Laserfiche WebLink
RE-FRIGERATION SPECIFICATIONS <br />SPECIFICATIONS: MISCELLANEOUS REFRIGERATED EQUIPMENT <br />E <br />M_ <br />C? <br />0-, <br />Uj <br />SCOPE <br />IEREAFTER IN THIS SPECIFICATION. THEVAJORD "MIECHANICAL CONTRACTOWSHALL REFER TO THE <br />'NoSTALI IN A <br />i _- _I,'G MECH� NICAL OR REFRIGERATION CONTRACTORAND"O'hNER" SHALL REFER T07-ELEVEN. REFER <br />T 0 SFIEET-DOVV'FOR F)ESPONSIBLE PROVIDERS. IF NOT SPECIFIED, OWNER SHALL PURCHASE EQUIPMENT. <br />AND ARRAIPiIGE TO HAVE THAT EQUIPMENT DELIVERED TO THE STORE SITE. THE MECHANICAL CONTRACTOR SHALL <br />HAVE THE UPRIGHT REFRIGERATED C ABINE'TS UNCRAI ED, SIE"I IN PLACE, 1 EGS INSTALLED, UPRiGHT <br />REFRIGERAT ED CABINETS LEV'ELED, PLACE THE CONDENSING UNITS. MAKE CONNECTIONS FOR THE <br />I RE "I <br />-FRIGERATION LINES AND ELECTRICAL LINES "WHEREALLOWED BY LOCAL CODE) BETWEEN THE <br />UPRIGHT REFRIGERATED CABINETS AND C ONDENSING UNITS, FURNISH AND INSTALL THE CONDENSATE DRAIN <br />LINES AND START UP THE UINITS PER THE INSTALLATION INSTRUCTIONS PACKAGED WITH THE EQUIPMENT. POWER <br />\1VIRING FROM -THE E! EC-1-RICAL PANEL TO TI­IE UPRIGHT REFRIGERATED CABINETS IS THE RESPONSIBILITY OF THE <br />GENERAL CONTRACTOR'S ELECTRICAL- SUB --CONTRACTOR. <br />DE REQUIREMENTS <br />2.1 ALL PROPOSALS SHALL INCLUDE, AND WORK PERFORMED,`3FIALL BE ACCOMPLISHED IN ACCORDANCE <br />WFFI 1 APPLICABLE L(_.)CAL LAVV'S, REGULATIONS. ORDINANCES, STATUTES AND CODES, WHICH SFIALL. BE <br />DELINEATED, AND ALL MODIFICATIONS REQUIRED BY THE INSPECTING AUTHORITY SHALL BE MADE BY THE <br />ME(_.1HANIGAL. CONTRAC-l'ORVOTHOILIT ADD!'! IONAL COST TO THE OWNER. ANY DEVIATIONS REQUIRED DUE TO <br />UNFORESEEN CIRCUMSTANCES, SHALL BE CALLED TO THE ATTENTION OF THE PROJECT CONSTRUCTION MANAGER. <br />3. GUARANTEE <br />3.1 -'�,.,IECi�I.ANI�--Al-�-ONTRACTOR SI--IALL GUARANTEE ALL WORK AND THE COMPLETE SYSTEM OPERATION <br />WILL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIAL THAT THE MECHANICAL CONTRACTOR PROVIDED <br />FOR INSTAL-LATION, FOR A PERIOD r F 90 DAYS AFT"' R ACCEPTANCE BY THE OWNER. ANY PART OFTHE <br />FURNISHED EQUIPMENT ON TI-11S INSTALLATION WHICH PROVES DEFE-E-CTIVE, OR WAS DAMAGED IN SHIPMENT, <br />SHALL BE HANDLED AS STATED IN PARAGRAPH 4 ENTITLED "MECHANICAL CONTRACTOR INSPECTION <br />RESPONSIBII ITIEES"_ <br />3.2 MECHANICAL CONTRACI-I OR SHALL GUARANTEE THAT T HE UNIT HAS BEEN INSTALLED PROPERLY. <br />3. 3 <br />Mr(_,HANI !CAL CONTRACTOR SHALL PROVIDE. THE FOLLOWING INFORMATION TO THE EQUIPMENT <br />MANUJF11`1CTURE-R�S DISTRIBUTOR, AND TO THE O"AINER IF DEFECTS ARE ENCOUNTERED WITH THE EQUIPMENT. <br />"VIC)DEL NUMBER OF"9-IE UNIT. <br />�3,2 SERIAL NUMBER OFTHE UNIT. <br />3.3.3 DATE OF INST ALLAT ION <br />3.3. 4 D"TAILED ACCOUNTOF HE PR( BLEM, DIAGNOSIS, AND REPAIR WORK REQUIRED. <br />'3. 3, 5 PARTS REQUIRING REPLACEMENT. <br />3.33,6 STORE" N"Pli"IBER AND A DDRESS. <br />11 L- U I m j�', J <br />3A MECHANICAL 1CONTRAC"T"OR SHALL FURNISH TO THE O�AJNER'S REPRESENTATIVE ALL CERTIFICATES OF <br />FINAL INSPECTI(Di`,l AND APPROVAL. FROM INSPEC1 K)N AUTHORII IIES HAVING JURISDICTION. <br />WALK IN C0101LER REFRIGERATION SYSTEM INSTALLATION <br />SPEC! C A TION iNTRODUC-i'"ION <br />THE CONTRACTING FOR INSTALLATIONS OF'�!V�'\LK-IN REFRIGERATION EQUIPMENT WILL BE ACCOMPLISHED IN <br />'F H ESE SPE'CI F11 CAT] ONS ARE TO AID IN PREPARA_FIO N OF NATIONAL <br />STANDARD CONTRACT DOCU'NiIENTS <br />SCOPE <br />I HEREAFTER IN -THIS SPECIFICATION, THE WORD TJIECHANICAL CO NTRACTOR" SHALL REFER TO THE <br />INSTALLING IMIECD'HANICAL OR REFRIGERATION CONTRACTOR AN D"OWN ER�' SHALL REFER TO 7-ELEVEN. <br />OWNER SHALL PROVIDE _FHE0JALK--IN COOILER AND FREEZER REFRIGERATION SYSTEMS TO THE MECHANICAL <br />CONTRACTOR AT HIS SHOP OR DESIG-NATED STORAGE FACILITY, AND SPIALL INCLUDE THE HEATCRAFT <br />CIONDENSER,,fVITH ALL CONTROLS, LIQUID DRIERS, SIGHT GLASS, SUCTION FILTERS, SUCTION ACCUMULATORS, <br />I ) t E I <br />HEAD PRESSURE CONTROLS, ALI-. FAC_I_r1RY INSTALLED. THE EVAPORATOR FAN COILS SHALL <br />INCLUDE A BEACON rACR,,'_)-PROCESSOR BOARD, ELE("TRIC EXPANSION/SOLENOID VALVES, THERMISTORS, ALL <br />FACTORY MOUNTED. TFIE MECHANICAL CONTRACTOR SHi-\LL INSTALL THE SYSTEM AS SHOWN ON THE <br />-4 <br />MECI ANT�CAL_ PL./\NS AND SHAI L FURNISH _FHE REFRIGERANT PIPING, SUCTION LINE INSULATION, CONDENSATE <br />i'�RAINLI,,'\,IES. AND R"' FRIGrRANTAS REQ! "IRED. EXACT LOC ATION OF THFCONDENSING UNIT(S) AND <br />E-VAPORATOR GOILS',,NILL BE DETERMINED BY THE PLANS. <br />2. (-.110'DE RE-QUIREMENTS AND PERM[TS <br />2.1 AL[__'VVORK SHALL BE ACCOMPLISHED IN ACCORDANCE 'V"JITH ALL APPLICABLE LOCAL- LAAlS, <br />REGULATIONS, ORDINANCI 5� S 1'ATUTE'S AND CODES, AND ALL MODIFICATIONS REQUIRED BY THE INSPECTION <br />AUTHORITY SHALL BE MADE BY THE r0ECi ]ANICAL CONTRACTOR �N/ITHOUT ADDITIONAL COST TO THE OWNER. <br />2 _K'N PERMITS REQUIRED BY LOCAL OR STATE <br />.2 � 2 OBTAIN, PAY FOR AND FURNISH ALI.. REFRIGERA'I D <br />ORDINANCES OR CODES. <br />_3 NO EXTRAS SFIALL BE ALLOWED DUE TO) CONDITIONS WITH "AlHICHTHE INIECHANI'CAL CONTRACTOR <br />81-101,JI.-D i IAVE BEEN FAMILIAR. <br />3, GUARANTEE <br />3. 1 MECIFlANICAL CONTRACTOR SHALL GUARANTEE ALL WORK AND THE COMPLETE SYSTEM OPERATION <br />'01ILL BE FREE FR'0M DEFEC ­TS IN WORKMANSHIP AND MATERIAL THAT THE MECHANICAL CONTRACTOR <br />'ION, FOR A PERIOD OF90 DAYS AFTER ACCEPTANCE BY THE OWNER. ANY PART OF <br />PROVIDED FOR INSTAULA-T, 1_ <br />T� IE FURNISHED 1EQUIPIMENT ONTHIS INSTALLATION WHICH PROVES DEFECTIVE, ORIAJAS DAMAGED IN <br />IATED IN PARAGRAPH 4 ENTITLED "MECHANICAL CONTRACTOR INSPECTION <br />SHIPMENT, SHALL BE HANDLED AS ST <br />RESPONSIBILITIES'. <br />-A <br />3.2 MECi IANICAL CONTRACTOR SHALL FURNISH TO THE OWNER REPRESENTATIVE ALL CERTIFICATES OF <br />FINAL INSPECTION AND APPR'0VAL FROM INSPECTION AUTHORITIES HAVING JURISDICTION. <br />4. M, CHANICAL CONTRACTOR INSPECTION RESPONSIBILITIES <br />4, 1 ("HECK EACH PIECE'OF REFRIGERATION EQUIPMENT FOR DAMAGES AND SHORTAGES. IF SUCH <br />CONDITIONS EXIST, THE MECI�-IANICAL CONTI FACTOR SFIALL� <br />4, '1 - 11 OBT AIN INSPECTION REP'3R FIN DUPI ICATE FROMITHE COMMON CARRIER AND NOTIFY OWNER <br />OFFICE ANDREFRIGERATION EQUIPMENT SUPPLIER IMMEDIATELY. <br />4 � 111. -) MAKE * REPAIRS WHIEN AUTHORIZED TO DO SO BY MANUFACTURER'S REPRESENTATIVE, <br />REPLA""'ING ANY NIALFUNC-1-IONING PARTI�S)ON THE EQUIPMENT WITHOUT CHARGE TO THE OWNER. <br />5. EQUIPMENI. <br />EVAPORATOR FAN COILS <br />TNIE MECHANICAL CONTRACTOR S31-1ALL HANGTIHE EVAPORATOR COILS IN ACCORDANCE WITH THE MECIdANICAL <br />PLAN. ALI- MOUNTIN"IS !--I AR DVVAR E, TO INCLUDE A BEARING SURFACE FOR T1 iE I iANGER RODS, SHALL BE <br />FURNISHED BY THE MECHAIN11CAL. CONTRACTOR. THE EVAPORATOR FAN COILS ARE IN NO CIRCUMSTANCE TO BE <br />SUPPOR'flr'�_:D BYTHE V',jALK-IN COOLER PANELS ALONE. <br />5.2 APPROVED COOLER (VAULT) REFRIGERATION EQUIPMENT MANUFACTURERS AND MODEL NUMBERS <br />R 4, 4 8 A <br />5.2 1 H"EATCRAFT/13OHN REMO TE CONDENSING UNITS INCLUDING%' 1) MEDIUM TEMP COMPRESSOR FOR <br />VALILT COOLER, (11 COMPRESSOR FOR VAULT ICE S T(DRAGIP, AND (1) LOW TEMP COMPRESSOR FOR <br />VAIULTFREEZF`R� STORAGE. <br />6. INSTALLATION REQUIREMENTS <br />6.1 REFRIGERANT PIPING <br />6.1.1 ALL SUCTION LINE PIPING SHALL BE SEALED REFRIGERANT GRADE", TYPEL, HARD DRAWN. THE <br />LIQUID LINE PIPING SHALL. BE SEALED REFRIGERANT GRADE, TYPE C, HARD DRAWN ON ALL MAIN RUNS. <br />THE SHORT SECTION OF TUBING BETWEEN THE MAIN LIQUID LINE AND EXPANSION VALVE SHALL BE SOFT <br />DRAWN REFRIGERANT TUBING. <br />6.1.2 ALL HORIZONTAL TUBING RUNS SHALL BE SLOPED TOWARD Tf--IE COMPRESSOR, AND/OR "P'' <br />TRAP 1 INCH PER 20 FEET. ALL. VERTICALLY RUN SUCTION LINES SHALL BE P-TRAPPE-D AT- THE BASE OF <br />EACH SUCTION RISER OF 4 FEET OR MORE TO ENHANCE OIL. RETURN TO THE COMPRESSOR, AND SHALL BE <br />P-TRAPPED FOR EACH 20 FEET SECTION OF RISER. <br />61.3 ONLY SILVER BASE SOLDIER (15% SILVER) SHALL BE USED FOR THIS INSTALL ATION. <br />6.1 A REFRIGERANT PIPING IN THE WALK-IN SHALL BE STRAPPED TO ASSURE PIPING SUPPORT.THIS <br />STRAPPING SHALL BE COPPER, IF NON -COPPER STRAPPING IS USED, IT SHALL BE LiNED'VVITH AN <br />INSULATING MATERIAL TO PREVENT BI-METALLIC ELECTROLYSIS. REFER TO MANUFACTURER'S <br />iNSTALLATION MANUAL FOR RECOMMENDED PIPE SUPPORT SPACING. <br />6-2 REFRIGERANT LEAK TESTING <br />621 AFTER ALL. REFRIGERANT TUBING IS CONNECTED, THE ENTIRE SYSTEM. IN(I'l�LUDING THE <br />CONDENSING UNIT, SHALL BE PRESSURIZED TO 150 PSIG VVITId A MlIXTURE OF APPROPRIATE REFRIGERANT <br />AND DRY NITROGEN. ALL CONNECTIONS, BOTH FLARED AND SOLDERED, SHALL BE THOROUGHLY <br />CHECKED WITH AN ELECTRONIC OR HALIDE LEAK DETECTOR. ALL LEAKING SOLDER CONNECTIONS SHALL. <br />BE DISASSEMBLED, CLEANED AND RE -SOLDERED. <br />6.3 EVACUATION <br />6.3A THE COMPLETE SYSTEM SHALL BE EVACUATED VJITH A VACUUM PUMP. TI-IF REFRIGERATION <br />COMPRESSOR SHALL NOT BE USED TO EVACUATE -THE SYSTEM- <br />6.3.2 THE COMPLETE SYSTEM, TO INCLUDE THE CONDENSING UNIT, SHALL BE EVACUATED A <br />MINIMUM OF THREE TIMES. THE VACUUM SHALL BE BROKEN THE FIRST AND SECOND TIME AT 500 MICRONS <br />USING APPROPRIATE REFRIGERANT.THETHIRD VACUUM SHALL BE BROKEN BYTHIE CHARGING <br />REFRIGERANT. <br />6.4 SUCTION LINE INSULATION <br />6.4.1 THE MAIN SUCTION LINE INSIDE THE COOLER (VAULT) TO INCLUDE THE `P` TRAP, THE VERTICAL <br />SUCTION RISER, ALL ABOVE ROOF SUCTION PIPING SHALL BE INSULATED WITH 1/2"'AIALL ARMAFLEX OR ITS <br />EQUIVALENT. ALL. JOINTS ISHALL BE PROPERLY SEALED WITH APPROVAL BY IlNiSLILATION MANUFACTURER'S <br />ADHESIVE OR SEALANT. <br />6.5 CONDENSATE DRAIN LINES <br />6�5.1 CONDENSATE DRAIN LINE MATERIAL SHALL BEV' O.D. HARD DRAWN COPPER -I UBING <br />MECHANICAL CONTRACTOR SHALL INSTALL HEATTRACE IN LOW TEMP SECTION OF VAUL'T. REF Et-JECTRIC"AL <br />SPECIFICATIONS SECTION 3.5.12 FOR HEAT TRACE REQUIREMENTS. <br />6�5.2 THE LINES SHALL BE CAPABLE OF BEING OPENED AS CLOSE TO THE EVAPORATOR DRAIN <br />AS POSSIBLE TO ALLOW EFFECTIVE CLEANING. <br />6.5�3 THE DRAIN LINE SHALL BE TRAPPED ON A VERTICAL SLOPE PRIOR TO REACHING THE <br />RECEIVING FLOOR DRAIN OR PIT (WHICHEVER IS ALLOWABLE UNDER LOCAL CODES) <br />6.5.4 - 'THE DRAIN LINE SHALL HAVE A DEFINITE SLOP' AWAY FROM THE -EVAPORATOR OR DRAIN <br />PIT (WHICHEVER IS ALLOWABLE UNDER LOCAL CODES). THE DRAINS FROM THE EVAPORATORSSFIALL BE <br />JOINED TO MAIN DRAIN LINE SHALL RUN TO A DRAIN LOCATION SFIOWN ON THE MECHANICAL PLAN <br />AND SHALL BE FIRMLY SUPPORTED WITH STRAPS AT LEAST EVERY SIX FEET ALONG3 THE DRAIN RUN. <br />6.5 SYSTEM SET-UP <br />6.6A THE OIL LEVEL IN THE COMPRESSOR SIGHT GLASS SHALL BE BETWEEN 113 AND 1/2 FULL AT <br />ALL TIMES (FOR SEMI -HERMETIC COMPRESSORS ONLY. HERMET IG COMPRESSORS DO NOT HAVE OIL SiGI-fl- <br />GLASS). <br />6.6.2 THE PROPER AMOUNT OF REFRIGERANTSHALI1 BE CHARGED INTOTI-iE SYSTEM \AJITHI THE <br />COMPRESSOR OPERATING AT THE PROPER HEAD PRESSURE (SEE MANUFACTURER�S SPEC[ FICATIONS). <br />6.6.3 ONLY SUNISO-3GS OIL.. SHALL. BE USED ION THE MEDIUM FEMP SYSTEMS AND MOBIL EAL <br />ARCTIC 22 C(' , OIL SHALL BE USED IN -I HE LOW TEMP SYSTEMS. <br />6.6.4 THE THERMOSTATIC EXPANSION VALVE ED'BY 'THE BEACON <br />MICRO -PROCESSOR BOARD AND IS FACTORY SETAT 8 DEG. THE IMECI IANICAL CONTRACTOR SHALL CHECK <br />THE SUPERHEAT AT THE COMPRESSOR TO ENSURE THECOMPRESSOR SUPERHEAT MEETS THE <br />COMPRESSOR MANUFACTURER'S GUIDELINES. THE MECHANICAL CONTRACTOR MAY HAVE TO ADJUST <br />SUPERHEAT AT BEACON BOARD TO CORRECT INCORRECT SUPERI-AlEA"T READINGS AT THE COMPRESSOR. <br />6.6.4-1 THE WALK --IN COOLER AND FREEZER THERMOSTATS ARE A PART OF THE BEACON MICRO- <br />PROCESSCR SYSTEM AND ARE FACTORY MOUNTED. TF�� MEO'HANICAL CONTRAC�' (DR SHALL PROGRAM THE <br />BEACON If BOARDS AS FOLLOWS: <br />VAULT COOLER TEMPERATURE SETPOINTS: <br />VAULT COOLER: +38� F <br />VAULT ICE: +20' F <br />VAULT FREEZER: -10' F <br />OTHER REFRIGERATION EQUIPMENT TEMPERATURE SETPOINTS: <br />SANDWICH CASE� 132' F <br />CONDIMENT STATION: +38'F <br />ICE 'CREAM CASE: ­10' F <br />ICED COFFEE ' iCREAM DISPENSER: +38' F <br />UNDER COUNTER REFRIGERATED STORAGE: -�-38' F <br />BACKROOM FREEZER: +10'F <br />6.7 PENETRATIONS <br />6.7A ALL OPENINGS THROUGH THE WALK. -IN PANELS REQUIRED FOR HANGERS, CONDENSATE <br />DRAIN LINES, STRAPPING AND REFRIGERANT PIPING SHALL. 6E SEALED EXTERIOR AND INTERIOR BY THE <br />MECHANICAL CONTRACTOR TO PREVENT MOISTURE FROM ENT ERING THE INSULATION, AND TO MAINTAIN <br />THE WALK-IN VAPOR BARRIER- <br />6.7.2 THE MECFIANICAL CONTRACTOR SI--IALI SEAL OFF ALL. PASS-TIHIROUGH OPENINGS <br />REQUIRED FOR REFRIGERANT TUBING IN ACCORDANCE WITH REQUIREMENT S STATED ON I'VIECHANICAL <br />PLAN. <br />7. ELECTRICAL <br />7A ALL PROVISIONS FOR WIRING (LINE VOLTAGE AND BEACON LOW VOUTAGE) SHAL.L. BE BY THE <br />ELECTRICAL CONTRACTOR. FINAL BEACON LOW VOLTAGE WIRING CONNECTIONS SHALL BE BY THE <br />MECHANICAL CONTRACTOR. <br />8- MECHANICAL CONTRACTOR CLEAN-UP RESPONSIBILITIES <br />8.1 REMOVE ALL CRATING FROM PREMISES, <br />8.2 REMOVE ALL LABELS AND CLEAN CONDENSING SURFACES IF REQUIRED, AND STRAIGHTEN <br />CONDENSING COIL FINS IF REQUIRED. <br />8. 3 TOUCH-UP AND REPAIR PAINT AS REQUIRED. <br />1 . SCOPE <br />1.11 HEREAFTER IN THIS SPECIFICATION, THE WORD "MECHANICAL CONTRACTOR" SHALL REFER TO THE <br />INSTALLING MECHANICAL. OR REFRIGERATION CONTRACTOR AND "OWNER" SIdALL REFER TO 7-ELEVEN, OWNER SHALL <br />PURCIHASE THIE EQUIPMENT AND ARRANGETO HAVE THAT EQUIPMENT DELIVERED TO THE STORE SITE. THE <br />MECHANICAL CONTRACTOR SI--IALL HAVE UNITS UNCRATED, SET IN PLACE, LEGS INSTALLED (IF APPLICABLE), <br />EQUIPNIENT LEVELED, INSTALL THE CONDENSATE DRAIN LINES (IF REQUIRED) AND START UP THE UNITS PER THE <br />INSTALLATION INSTRUCTIONS PROVIDED WITH THE EQUIPMENT. POWER WIRING FROM THE ELECTRIC' AL. PANEL TO <br />THE 'VVALK--IN COOLER IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR'S ELECTRICAL SUB -CONTRACTOR. <br />EXACT LOCATIONS OF EQUIPMENT WILL BE DETERMINED BY THE FLOOR PLAN AND MEASUREMENTS AT THE <br />BUILDING AND IN COOPERATION WITH CCNTRACTORS AND IN ALL CASES, SHALL BE SUBJECT TO APPROVAL OF THE <br />OWNER'S DIVISION CONSTRUCTION MANP.GER. <br />2. CODE REQUIREMENTS <br />2-1 ALL PROPOSALS SHALL INCLUDE, AND WORK PERFORMED SHALL BE ACCOMPLISHED IN ACCORDANCE WITH <br />ALL APPLICABLE LOCAL LAWS, REGULATIONS, ORDINANCES, STATUTES AND CODES, WHICH SHALL BE DELINEATED <br />AND ALL MODIFICATIONS REQUIRED BY THE INSPECTING AUTHORITY SHALL BE MADE BY THE MECHANICAL <br />CONTRACTOR VVITHOUTADDITIONAL COST TO THE OWNER, ANY DEVIATIONS REQUIRED DUE TO UNFORESEEABLE <br />CIRCUMSTANCES, SHALL BE CALLED TO THE ATTENT ION OF THE DIVISION CONSTRUCTION MANAGER. <br />3, GUARANTEE <br />3.1 MECHANICAL CONTRACTOR SHALL GUARANTEE ALL WORK AND THE COMPLETE SYSTEM OPERATION <br />WILL. BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIAL THAT THE MECHANICAL CONTRACTOR PROVIDED <br />FOR INSTALLATION, FOR A PERIOD OF 90 DAYS AFTER ACCEPTANCE BY THE OWNER, ANY PART OF THE <br />FURNISHED EQUIPMENT ON THIS INSTALLATION WHICH PROVES DEFECTIVE, OR WAS DAMAGED IN SHIPMENT, <br />SHALL BE HANDLED AS STATED IN PARAGRAPH 4 ENTITLED "MECHANICAL CONTRACTOR INSPECTION <br />RESPONSIBILITIES", <br />3.2 MECHANICAL CONTRACTOR SHALL PROVIDE THE FOLLOWING INFORMATION TO TFIE EQUIPMENT <br />12.1 MODEL NUMBER OF THE UNIT <br />3.2.2 SERIAL NUMBER OF THE UNIT <br />3.2-3 DATE OF INSTALLATION <br />3.2.4 DETAILED ACCOUNT OF THE PROBLEM, DIAGNOSIS, AND REPAIR WORK REQUIRED <br />3.2-5 PARTS REQUIRING REPLACEMENT <br />3.2.6 STORE NUMBER AND ADDRESS <br />33 MECHANICAL CONTRACTOR SHALL FURNISH TO THE OWNER'S REPRESENTATIVE ALL CERTIFICATES <br />OF FINAL INSPECTION AND APPROVAL FROM INSPECTION AUTHORITIES HAVING JURISDICTION. <br />4� INSTALLATION REQUIREMENTS <br />A. 1 GENERAL <br />411A THE EQUIPMENT FROM VARIOUS MANUFACTURERS IS CONFIGURED SIMILARLY WITH MINOR <br />DIFFERENCES DUE TO INDIVIDUAL MANUFACTURER'S DESIGN. INSTALLATION INSTRUCTIONS ARE BASICALLY <br />SIMILAR FOR EACH MANUFACTURER'S EQUIPMENT. <br />4.2 RE -FAIL REFRIGERATION EQUIPMENT <br />4�2.1 INSTALLAT!ON INSTRUCTIONS <br />PARTS REQUIRED: <br />1. R448A REFRIGERANT FOR ALL. REMOTE CONDENSING UNITS EXCEPT ICE MAKER <br />AND SLURPEES (R404A): UP TO 15LBS 4 OZ PER CONDENSER. <br />2.'VVALL MOUNTED ELECTRICAL JUNCTION BOX WITH STRAIN RELIEF <br />3. 50 FEET(MIAX) OF ELECTRICAL CONDUIT WITH MINIMUM AWG 22 STRAND 7X30 v"11RE. <br />4. MOUNTING HARDWARE FOR JUNCTION BOX BRACKETS, CLAMPS ANID REMOTE CONDENSER. <br />CONTENTS OF KIT: <br />1. REMOTE CONDENSER <br />2. FLEXIBLE LINE SET <br />3. QUICK DISCONNECT FITTINGS <br />4. 50 FEET OF 3/8" INSULATED LINE SET <br />1, 50 FEET OF 5/8" INSULATED LINE SET <br />6. COPPER ELBOW FITTINGS <br />7. MOUNTING STRUT AND CLAMPS <br />8. JUMPER FOR ELECTRICAL CONNECTION <br />INSTALLATION INSTRUCTIONS: <br />1. UNPACK CONDENSER <br />2. CONDENSER INSTALLATION <br />3. REFRIGERATION LINE INSTALLATION <br />4. ELECTRICAL CONNECTIONS <br />5. FBD UNIT INSTALLATION <br />6. REFRIGERANT CHARGING <br />7. UNIT START LIP <br />INSTALLATION: <br />1 . CAREFULLY UNPACK THE CONDENSING UNIT. <br />2. CONDENSER INSTALLATION: INSTALL THE REMOTE CONDENSER ACCORDING TO THE <br />DOCUMENT"INSTALL AND MAINTENANCE DATA" PROVIDED WITH THE CONDENSER. <br />4.2.2 ICE MAKER (PIPED TO THE HOSHIZAKI REMOTE CONDENSING UNIT. PRECHARGED <br />REFRIGERANT LINE SET FURNISHED BY THE ICE MAKER MANUFACTURER.) <br />4.2.3 SANDWICH CASE (PIPED TO THE HEATCRAFT REMOTE CONDENSING UNIT. PRECHARGED <br />REFRIGERANT LINE SET FURNISHED BY THE SANDWICH CASE MANUFACTURER.) <br />4�2.4 SLURPEE (PIPED TO THE FBD SINGLE REMOTE CONDENSING UNIT. PRECF­IARGED <br />REFRIGERANT LINE SET FURNISHED BY THE SLURPEE MANUFACTURER.) <br />425 FROZEN LEMONADE (PIPED TO FBD DUAL. REMOTE CONDENSING UNIT. PRECI-iARGED <br />REFRIGERANT LINE SET FURNISHED BY THE FROZEN LEMONADE MANUFACTURER.) <br />4.3 CONDENSATE DRAIN <br />4.11 NORMALLY, THE CONDENSATE DRAIN CONNEC TION INCLUDED WITH THE UNIT, WILL BE STUBBED <br />OUT AT THE BOTTOM OF THE CABIINIET, (IF REQUIRED). MECHANICAL CONTRACTOR SHALI_ FURNISH AND INSTALL-. <br />A DRAIN LINE FROM THE CABINETS TO THE FLOOR, DRAIN. IT SHALL BE PERMISSIBLE TO MANIFOLD THE DRAINS <br />INTO A COMMON DRAIN LINE� THE MANIFOLD SHALL BE 1 INCH DIAMETER MINIMUM. COPPER WILL BE <br />ACCEPTABLE. EACH DRAIN CONNECTICN SHALL BE FULL SIZE OF THE EQUIPMENT DRAIN CONNECTION SERVED. <br />4A UNIT START UP AND CHECKOUT <br />4.4.1 MECHANICAL CONTRACTOR SHALI FOLLOW THE SPECIFIC UNITINSTALI ATION PROCEDURES <br />,,AIHICH ARE PACKAGED WITH EACH PIECE OF EQUIPMENT WHEN DELIVERED TO THE ST ORE� <br />MECHANICAL CONTRACTOR RESPONSIBILITIES <br />5A RIEMOVE ALL CRATING FROM PREMISES. <br />5�2 CHECK EACH PIECE OF REFRIGERATION EQUIPMENT FOR DAMAGES. NOTIFY THE OWNER'S DIVISION <br />OFFICE IMMEDIATELY- MAKE REPAIRS ONLY WHEN AUTHORIZED TO DO SO. <br />5.3 OBTAIN, PAY FOR AND FURNISH ALL REFRIGERATION PERMITS REQUIRED BY LOCAL OR STATE <br />ORDINANCES OR CODES. <br />9 <br />COMPLY WITH ALL LOCAL AND STATE CODES; IN JURISDICTION WHENEVER THE SPECIFICATIONS <br />DO NOT MEET CODES, THE CODES SHALL TAKE PREFERENCE, NOTIFY OWNER'S DIVISION CONSTRUCTION <br />OFFICE REGARDING REQUIRED MODIFICATIONS. <br />g <br />NO EXTRAS SHALL. BE ALLOWED DUE TO CONDITIONS WITH WHICH THE MECHANICAL CONTRACTOR <br />91-11OULD HAVE BEEN FAMILIAR. <br />6. ELECTRICAL <br />k�j ALL PROVISIONS FOR WIRING, EXCEPT LOW VOLTAGE CONNECTIONS, SHALL BE BY THE ELECTRICAL <br />CONTRACTOR. FINAL CONNECTIONS SHALL BE BY THE MECHANICAL CONTRACTOR FOR LOW VOLTAGE. <br />6.2 ALL ELECTRICAL POWER SUPPLY WIRING SHALL BE BY ELECTRICAL CONTRACTOR. <br />6.3 <br />ALL LINE VOLTAGE CONTROL WIRING FROM THE RETAIL REFRIGERATION EQUIFMENT TO THE <br />CONDENSER UNIT(S) SHALL BE BY THE ELECTRICAL CONTRACTCR. <br />w <br />U) <br />LLJ <br />U) <br />Ld <br />bu <br />> <br />w <br />LU <br />�; <br />w <br />Ljj <br />�5 <br />w <br />I-- <br />W <br />co <br />M <br />w <br />CL <br />w <br />a_ <br />w <br />0- <br />w <br />0- <br />m <br />(D <br />-r- <br />0 <br />v­ <br />0 <br />0 <br />0 <br />C) <br /><1 <br />< <br />PROTO 10-23-2019 <br />6050 - RIGHT <br />Lo <br />Z C:) <br />z C:) <br />w <br />w <br />Lij <br />U) <br />z <br />0 0 <br />Cm <br />00 <br />m < <br />LL <br />w <br />> <br />w <br />z <br />0 <br />0 < <br />w <br />0 <br />UL <br />w <br />LID <br />.......... <br />mmmggk� gpmq&\� mmu- likkk <br />Itat IC;- " w%','%\; <br />mILL, <br />Architectural <br />Soliuttwriis Group <br />0 <br />T_ <br />o <br />00 <br />0 <br />w <br />M <br />0 <br />E <br />Ir- <br />0 <br />0 <br />_L <br />z <br />00 <br />w <br />�r_ <br />(n <br />< <br />0 <br />CN <br />C., <br />z <br />"y' <br />z <br />An <br />U <br />V) <br />_CD <br />---------- -- - <br />rev 02/28119 SHEET: <br />M2.1 <br />