NOT SPECIFIED, RTU CONTROLS PROVIDED BY <br />1.9.1 PERFORM CUTTING OF WALLS, FLOORS, CEILINGS, ETC. AS REQUIRED TO INSTALL WORK OWNER. COORDINATE LOCATIONS FDRTHERMOGTATAND SENSORS FOR ROUGH-|N.' <br />UNDER THIS SECTION. OBTAIN PERMISSION FROM THE ARCHITECT PRIOR TOCUTTING. DONOT CUT <br />OR DISTURB STRUCTURAL MEMBERS WITHOUT PRIOR APPROVAL FROM THE ARCHITECT. CUT HOLES 2.82 SMOKE DETECTORS AND SAMPLING TUBES PROVIDED AND INSTALLED TO THE UNITS AND IN <br />A3SMALL ASPOSSIBLE. GENERAL CONTRACTOR SHALL PATCHVVALLG.FLOORS. ETC. AS REQUIRED 'THE DUCTVVQRKBYCARRIER, THE SMOKE DETECTORS SHALL DISABLE HW\CUNIT OPERATION UPON <br />8YWORK UNDER THIS SECTION. PATCHING SHALL MATCH THE ORIGINAL MATERIAL. AND ACTIVATION. <br />CONSTRUCTION. REPAIR AND REFINISH AREAS DISTURBED BYWORK TDTHE CONDiT|[)NOF <br />ADJOINING SURFACES IMAMANNER SATISFACTORY TQTHE ARCHITECT. 27ELECTR!CAL: <br />1.10 ROUGH -IN: 2.7.1 LOVVVQLTAGEVNR1NB ALL PROVISIONS FOR LOWVOLTAGEWIRING SHALL BEPERFORMED <br />BYTHE MECHANICAL CONTRACTOR UNLESS CODES C)RLABOR SITUATIONS DONOT PERM!T. IF THE <br />1.10.1 COORDINATE WITHOUT DELAY ROUGH !NS-|WWITH GENERALCONSTRUCTION. CONCEAL MECHANICAL CONTRACTOR CAN NO-1 PERFORM LOWVOLTAGE WIRING. THE MECHANICAL CONTRACTOR ^ <br />CD z <br />PIPING AND CONDUIT ROUGFI-IN EXCEPT IN UNFINISHED AREAS ANDWHERE OTHERWISE SHOWN. SHALL{NFORK4THEGE0ERALCONTRACTOR,8SPART0FTHEHVAC8|DDOCDMENT.TOHAVETHE <br />ELECTRICAL SUBCONTRACTOR INCLUDE THIS WORK fNTHEIR BID. CID <br />1.11 STRUCTURALSTEEL: <br />2I2 POWER WIRING ALLELECTRICAL POVVERVNR|NGTOINCLUDE FINAL CONNECT|L)NSSHALL BE <br />1�111 STRUCTURAL STEEL USED FOR PIPE SUPPORTS, EOU|Pk�ENTSUPPO�TS.ETC.SHALLBE PROV1DED8YTHEGENERALCO0TRACTOR'8ELECTBlCALGUBCDNTRACTOR. <br />NEW, CLEAN, AND CONFORM TOASTMDESIGNATION A-30. . <br />2.8 GAS PIPING: ' <br />111.2 SUPPORT PLUMBING AND MECHANICAL EQUIPMENT AND PIPING FROM THE BUILDING <br />STRUCTURE. DONOT SUPPORT PLUMBING EQUIPMENT FROM CEILINGS, OTHER MECHANICAL OR 2.8.1 SCHEDULE 40BLACK CARBON STEEL WITH MALLEABLE |RONTHREADED FITTINGS. PROVIDE <br />ELECTRICAL COMPONENTS. AND OTHER NON-STRUCTURALELEMENTS. SHUT-OFF VALVE, DIRTLES.AND UNION ATEACH ROOFTOP UNIT. PAINT ALL GAS PIPING EXPOSED TO <br />WEATHER WITH ONE COAT OFPRIMER, AND TWO COATS QFRUST-PROOF PAINT. COLOR SHALL <br />1,12 ACCESS DOORS: BUILDING COLORS. COORDINATE WITH OWNER'S CONSTRUCTION MANAGER. <br />Uj <br />112.1 PROVIDE ACCESS DOORS IN CEILINGS ANDWALLS WI--IERE INDICATED OR REQU! RED FOR 2.8.2 TREATED WOOD BLOCKING 8X8X12.8'-0`OCMAX WITH GALVANIZED PIPE STRAP, i1N"ZINC <br />ACCESS TOCONCEALED VALVES AND EQUIPMENT INSTALLED UNDER THIS SECTION. PROVIDE COATED LAG SCREWS, AND RUBBER VVAUKPADADHERED TQROOF. <br />CONCEALED HINGES, SCREWDRIVER -TYPE LOCK.ANGHORSTRAPS: KAA0UFACTUREDDYKX1LCQR. <br />ZURN.T|TUS.[}REQUAL. OBTAIN 4RCH}TEICT'SAPPROVAL OFTYPE, SIZE, LOCATION, AND COLOR 2.5REFRiGERAT|DNLINES: � <br />BEFORE ORDERING. ' ' <br />2�9A REFRIGERATION LINE SETS FOR HVAC UNITS ARE TO BE PROVIDED AND INSTALLED BY THE <br />113 PENETRATIONS: KXECHAN|C4LC{)NTRACTOR. . <br />113.1 SEAL FLOOR, EXTERIOR,.IVALL AND ROOF PENETRATIONS,P4ATER AND WEATHER TIGHT 2.10 MECHANICAL CONTRACTOR RESPONSIBILITIES (REFER TOSHEET`DDW): <br />WITH APPROPRIATE NON -SHRINK, NON -HARDENING COMMERCIAL. CONSTRUCTION SEALANT. SEW - <br />ROOF <br />PENETRAT08 NSVNTH4POUNQPE��DUAREFODTLEAQFL�H|NG. PRDV|DEASLEEVE, AMD 2.10.1 AFTER COMPLETION OFTHE WORK DESCRIBED IN THIS SPECIFICATION AND SHOWN ON THE <br />SEAL NON-F!RE-RATED FLOOR AND 'WALL PENETRATIONS WITH FIBERGLASS PACKING AND SILICONE DRAWINGS, THE MECHANICAL CONTRACTOR E.',HALL THOROUGHLY CLEAN ALL EXPOSED EQUIPMENT, <br />CAULK (FOR ACOUSTICAL 1NGULAT!ON). REMOVING ALL LABELS AND STICKERS NOT CONTAINING OPERATION INSTRUCTION. MECHANICAL <br />CONTRACTOR SHALL REMOVE CRATING DEBRIS, LEAVING THE INSTALLATION FINISIdED AND READY FOR <br />1132 COORDINATE FIRE RATING REQUIREMENTS AND LOCAT0NBV0THTHE ARCHITECT. SEAL OPERATION, TQINCLUDING CLEAN FILTERS {0AIR HANDLING UNITS. <br />PENETRATIONS OF FIRE -RATED ASSEMBLIES WITH 3M # CP-25 FIRE BARRIER CAULK (PROVIDE , <br />THICKNESS AND METHOD AS REQUIRED AND RECOMMENDED BY MANUFACTURER) TO MAINTAIN THE <br />FIRE RESISTANCE RATING OFF!RE-RATEDASSEMBLIES. <br />1]33 SEAL EXTERIOR WALL PENETRATIONS BELOW GRADE WITH CAST IRON WALL PIPES AND <br />MODULAR MECHANICAL. SLEEVE SEALS, MANUFACTURED BY THUNDERLINE/LINK SEAL, CALPICO, INC <br />ANDK8ETRAFLEX. <br />113.4 PROVIDE SLEEVES FOR HORIZONTAL PIPE PASSING THROUGH C}RUNDER FOUNDATION. Lm <br />SLEEVES SHALL BECAST IRON SOIL PIPE TWO NOMINAL PIPE SIZES LARGER THAN THE PIPE GERVED- <br />- <br />113.5 PROVIDE SLEEVES FOR VERTICAL PIPE PASSING THR3UGHSLAB ONGRADE. SLEEVES <br />SHALL BE SCHEDULE 40 PVC PIPE, TWO NOMINAL PIPE SIZES LARGER THAN THE PIPE SERVED. SEAL <br />WATER -TIGHT WITH SILICONE CAULK. <br />~ <br />2. HEATING, VENTILATION, AND AIR CONDITIONING <br />2] DUCTVVQRK: <br />211 MECHANICAL CONTRACTOR SHALL PROVIDE ANY DUCTWORK NECESSARY FOR A <br />COMPLETE INSTALLATION OFHVACSYSTEMS (INCLUDING EXHAUST SYSTEK8S). ALLDUCTXVORK <br />IDENTIFICATION AND INSTALLATION TO ADHERE TO SMACNA STANDARDS AND ALL GOVERNING <br />CODE& <br />_ 2.12 ROUND PIPE DUCT RUNS SHALL. 8ECONSTRUCTED OFMETA LPIPE WITH EXTERNAL <br />SLEEVE INSULATION. <br />010 <br />21,3 DUCTWORK CONNECTIONS TO AIR DEVICES MUST BE110IADEWITHH-ARDPIPEE LBOWS, NN <br />COVERED WITH SLEEVE INSULATION- FLEX DUCT MUST NOT BEUTILIZED FOR AQODEGREE <br />CONNECTION TOANAIR DEVICE. ` <br />2.1A BALANCING DAMPERS WITH DOUBLE LOCKING QUADS SHALL BEPROVIDED !NALL ROUND <br />PIPE TAKE -OFFS FROM THE MAIN TRUNKS, UNLESS OTHERWISE NOTED ONPLANS. Solutions Group <br />2].5 AMAXIMUM 0F6OFFLEX DUCT MAY BEUSED FOR FINAL CONNECTONOFSIDE WALL <br />DIFFUSERS. <br />2].8 FLEX DUCT MUST 8EPROPERLY SUPPORTEDWITHONE INCH STRAPS AND CUT TO ^ <br />PROPER LENGTH TOPREVENT SAGGING. <br />CD co 0 <br />2.1.7 FLEX DUCT SHALL 8E(}VVENS'CORNINGFOIL-BACK HIGH DUALITYU/LAPPROVED- PLASTIC ' <br />WRAPPED FLEX DUCT |SNOT ACCEPTABLE. <br />00 <br />2.18 RIGID ROUND DUCT SHALL BEUSED FOR HOT FOODS EXHAUST. <br />3.2|NOOLATQN: <br />' <br />2.31 SUPPLY AND RETURN DUCTWORK INSIDE THE BUILDING SHALL BE INSULATED WITH 1.61 ' <br />THICK ACOUSTICAL LINING WITH A MINIMUM R-VALUE OF 6,0 OR EXTERNALLY WRAPPED "AJITH5 2" THICK <br />GLASS FIBER DUCT WRAP. <br />22.2 SUPPLY AND RETURN DUCTWORK OUTSIDE THE BUILDING SHALL BEINSULATED WITH 2. <br />LINER WITH AMINIMUM R4/ALUEOF8.0AND SEAL SEAMS WEATHER TIGHT. <br />2.23 DEDICATED OUTSIDE AIR SUPPLY AND RELIEF DUCTWORK INSIDE THE BUILDING SHALL BE <br />INSULATED WITH 2"THICK DUCT WRAP WITH AMINIMUM R4/ALUE{}F0D, `kg2.3FINAL TESTING AND ADJUSTMENTS: <br />23A AIR BALANCE SHALL BEPERFORMED ATTHE COMPLETION OFTHEPROJECT. BALANCE <br />EACH SUPPLY, RETURN, OUTSIDE AIR DEVICE WITHIN 5% OF REQUIREMENTS AND FURNISHs A REPORT <br />TOTHE CONSTRUCTION PROJECT MANAGER. THE ENTIRE HVACSYSTEM MUST BEFULLY OPERABLE. <br />BALANCED, AND APPROVED BY OWNLER'S REPRESENTATIVE ON THE DAYTENANT OPENS FO )R <br />BUSINESS. <br />232 ADJUST THERMOSTATS AND CONTROL DEVICES TOOPERATE AOINTENDED. ADJUST <br />PUMPS, FANS, ETC. FOR PROPER AND EFFICIENT OPERATION- CERTIFY TOARCHITECT THAT ' <br />ADJUSTMENTS HAVE BEEN MADE AND THAT SYSTEM IS OPERAT ING SATISFACTORILY. CAL|BRATE,o <br />SET AND ADJUST AUTOMATIC TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF <br />INTERLOCK SYSTEMS, AND OPERATION OFSAFETY CONTROLS. <br />23.3 VERIFY ECONOMIZER OPERATION PER MANUFACTURER PROCEDURE. <br />