<br />CONTRACTOR SHALL BE RESPONSIBLE FOR STRICTLY ADHERING TO THE RECOMMENDATIONS OF SAID
<br />SOILS REPORT FOLLOWING ALL APPLICABLE PROCEDURES NOTED THEREIN. EXISTING WATER TABLE SHALL
<br />POSSIBLY DETERMINE j DIFFERENT = TANK STRAPSAND ■_ OF BACK FILL
<br />MATERIAL. SHOULD GROUND WATER OR CONTAMINATION BE DISCOVERED DURING TANK EXCAVATION,
<br />WORK SHALL BE SUSPENDED PENDING REVIEW BY 7-ELEVEN CONSTRUCTION MANAGER.
<br />4.4 CONTRACTOR SHALL REPORT ANY OBJECTION TO MATERIALS, APPLIANCES, OR METHODS OF
<br />CONSTRUCTION S• R SPECIFIED
<br />TO THE OWNER'S CONSTRUCTION MANAGER AND OBTAIN 1.
<br />DECISION BEFORE PROCEEDING.
<br />4.5 PROPOSALS: CONTRACTOR SHALL SUBMIT BID ONLY ON 7-ELEVEN'S FORM THAT WILL BE PROVIDED BY
<br />=MANAGER,_ - PROPOSALS SUB D ON ANY
<br />OTHER FORM SHALL BE REJECTED AND RETURNED. PROPOSALS NOT COMPLETELY AND PROPERLY FILLED
<br />OUT SHALL BE REJECTED. PROPOSALS SHALL INCLUDE MONEYS FOR REMOVAL OF ALL EXISTING
<br />IMPROVEMENTS AS REQUIRED FOR GASOLINE INSTALLATION.
<br />4.6 PERMITS: CONTRACTOR SHALL, DIRECTED
<br />D !: - PAY FOR APPLICABLE PERMITS AND AND R = •'
<br />PERMITS AND CERTIFICATES
<br />x SHALLBE FORWARDED TO LOCAL— CONSTRUCTION MANAGER'S —
<br />MANAGER PRIOR TO COMMENCEMENT OF WORK. FINAL CERTIFICATION OF ACCEPTANCE BY GOVERNING AUTHORITIES
<br />SHALL ALSO BE ON FILE WITH LOCAL CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO THE PROCESSING OF FINAL
<br />PAYMENT REQUEST.
<br />4.7 INSPECTIONS: CONTRACTOR SHALL BE REQUIRED TO ADHERE TO ALL REQUIREMENTS OF OWNER'S INSPECTION
<br />PROGRAM. CONTRACTOR SHALL COMPLY REQUIREMENTS FOR NOTIFICATION, SITE
<br />. - PREPARATION REQUIREMENTS,
<br />COMPLIANCE, ON -SITE PRESENCE DURING INSPECTION AND CORRECTION OF ANY DEFECTS OR RELATED PROBLEMS AS
<br />DIRECTED BY INSPECTING REPRESENTATIVE CONTRACTOR SHALL PROVIDE NO LESS THAN 48 HOURS NOTICE PRIOR TO
<br />4.8 COORDINATION: FUEL CONTRACTOR SHALL BE: RESPONSIBLE FOR SCHEDULING ALL PHASES OF THE GASOLINE
<br />INSTALLATION WITH THE GENERAL CONTRACTOR IN CHARGE OF THE BUILDING OR MAJOR PORTION OF THE PROJECT. THE
<br />BUILDING GENERAL CONTRACTOR AND THE FUEL CONTRACTOR SHALL JOINTLY DEVELOP A MUTUALLY AGREEABLE
<br />SCHEDULE AND TIMETABLE FOR COMPLETION ON THE GASOLINE INSTALLATION. TIMETABLE FOR BUILDING AND GASOLINE
<br />SHALL COINCIDE AND COMPLIMENT EACH OTHER SO THAT ONE DOES NOT DELAY THE OTHER.
<br />SHOULD FUEL CONTRACTOR FAIL TO MEET DEADLINES AS ESTABLISHED BY THE SCHEDULE AND/OR HOLD UP THE
<br />COMPLETION OF THE OVERALL BUILDING PROJECT, 7-ELEVEN, INC. RESERVES THE RIGHT TO RECTIFY THE SITUATION
<br />ACCORDINGLY.
<br />4.9 CONTRACTOR SHALL PROVIDE OWNER WRITTEN CERTIFICATION AS TO THE FOLLOWING:
<br />4.9.1 CERTIFICATION FROM LOCAL/STATE GOVERNING AUTHORITIES AS APPLICABLE FOR CONTRACTOR
<br />CERTIFICATION/LICENSING FOR INSTALLATION OF GASOLINE: STORAGE TANK SYSTEM.
<br />4.9.2 CERTIFICATION FROM EQUIPMENT MANUFACTURES AND SUPPLIERS (TANKS, PRODUCT LINES,
<br />ATG'S, ETC.) AS TO ATTENDING AND ACHIEVING CERTIFICATION FROM APPROPRIATE COMPANY FOR
<br />INSTALLATION OF EQUIPMENT.
<br />4.9.3 CERTIFICATION ON APPROPRIATE FORMAT AS TO INSTALLATION OF COMPLETE SYSTEM BEING
<br />PERFORMED IN COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL LAWS AND REGULATIONS.
<br />4.9.4 CERTIFICATION THAT ALL EQUIPMENT EITHER SUPPLIED BY OWNER OR CONTRACTOR HAS BEEN
<br />INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS BY PERSONNEL TRAINED AND QUALIFIED
<br />FOR THAT SPECIFIC ITEM.
<br />00
<br />N O
<br />I_
<br />W `7
<br />W
<br />G
<br />m
<br />C CD
<br />W �
<br />z
<br />rcr_
<br />r) a
<br />6001,, 7
<br />s
<br />a
<br />(� g1 S }
<br />t
<br />x u.
<br />r�xmss s.
<br />S
<br />`7
<br />,
<br />a
<br />PART 4 CONTINUED
<br />SHIPPING4.11 LIENS: CONTRACTOR SHALL PERMIT NO LIENS OF ANY KIND TO BE FIXED UPON OR AGAINST THE PROPERTY BY ITS
<br />SUBCONTRACTORS, LABORERS, MECHANICS OR MATERIAL MEN, AND SHALL INDEMNIFY, PROTECT AND SAVE OWNER
<br />HARMLESS FROM AND AGAINST ALL SUCH CLAIMS AND LIENS.
<br />4.12 EQUIPMENT RESPONSIBILITY: CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING, RECEIVING, UNLOADING,
<br />HANDLING AND PROVIDING PROTECTED INSIDE STORAGE FOR ALL OWNER SUPPLIED EQUIPMENT AND MATERIAL.
<br />CONTRACTOR SHALL INSPECT EQUIPMENT UPON RECEIPT AND IMMEDIATELY REPORT ANY DAMAGE DUE TO
<br />THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO FAILURE TO COMPLY
<br />WITH THESE REQUIREMENT& DISPENSERS SHALL BE PROTECTED WITH SHIPPING BOXES UNTIL STORE IS TURNED OVER
<br />FOR OPENING. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ADEQUATE AND LOCKED STORAGE OF OWNERIS
<br />MISCELLANEOUS EQUIPMENT, TO INCLUDE GASOLINE CONSOLE, PRIOR TO OPENING OF THE STORE.
<br />4.13 FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR FILING OF RECEIVING FORMS AND MISCELLANEOUS CONFIRMATION OF
<br />EQUIPMENT RECEIVING INFORMATION AS REQUIRED BY LOCAL CONSTRUCTION OFFICE.
<br />4.14 FUEL CONTRACTOR SHALL PROVIDE ALL PIPING WIRING, MATERIAL AND LABOR AS REQUIRED TO INSTALL OWNER
<br />SUPPLIED EQUIPMENT. INCLUDE MONEY IN BID PROPOSAL FOR INSTALLATION OF OWNER SUPPLIED EQUIPMENT
<br />UNLESS
<br />NOTED
<br />MATERIALSPART 6 - SUBSTITUTION OF MATERIALS
<br />6.1 R D REPRESENT REQUIRED STANDARDS. PROPOSED
<br />ADEQUATE SUPPORTING DATA FURNISHED. USE OF SUBSTITUTE MATERIALS IS DEPENDENT ON RECEIPT OF WRITT
<br />APPROVAL FROM OWNER'S APPROVED REPRESENTATIVE.
<br />COMPLETION OF CONTRACT
<br />7.1 THE CONTRACT SHALL BE CONSIDERED FULFILLED, SAVE AS PROVIDED IN ANY MAINTENANCE STIPULATIONS, BOND OR P
<br />ACCEPTANCELAW, WHEN ALL THE WORK HAS BEEN COMPLETED WITH FINAL INSPECTION AND X APPLICABLE
<br />GOVERNING BUILDING DEPARTMENTS, FIRE MARSHAL'S OR OTHER JURISDICTIONS.
<br />7.2 NOT USED
<br />7.3 CLEANING:
<br />7.3.1 ALL WORK SHALL BE CLEAN AND READY FOR USE UPON COMPLETION. REMOVE TEMPORARY TAPES,
<br />WRAPPING, COATING, PAPER LABELS AND OTHER ITEMS.
<br />7.3.2 CLEANING METHODS FOR PROPRIETARY MATERIALS SHALL BE IN STRICT ACCORDANCE WITH
<br />MANUFACTURER'S INSTRUCTIONS. CLEANING SOLUTIONS, AGENTS; SOLVENTS, WAXES OR OTHER
<br />MATERIALS SHALL DE ONLY AS APPROVED BY THE MANUFACTURER OF THE MATERIAL INSTALLED IN
<br />THE WORK.
<br />7.3.3 CLEANUP: CONTRACTOR SHALL CLEAN UP ALL DEBRIS CAUSED BY THE WORK OF THIS SECTION,
<br />KEEPING THE PREMISES NEAT AT ALL TIMES.
<br />PAR -PH - CODES
<br />8.1 THE FOLLOWING CODES ARE MADE APART OF THIS SPECIFICATION. SAID CODES SHALL DICTATE MINIMAL ACCEPTABLE
<br />STANDARDS. CODE SHALL BE ADHERED TO UNLESS LOCAL GOVERNING AUTHORITIES DICTATE HIGHER OR MORE
<br />STRINGENT REQUIREMENTS WHICH SHALL TAKE PRECEDENCE:
<br />8.1.1 NFPA 30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE
<br />8.1.2 PEI MANUAL "RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND LIQUID STORAGE
<br />SYSTEMS." #RP-100-96 (OR LATEST EDITION)
<br />8.1.3 OSHA AND LOCAL MUNICIPALITIES
<br />� X P ,X . •, XR P j -
<br />SECTION
<br />E"
<br />INSPECTIONS
<br />5
<br />/TESTING
<br />TEST BEFORE PLACING THE SYSTEM
<br />IN SERVICE
<br />COMPONENT
<br />MANUFACTURER
<br />Table below lists current Manufacturer's Installation and Testing Guidelines that may
<br />be applied to the fuel system components after assembly but before backfilling.
<br />Before the beginning of fuel system installation, fuel contractor is to be responsible
<br />for reading through the entire Installation Manual and Operating Guidelines as well as
<br />any applicable supplemental materials. It is the responsibility of the fuel contractor
<br />and fuel operator to understand and follow all requirements contained in the
<br />installation and testing manuals. Work must be performed according to standard
<br />industry practices applicable to tank installations and operations. Work must also
<br />comply will all applicable codes regulations and standards of appropriate
<br />governmental agencies.
<br />DOUBLE -WALLED STORAGE
<br />TANK
<br />XERXES oA 7CL
<br />COMPANY
<br />INSTALLATION
<br />MANUAL
<br />Lttp://vfww.zcl.core:/asset:s/doctirrients/library/inct Il tiofi`/20
<br />0
<br />manua1%20andP20oKerating-6--2-0_-.-.�uidelne.172-0�imo__%-_2-0-f�or%
<br />--
<br />0xerxe %5_6tanks. d-
<br />TESTING
<br />PROCEDURE
<br />http://www,zcl.com/assets/documents/library/installation%20
<br />manual%20and%20o eratin %20 uideIines%20 imo %20for%
<br />p g g ( g)
<br />20xerxes% 20tanks.pdf
<br />DOUBLE -WALLED PIPING
<br />NOV
<br />INSTALLATION
<br />MANUAL
<br />http://www.nov.com/Segments/Completion_ and Production_
<br />Solutions/Fiber ®Glass_Systems/Fuel Handling/Red_ Thread_IIA.
<br />aspx
<br />TESTING
<br />PROCEDURE
<br />htt www.nov.com docHandler.as x? uid=12bN7w
<br />p // jC3oL35C f p p
<br />LEAK DETECTION SENSOR
<br />VEEDER ROOT
<br />T
<br />INSTALLATION
<br />MANUAL
<br />http://www.gilbarco.com/gold/gold_public_access.cfm.section
<br />id=361
<br />TESTING
<br />PROCEDURE
<br />http://www.gilbarco.com/goid/gold_public_access.cfm?section
<br />id=361
<br />AUTOMATIC TANK GUAGES
<br />VEEDER ROOT
<br />INSTALLATION
<br />MANUAL
<br />http://www.gilbarco.com/gold/gold_public_access.cfm?section
<br />id=364
<br />TESTING
<br />PROCEDURE
<br />: htt www.veeder.com us tls-automatic-tank- e
<br />p // / /products / gau g
<br />-systems/atg-tls-consoles/tls-350r-automatic-tank-gauge
<br />OVERFILL PREVENTION DEVICES
<br />OPW
<br />INSTALLATION
<br />MANUAL
<br />http://www.opwgiobaI.com/docs/libraries/manuals/retail-fueli
<br />ng/below-ground/opw-fcs-manuals/71so-testable-(h15524pa)-
<br />1-30-14.pdf?sfvrsn=4
<br />TESTING
<br />PROCEDURE
<br />http://www.opwglobal.com/docs/libraries/manuals/retail-fueli
<br />ng/below-ground/opw-fcs-manuals/71so-testable-(h15524pa)-
<br />1-30-14.pdf?sfvrsn=4
<br />SPILL -CONTAINMENT
<br />MANHOLES
<br />OPW
<br />INSTALLATION
<br />MANUAL
<br />htt : www.o w lobaI.com docs libraries manuals retail-fueli
<br />p // p g / / / /
<br />ng/below-ground/opw-fcs-manuals/1-3100 EDGE Thread -On
<br />Spill_ Installation Inst_202181_2-13-13_G.pdf?Status=Master&
<br />sfvrsn=0
<br />TESTITESTING
<br />NG
<br />PROCEDURE
<br />http://www.opwgiobal.com/docs/libraries/manuals/retail-fueli
<br />ng/below-ground/opw-fcs-manuals/Double_Wall_Spill_Contain
<br />er Vac_ Test_ Installation_ Instructions-_English_202383.pdf?St
<br />atus=Master&sfvrsn=0
<br />IMPACT VALVES
<br />OPW
<br />INSTALLATION
<br />MANUAL
<br />http://www.opwglobaI.com/docs/libraries/manuals/retail-fueli
<br />ng/below-ground/opw-fcs-manuals/10_Series_Emergency_She
<br />ar_Valve _Installation _Instructions _-_English_H11374PA.pdf?St
<br />atus=Master&sfvrsn=0
<br />TESTING
<br />PROCEDURE
<br />http://www.opwglobal.com/docs/libraries/manuals/retail-fueli
<br />ng/below-ground/opw-fcs-manuals/10_Series_Emergency_She
<br />ar_Valve _Installation ®Instructions -_English_ H11374PA..pdf?St
<br />atus=Master&sfvrsn=O
<br />MECHANICAL LINE LEAK
<br />DETECTORS
<br />VAPORLESS
<br />MANUFACTURING
<br />INSTALLATION
<br />MANUAL
<br />http://www.vaporiess.com/installation/installpdf/install_ld200
<br />O.pdf
<br />TESTING
<br />PROCEDURE
<br />http://www.vaporiess.com/installation/installpdf/install_ld2OO
<br />O.pdf
<br />ELECTRONIC LINE LEAK
<br />DETECTORS
<br />VEEDER ROOT
<br />INSTALLATION
<br />MANUAL
<br />http://www.veeder.com/gold/download.cfm?doc_id=6414
<br />TESTING
<br />PROCEDURE
<br />http://www.veeder.com/gold/download.cfm?doc_id=6414
<br />FLEXIBLE CONNECTORS
<br />FRANKLIN
<br />FUELING
<br />INSTALLATION
<br />MANUAL
<br />http:Hwww.franklinfueling,coat/r ec ia/4610560/40729 001-.r1-
<br />flex--connector-installpdf
<br />PART 1 - GENERAL
<br />1.1 SCOPE: THIS SECTION COVE
<br />RS THE FURNISHING OF ALL LABOR, SERVICES AND EQUIPMENT AS REQUIRE® TO PROVIDE
<br />INSPECTION SERVICES OF THE FUELING INSTALLATION.
<br />2.3 SPILLAGE: SAOXILD SPILLAGE OF PRODUCT OCCUR AT ANY PHASE OF INSTALLATION OR TESTING, LOCAL 7-ELEVEN
<br />CONSTRUCTION DEPARTMENT AND ENVIRONMENTAL DEPARTMENT ARE TO BE NOTIFIED IMMEDIATELY, ESTIMATED LOSS
<br />OF PRODUCT AS WELL AS ACTION TO BE TAKEN BY CONTRACTOR TO SAFEGUARD THE EVENT FROM FURTHER MISHAP AND
<br />TO PROTECT THE GENERAL PUBLIC IS TO BE NOTED AND RECORDED.
<br />2.4 REPRESENTATIVE OF CONTRACTOR AND FUEL CONTRACTOR SHALL BE AVAILABLE ON SITE DURING TESTING PROGRAMS.
<br />FAILURE TO COMPLY WITH THIS REQUIREMENT WILL RESULT IN ANY CORRECTIONS AND/OR REPAIRS REQUIRED BEING
<br />PERFORMED BY OWNER AS REQUIRED. COST OF SAID REPAIRS AND/OR CONNECTIONS SHALL BE DEDUCTED FROM
<br />CONTRACT AMOUNT AS REQUIRED TO SATISFY THE SITUATION.
<br />2.5 PROHIBITED WORK: CONTRACTOR SHALL SCHEDULE WORK SUCH THAT NO HEAVY EQUIPMENT IS OPERATING ON SITE
<br />DURING INSPECTION PROGRAMS. NO WELDING OR OPEN FLAMES SHALL BE ALLOWED ON SITE AT ANY TIME DURING TEST
<br />PV,OCEDIXIES.
<br />2.6 INSTALLATION REPORTS: SHOULD 7-ELEVEN OR THEIR APPOINTED REPRESENTATIVES BE UNABLE TO BE PRESENT AT SITE
<br />R PURPOSES • -- FILING ANY INSPECTIONREPORTS, CONTRACTOR
<br />'x •.R SHALL BE RESPONSIBLE FOR COMPLETE
<br />INSPECTION
<br />D FILING OF P•r LOCALCONSTRUCTION WRITTEN REPORT SX
<br />PHOTOGRAPHIC DOCUM- A IO •,.. ALL PROCEDURES.
<br />FAILURE:2.7 TEST CONTRACTOR x, IMMEDIATELY INSA--
<br />CONTRACTORPROCEDURES AS REQUIRED TO BRING SYSTEM INTO COMPLIANCE SHOULD FAILURE OF TEST DUE TO FACILITY WORK
<br />REQUIRE EXPENDITURE OF ADDITIONAL MONIES FOR RESCHEDULING AND/OR RETESTING OF SYSTEM,
<br />SHALL BE HELD RESPONSIBLE FOR COMPENSATION ACCORDIUGLY.
<br />2.8 v , R III :1 R PRODUCT
<br />R •D-SPILLAGE SHOULD OCCUR DURING CONSTRUCTION
<br />-P. OR DURING WARRANTY PERIOD
<br />DUE TO WORK
<br />PERFORMED —! BY CONTRACTOR, CONTRACTOR x. BE RESPONSIBLER CLEANUP
<br />..r A.-, , BE REQUIRED.
<br />BE RESPONSIBLE FOR FILING COPIES OF TANK AND PIPING TEST/INSPECTION REPORTS WITH LOCAL 7-ELEVEN, INC.
<br />CONSTRUCTION OFFICE OR THE OWNER'S ASSIGNED SITE MANAGER WITH COPY TO JOB SITE.
<br />2.9 TEST REPORT: UPON COMPLETION OF TESTING PROGRAMS, REPRESENTATIVE OF TESTING/ INSPECTION COMPANY SHALL
<br />0
<br />U)
<br />a)
<br />� \l O
<br />RN,
<br />E
<br />m '�° ,& j iirel
<br />v
<br />fry✓ i ��I c � � e
<br />i
<br />A 0114,1111"!
<br />0
<br />q 0
<br />_
<br />W
<br />LI
<br />® CU
<br />, 2 2 - mA
<br />(0 (� o (V o W .0 `2
<br />vim :55�a>�c9
<br />®
<br />j, ®3:®��
<br />03 o v5ae �
<br />-r- .F
<br />®.r-
<br />U)- 11) � o
<br />®o co
<br />� > o0)iO
<br />C o C ��' :0 7
<br />U) ®UC— (15Us 3:
<br />9
<br />W k
<br />µ
<br />G 1
<br />t,�
<br />
|