<br />PART 3 - TANK INSTALLATION INSPECTION
<br />3.1 SCHEDULE: CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING SCHEDULE SO TANKS ARE TESTED AND SET IN TANK
<br />HOLE SAME DAY OF DELIVERY.
<br />3.2 EXCAVATION: ALL EXCAVATIONS SHALL BE COMPLETED WITH BEDDING MATERIAL IN PLACE AND READY FOR INSTALLATION
<br />PRIOR TO TANK DELIVERY.
<br />3.3 ANCHORING: CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE INSTALLATION OF CONCRETE ANCHORS (DEAD MAN).
<br />3.4 STRAPS: HOLD DOWN STRAPS TO BE INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS - MINIMUM OF 4 - MORE IF
<br />REQUIRED BY MANUFACTURER (STRAPS SHALL BE SHIPPED WITH APPROPRIATE PADDING MATERIAL.
<br />3.5 AIR TEST: TANKS SHALL BE AIR TESTED AS PER MANUFACTURER'S SPECIFICATIONS PRIOR TO PLACEMENT. CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR PROVIDING ALL MATERIALS TO PROVIDE COMPLETE AIR TEST INCLUDING, BUT NOT LIMITED
<br />TO, AIR COMPRESSOR OF SUFFICIENT SIZE AND CAPACITY, SPECIFIED SOAP MATERIAL AND ACCEPTABLE SOAP
<br />APPLICATION EQUIPMENT.
<br />3.6 MINIMUM TESTING: DOUBLE WALL FIBERGLASS TANKS SHOULD ARRIVE AT THE JOB SITE WITH A MINIMUM OF 4" HG ON THE
<br />INTERSTICE. OBSERVE THE VACUUM HOLD TEST FOR AT LEAST ONE (1) HOUR PRIOR TO SETTING THE TANKS. SHOULD THE
<br />INTERSTICE NOT HOLD A MINIMUM 4" HG VACUUM, THEN CONTACT THE TANK MANUFACTURER IMMEDIATELY.
<br />3.7 OBSERVATION: 7-ELEVEN'S CONSTRUCTION DEPARTMENT AND/OR REPRESENTATIVE SHALL BE RESPONSIBLE FOR
<br />INSPECTION OF AIR OR VACUUM TEST, OBSERVATION OF LIFTING, SETTING AND BURIAL OF TANKS.
<br />3.8 TANK INSPECTION REPORT: WRITTEN REPORT SHALL INCLUDE PHOTOGRAPHIC DOCUMENTATION OF ALL PROCEDURES.
<br />4.1.6 SITE PREPARATION: CONTRACTOR SHALL PREPARE TANK AREA FOR WATER OR PRODUCT DELIVERY AND
<br />TANK TESTING PROCEDURES.
<br />4.1.7 FILL: CONTRACTOR SHALL PROVIDE 42" MINIMUM BACK FILL OVER TANKS.
<br />4.1.8 WATER: SHOULD WATER BE PRESENT IN TANK HOLE, CONTRACTOR SHALL VERIFY AND NOTIFY 7-ELEVEN
<br />CONSTRUCTION MANAGER OF STATUS.
<br />PLACEMENT4.2 AFTER OF * _ SYSTEM INCLUDINGPRODUCT 11
<br />THIRDVAPOR RECOVERY LINES, SECONDARY CONTAINMENT PIPING AND VENT LINES SHALL BE PERFORMED. TESTING SYSTEM
<br />SHALL BE AS APPROVED BY 7-ELEVEN. 7-ELEVEN WILL BE BILLED DIRECTLY FOR TESTS. CONTRACTOR TO COORDINATE &
<br />SCHEDULE. RETEST OR STAND AROUND TIME BY THE TESTING COMPANY TO BE BILLED TO CONTRACTOR. DETAILS FOR
<br />PARTY TESTING REQUIREMENTS LISTED ON -
<br />AFTER ALL D D PIPING AND ELECTRIC CONDUITSINSTALLED AND DURING EXCAVATION
<br />BACKFILLING AND CONCRETE POURING, A CONTINUOUS HYDROSTATIC TEST SHALL BE PERFORMED ON
<br />ll` • • = 4 .. . •
<br />4.3 PRODUCT DELIVERY: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION TO 7-ELEVEN REPRESENTATIVE OF TEST
<br />DATE AND VERIFICATION OF NEED FOR TANKS TO BE FILLED WITH PRODUCT AND TANK MONITORING SYSTEM TO BE
<br />OPERATIONAL FOR• . A MINIMUM OF 72 HOURSADVANCE NOTIFICATION• •.*
<br />PRODUCT DELIVERY. CHECK WITH LOCAL REGULATORY AGENCIES FOR * . R REQUIREMENTS.
<br />4.4 CONTRACTOR SHALL HAVE REPRESENTATIVES ON SITE TO ACCEPT AND RECORD ALL PRODUCT DELIVERIES.
<br />CONTRACTOR'S REPRESENTATIVE SHALL REMIND DELIVERY COMPANY THAT NO OVERFILL PROTECTION IS INSTALLED AND
<br />TO • • PROCEDURES . DELIVERY AS SITUATION DICTATES.
<br />A�.5 PRODUCT REMOVAL: ANY REMAINING PRODUCT IN VENT LINES UPON COMPLETION OF TEST SHALL BE REMOVED BY
<br />TESTING .A
<br />r STARTUP
<br />5.1 SCHEDULING: CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL SCHEDULING STARTUP AND CHECK-OUT. CONTRACTOR
<br />SHALL NOTIFY LOCAL CONSTRUCTION DEPARTMENT AND APPLICABLE MAINTENANCE DEPARTMENT OFFICE A MINIMUM 0
<br />48 HOURS PRIOR TO INTENDEDk A •r P AND CHECK-OUT DATE AND TIME.
<br />5.2 PERSONNEL: CONTRACTOR, FUEL SUBCONTRACTOR AND ELECTRICAL SUBCONTRACTOR SHALL BE AVAILABLE ON -SITE
<br />DURING STARTUP, APPROVED BY7-ELEVEN,f STARTUPS ARE TO BE DONE BY AN AUTHORIZED
<br />MANUFACTURER'S CONTRACTOR _ THAT PIECE OF EQUIPMENT.
<br />5.3 As STARTUP AND CHECK-OUT OF SYSTEMS AND EQUIPMENT SHALL BE DONE BY + • AT DIRECTIOOF 7-ELEVEN REPRESENTATIVE ONLY. CONTRACTOR SHALL NOT START OR ACTIVATE ANY EQUIPMENT WITHOUT THE
<br />SPECIFIC DIRECTIVE OFREPRESENTATIVE. DAMAGE TO ANY 7-ELEVEN EQUIPMENT DUE TO IMPROPER
<br />INSTALLATION AND/OR UNAUTHORIZED STARTUP WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
<br />5.4 SITE COMPLETION: ALL SITE WORK, INCLUDING CONCRETE/ASPHALT PAVEMENTS, SHALL BE COMPLETE. ALL UTILITIES
<br />SHALL BE CONNECTED AND OPERATIONAL. ALL LANDSCAPING, INCLUDING SPRINKLER SYSTEMS, SHALL BE
<br />5.5 VERIFICATION: PRIOR TO SCHEDULING OF STARTUP, CONTRACTOR SHALL OBSERVE AND VERIFY CORRECTNESS AND
<br />COMPLIANCE TO 7-ELEVEN'S DRAWINGS AND SPECIFICATIONS FOR THE FOLLOWING, BUT THESE SHALL NOT COMPRISE
<br />TWE TOTlkL LIMIT OF THE CONTRACTOR'S VERIFICATION:
<br />5.5.1 MANHOLES SHALL BE PROPERLY CENTER/INSTALLED AT OVERFILLS, SUBMERSIBLES, VAPOR
<br />RECOVERY, AUTO GAUGING, OBSERVATION WELLS AND SUMP/RISER.
<br />5.5.2 PROPER HEIGHT OF GRAVEL BACK FILL AROUND SUMP/RISERS.
<br />5.5.3 TANK I.D. MARKERS INSTALLED IN CONCRETE AT PROPER LOCATIONS.
<br />m
<br />00
<br />r_jo
<br />L
<br />�w
<br />nz
<br />uCD
<br />�
<br />? Q
<br />of
<br />n C:)
<br />11 INSPECTIONS /TESTING -CONTINUEDICONTINUED
<br />-SECTION
<br />4-
<br />PART 5 - STARTUP INSPECTION - CONTINUED
<br />PART 3 - EXECUTION
<br />5.5.4 ALL BRASS GOODS AND FITTINGS PROPERLY INSTALLED, TIGHT AND SECURE.
<br />3.1 PROTECTIONS: PROVIDE ADEQUATE SHORING, BRACING, PILING AND CRIBBING. COMPLY WITH ALL OSHA AND LOCAL
<br />REGULATIONS AS IT PERTAINS TO SAFETY.
<br />5.5.5 LEAK DETECTORS INSTALLED.
<br />3.2 LAYOUT: CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT AS PRESENTED IN PERMITTED PLANS AND SPECIFICATIONS.
<br />5.5.6 PROTECTED FLEX CONNECTORS ARE PROPERLY INSTALLED WITHOUT TWIST IN INSTALLATION.
<br />1
<br />3.3 EXCAVATION. EXCAVATE TO LINES, ELEVATIONS AND LIMITS REQUIRED BY THE DRAWINGS, PLUS SUFFICIENT DISTANCE
<br />5.5.7 MANHOLE EXTENDERS PROPERLY INSTALLED AND SCREWED IN FRAME OF MANHOLE SUMP/RISERS,
<br />AND SPACE TO PERMIT INSTALLATION OF TANKS. EXCAVATE AS REQUIRED, REGARDLESS OF TYPE, CONDITION OR
<br />PROPERLY SET AND SEALED TO TANK MAN WAY OR FITTINGS AND CLEANED OUT FREE OF DEBRIS AND
<br />MOISTURE CONTENT OF THE MATERIAL ENCOUNTERED. HAUL EXCESS MATERIAL OFF THE SITE AND DISPOSE OF SAME.
<br />CONCRETE.
<br />DIMENSIONS OF TANK EXCAVATION SHALL BE MINIMAL AS ESTABLISHED BY 7-ELEVEN DRAWINGS UNLESS TANK
<br />MANUFACTURER REQUIREMENTS ARE GREATER. IF EXCAVATION MATERIAL IS FROM AN EXISTING GASOLINE FACILITY ALL
<br />5.5.8 TANKS CLEAN AND FREE OF WATER. PRIOR TO PRODUCT FILL, TANKS ARE TO BE CHECKED FOR ANY
<br />MATERIALS MUST BE TESTED PRIOR TO REMOVAL:
<br />DEBRIS AND WATER. ANY EVIDENCE OF BOTH, TANKS ARE TO BE CLEANED AND WATER REMOVED.
<br />Prot® 11-05�1
<br />3.4 SAW CUTTING: IF PAVING MUST BE REMOVED, THE PERIMETER OF THE TANK EXCAVATION AND ALL TRENCHES SHALL BE
<br />5.5.9 ISLAND FORM INNER BOXES PROPERLY CLEANED OUT FREE OF DEBRIS AND CONCRETE.
<br />CUT WITH A CONCRETE SAW. NOTE: PAVING TO BE CUT 2' BEYOND EDGES OF EXCAVATIONS IN ALL DIRECTIONS IN ORDER
<br />TO GIVE PROPER SUPPORT TO NEW SLAB TO AVOID SETTLING.
<br />5.5.10 DISPENSERS PROPERLY SET AND SECURED TO ISLAND BOX FRAME AND DISPENSER SUMPS PROPERLY
<br />CLEANED OUT FREE OF DEBRIS AND CONCRETE.
<br />3.5 HAZARDOUS MATERIAL: SHOULD ROCK, WATER OR OTHER HAZARDOUS MATERIALS NOT SHOWN ON SOILS TEST BE
<br />ENCOUNTERED, LOCAL CONSTRUCTION OFFICE SITE MANAGER SHALL BE IMMEDIATELY CONTACTED FOR APPROVAL TO
<br />5.5.11 SHEAR VALVES SECURED TO FRAME WITH PROPER HARDWARE.
<br />PROCEED.
<br />5.5.12 PHASE II VAPOR RECOVERY LINES STUBBED UP AND SECURED IN PROPER LOCATION.
<br />3.6 PROTECTION: CONTRACTOR SHALL PROVIDE SUFFICIENT PROTECTION WITH EARTHEN BERMS AT ALL TIMES TO PROTECT
<br />U)
<br />TANK EXCAVATION AND TRENCHES FROM DRAINAGE OF SURFACE WATERS. EXCAVATIONS SHALL BE PROPERLY MARKED,
<br />co z
<br />5.513 ELECTRICAL CONDUITS SECURED WITH ALL CONNECTIONS COMPLETED. VERIFY COMPLIANCE WITH
<br />PROTECTED AND BARRICADED FOR SAFETY UNTIL BACK FILL IS COMPLETE AND SURFACING FINISHED.
<br />w
<br />REQUIREMENTS FOR ISOLATED GROUND WIRING TO JUNCTION BOX CASING.
<br />3.7 SHORING: CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING REQUIREMENTS FOR SHORING AND PROVIDING
<br />5.5.14 DISPENSER CANOPIES INSTALLED AND LIFTING LUGS REMOVED WITH PROPER PLUGS INSERTED.
<br />SHORING, SHOULD SITE AND/OR SOIL CONDITIONS WARRANT SHORING. REFERENCE SOIL REPORT FOR CONDITIONS
<br />> _
<br />'
<br />WARRANTING SPECIAL REQUIREMENTS.
<br />I®� L�
<br />5.5.15 ALL NOZZLES AND SWIVELS AVAILABLE ON -SITE, INSTALLED PRIOR ONLY IF REQUIRED BY GOVERNING
<br />o
<br />AUTHORITIES FOR INSPECTION PURPOSES.
<br />3.8 FILLING AND BACK FILLING: PLACE APPROVED FILL MATERIAL IN STRICT ACCORDANCE WITH TANK AND PIPING
<br />-
<br />o �
<br />MANUFACTURER'S SPECIFICATIONS. PROVIDE A 12" BED OF APPROVED BACK FILL OVER BOTTOM OF EXCAVATION PRIOR
<br />® n III
<br />5.5.16 ALL INSPECTIONS BY GOVERNING AUTHORITIES COMPLETED AND SIGNED. SIGNED AND COMPLETED
<br />TO TANK PLACEMENT. BACK FILL SHALL BE PLACED AND COMPACTED IN MAXIMUM 12" LIFTS.
<br />W w > Q W
<br />PERMIT CARD ON SITE.
<br />w7rw
<br />3.9 CLEANUP: CLEAN UP ALL DEBRIS CAUSED BY WORK OF THIS SECTION, KEEPING PREMISES CLEAN AND NEAT AT ALL TIMES.
<br />5.5.17 ELECTRICAL DEVICES INCLUDING LIGHTS, SIGNS AND INTERCOMS PROPERLY INSTALLED, SECURED AND
<br />9 wI W LOW
<br />PLUMB.
<br />o LIB
<br />5.5.18 ANY WIRING INSPECTION PORTS IN CANOPY COLUMNS COVERED WITH ACCEPTABLE PLATES.
<br />7r
<br />5.5.19 VENT LINES PROPERLY SECURED, PROTECTED AND INSTALLED AT PROPER HEIGHT.
<br />SECTION IV TANK INSTALLATION
<br />0
<br />N
<br />5.5.20 VERIFICATION OF COMPLIANCE FOR TANK AND LINE TEST AVAILABLE ON SITE.
<br />co
<br />5.5.21 ALL MANHOLES FREE OF CONCRETE AND DEBRIS.
<br />PART 1 - GENERAL
<br />5.5.22 MANHOLE COVERS PROPERLY PAINTED.
<br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND RELATED
<br />5.5.23 ALL PAINTING COMPLETE INCLUDING CANOPY, DOWN SPOUTS, METALS AND MISCELLANEOUS METALS.
<br />APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL TO THE INSTALLATION OF FUEL STORAGE
<br />TANKS.
<br />�I
<br />5.5.24 CONCRETE AT ISLANDS AND TANK PAD TRUE, PROPERLY SLOPED AND FINISHED WITH ACCEPTABLE RISE
<br />TO MANHOLES.PART
<br />2 - PRODUCTS
<br />5.5.25 ELECTRICAL PANELS PROPERLY COMPLETED TO INCLUDE:
<br />2.1 TANKS: SHALL BE DESIGNED AND MANUFACTURED SO AS TO BE CORROSION PROTECTED PER EPA REQUIREMENTS.
<br />(A) ONE BREAKER FOR EACH SUBMERSIBLE PUMP, DISPENSER, CONSOLE AUTO GAUGING, DISPENSER LIGHTS
<br />APPROVED TANKS SHALL BE:
<br />h....
<br />(ALL) AND CANOPY LIGHTS (ALL).
<br />2.1.1 DOUBLE WALL FIBERGLASS TANKS
<br />(B) GAS PANEL CONTROLLED BY A MAIN BREAKER.
<br />2.2 HOLD DOWN STRAPS: SHALL BE SUPPLIED BY TANK MANUFACTURER ONLY. FIELD FABRICATED UNITS ARE NOT
<br />(C) CONTROL BOXES AND DISTRIBUTION BOXES INSTALLED AND WIRED.
<br />ACCEPTABLE.
<br />gmg
<br />mS ,ZD
<br />(D) INTERCOM INSTALLATION COMPLETE AND PROPERLY WORKING.PART
<br />3 INSTALLATION
<br />l p
<br />(E) ALL APPLICABLE CONSOLE INSTALLATION COMPLETE AND FUNCTIONAL.�___
<br />\
<br />3.1 MANUFACTURING: REFER TO TANK MANUFACTURER'S CRITERIA AND SPECIFICATIONS FOR TANK INSTALLATION AND
<br />\1
<br />(F) ALL WIRING PROPERLY IDENTIFIED WITH COLOR CODEDWIRING.
<br />ADHERE TO AS REQUIRED.���
<br />�
<br />a ��ft ,
<br />aN F
<br />(G) CONDUITS PROPERLY IDENTIFIED. (H) ALL BREAKERS IN "OFF" POSITION.
<br />3.2 CLEARANCES: MINIMUM CLEARANCE FOR TANKS SHALL BE AS FOLLOWS: SHOULD REQUIREMENTS OF TANK
<br />� '
<br />MANUFACTURER OR SOIL CONDITIONS DICTATE GREATER CLEARANCE., ADHERE TO ACCORDINGLY.
<br />NMIz
<br />5.6 NOTIFICATION: CONTRACTOR SHALL VERIFY ITEMS AS INDICATED ABOVE PRIOR TO SCHEDULING OF STARTUP
<br />3.2.1 BOTTOM: PROVIDE MINIMUM OF 12" BEDDING MATERIAL BETWEEN BOTTOM OF EXCAVATION OR PAD
<br />{.
<br />s
<br />MONIES AND/OR TIME LOST AT STARTUP DUE TO NOCOMPLIANCE SHALL BE CHARGED TO CONTRACTOR
<br />ACCORDINGLY.
<br />AND BOTTOM OF TANK.
<br />,
<br />5.7 EQUIPMENT SHALL BE TESTED PER SPECIFICATIONS ON SHEET G17.0.
<br />3.2.2 SIDES: PROVIDE MINIMUM OF 2'0" BETWEEN TANKS AND T FROM SIDE/END OF TANK TO WALL OF
<br />EXCAVATION.Nu
<br />s' � o
<br />o
<br />"'all
<br />5.8 CLEANUP: CLEANUP ALL DEBRIS CAUSED BY WORK OF THIS SECTION, KEEPING PREMISES CLEAN AND NEAT AT
<br />I N
<br />ALL TIMES.
<br />3.2.3 TOP: PROVIDE 42" FILL MATERIAL OVER TANK PLUS 8'° OF CONCRETE
<br />®���
<br />3.3 TESTING: PRIOR TO INSTALLATION OF TANKS, TESTING PER MANUFACTURER'S INSTRUCTIONS SHALL BE PERFORMED ON
<br />SECTION III EARTHWORK
<br />TANK(S). ON DUAL WALL TANKS, CONSULT TANK MANUFACTURER FOR TESTING CRITERIA.
<br />w
<br />3.4 PLACEMENT:
<br />co
<br />co
<br />Cam! 0 CA
<br />PART 1 ® GENERAL
<br />3.4.1 REFER TO SITE PLAN FOR TANK PLACEMENT AND PRODUCT ROTATION.
<br />' Z N
<br />w U�
<br />3.4.2 PRIOR TO SETTING OF TANKS, REMOVE ALL FOREIGN DEBRIS, ROCKS, CLODS, GARBAGE, ETC. FROM
<br />I
<br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND APPLIANCES
<br />EXCAVATION.
<br />REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL TO EARTHWORK.
<br />3.4.3 PLACE TANKS ONLY ON APPROVED FILL. DO NOT SET ON CONCRETE OR WOOD.
<br />® a)
<br />f�
<br />® PRODUCTS
<br />3.4.4 NOT USED.
<br />� (�
<br />3.4.5 TANKS SHALL BE BURIED TO MINIMUM DEPTH AS PER ABOVE AND AS SHOWN ON FUELING
<br />P � �
<br />2.1 FILL MATERIAL: SHALL BE MATERIAL IN COMPLIANCE WITH TANK AND PIPING MANUFACTURER'S SPECIFICATIONS.
<br />DRAWINGS. TANKS MAY REQUIRE GREATER BURIAL DEPTH IF INSTALLED IN REMOTE POSITION TO
<br />cu (a ® E
<br />U) t
<br />ALLOW FOR PROPER SLOPE ON VENT LINES,VAPOR LINES, SECONDARY CONTAINMENT PRODUCT
<br />>, ®�
<br />.� ® � a `F 0 ®�;
<br />2.1.1 PEA GRAVEL: SHALL BE CLEAN, NATURALLY ROUNDED AGGREGATE WITH A MIX OF PARTICLE SIZE
<br />LINES. VERIFY DEPTH AS REQUIRED. (IF BURIAL DEPTH EXCEEDS 5'-0" (60"), NOTIFY 7-ELEVEN
<br />®� �' 0 n �� wO �
<br />NOT LESS THAN 1/8 OR MORE THAN 3/4 .
<br />MANAGER)
<br />���������m�®
<br />2.1.2 STONE OR GRAVEL CRUSHING: SHALL BE WASHED MATERIAL WITH ANGULAR PARTICLE SIZE NOT
<br />� 8 � �2 ®.2: w-0
<br />� ®� a r- o r °'
<br />LESS THAN 1/8" OR MORE THAN 1/2".
<br />� C 2 2 0 � F
<br />a)®
<br />0 )
<br />a05
<br />2.1.3 BACKFILL OR OTHER MATERIAL MUST BE APPROVED BY TANK MANUFACTURER.
<br />0)
<br />a)®�
<br />NOTE: MATERIALS MUST MEET ASTM C-33 PARAGRAPH 7.1 FOR QUALITY AND SOUNDNESS. FILL MATERIAL
<br />SHALL NOT HAVE MORE THAN 3% PASSING A #8 SIEVE. DRY GRAVEL DENSITY MUST BE A MINIMUMfX
<br />OF 95 POUNDS PER CUBIC FOOT.Ji