Laserfiche WebLink
t 3. f` k- <br />t�L.x <br />t i' • <br />} i ■y rr ■' � � rl�. <br />r r R t + x <br />• • • • • <br />■ :+ <br />■ •' r <br />4 : <br />x ■. <br />r <br />• +r • I 1 I <br />i ! 1 lr } ■ <br />1. REQUESTS FOR SUBSTITUTIONS MUST BE SUBMITTED TO THE CM BY THE GC. <br />SUBCONTRACTORS ARE NOT TO SUBMIT TO THE CM DIRECTLY. <br />2, THE REQUEST FOR SUBSTITUTION MUST BE ACCOMPANIED BY A COMPLETE <br />DESCRIPTION OF THE PROPOSED EQUIPMENT AND/OR MATERIAL SUCH AS CUT <br />SHEETS OR SAMPLES TO ENABLE THE CM TO MAKE A THOROUGH COMPARISON WITH <br />THE SPECIFIED ITEM, <br />3, THE CM WILL, UPON SUCH REQUEST, EVALUATE THE PROPOSED SUBSTITUTION CAN <br />THE BASIS OF ADVERTISED TECHNICAL PERFORMANCE, SUITABILITY, SIZE, OR OTHER <br />CONSIDERATIONS AND INFORM THE GC OF HIS/HER DECISION. <br />4. IN ORDER TO FACILITATE THE EVALUATION PROCESS, THE GC SHOULD SUBMIT <br />DOCUMENTATION TO SUPPORT THE PROPOSED SUBSTITUTION ON THE BASIS OF <br />WARRANTIES, COST DIFFERENCE, AND EXPECTED SERVICE LIFE AS COMPARED TO <br />THE SPECIFIED EQUIPMENT. PROCUREMENT TIME WILL NOT NORMALLY BE <br />CONSIDERED AS JUSTIFICATION FOR SUBSTITUTION REQUESTS. IN THE EVENT OF <br />PROCUREMENT TIME BEING THE FACTOR, THE GC SHALL PROVIDE THE CM WITH THE <br />SPECIFIC INFORMATION ALLOWING THE CM TO EXPLORE THE DELAY AND TO ATTEMPT <br />TO RESOLVE THE PROBLEM WITH A SUBSTITUTION. <br />5. ONLY AFTER THE CM ACCEPTS AND PROVIDES WRITTEN APPROVAL, WILL THE GC <br />ASSUME AUTHORITY TO PROCEED WITH THE PROPOSED SUBSTITUTION, <br />rt r • 1 / `• • r'r <br />tf t 1. • <br />1 r <br />j • i. <br />I• ` 1� 1� t I � r � �� <br />i ! � • i i <br />• r■ • <br />•1f •1 •' r • ri ` • t 1 • <br />■ • • <br />i 1 '' 1 i • i •: i. • <br />�r <br />■ r <br />r <br />i' <br />• r • <br />• r <br />• i i • • • <br />' it i • • <br />r� a • r} <br />► ■ � ■■ , • • r r r <br />r <br />■ lr 1 } •' i <br />I <br />p, <br />s' <br />I, d` [t 9 <br />{ I a F r r t :' •` x <br />CHANGES IN THE WORK MAY BE ACCOMPLISHED AFTER EXECUTION OF THE <br />CONTRACT, AND WITHOUT INVALIDATING THE CONTRACT, BY CHANGE ORDER, <br />CONSTRUCTION CHANGE DIRECTIVE OR ORDER FOR A MINOR CHANGE IN THE WORK. <br />EACH CONTRACTOR OR SUB CONTRACTOR SHALL REVIEW THE EQUIPMENT SCHEDULE <br />FOR ITEMS AFFECTING HIS PORTION OF THE WORK. HE SHALL INCLUDE IN HIS <br />PROPOSAL ANY AND ALL LABOR OR MATERIAL AS REQUIRED TO PROVIDE THE <br />COMPLETE PROJECT. <br />• THE GC IS TO BE FAMILIAR WITH ALL LANDLORD CRITERIA,S C SPECIAL WORKING <br />CONDITIONS PERTAINING TO BARRICADES NOISE DUST TRASH REMOVAL ETC. <br />COORDINATE WITH THE LANDLORD,0 ANY WORK WHICH IS REQUIRED TO TAKE PLACE <br />AT NIGHT OR DURING OFF HOURS SHALL BE VERIFIED WITH THE LANDLORD, AND ITS <br />COST TO BE INCLUDED IN THE BID. THE CONTRACTOR I RA R S TO PROVIDE SECURITY <br />GUARD DURING OFF HOURS WORK FOR REMODELS ONLY. <br />® WITHIN FIVE (5) DAYS OF THE AWARD OF THE CONTRACT THE GC SHALL PROVIDE THE <br />CM WITH A PROPOSED SCHEDULE INDICATING THE START AND COMPLETION DATES <br />OF EACH STAGE OF THE WORK BY TRADE, AT THE SAME TIME THE CONTRACTOR <br />SHALL ALSO SUBMIT TO THE CM DOCUMENTATION INDICATING ORDERING AND <br />DELIVERY DATES OF CRITICAL ITEMS. ANY REQUESTS FOR ADDITIONAL TIME MUST BE <br />SUBMITTED IN WRITING AND HAVE THE CM'S WRITTEN AUTHORIZATION <br />• THE CONTRACTOR SHALL MAINTAIN AT THE SITE A SET OF REPRODUCIBLE AND <br />SP <br />ECIFICATIONS THAT SHALL BE UPDATED AS WORK PROGRESSES INDICATING ANY <br />CHANGES DEVIATION OR ALTERATIONS AND SHALL BECOM <br />E RECORD" DRAWINGS TO <br />BE TURNED OVER TO VPI AT THE COMPLETION OF THE WOR <br />K, <br />® THE CONTRACTOR SHALL DILIGENTLY PROSECUTE THE WORK TO COMPLETION AND <br />SHALL AT ALL TIME GIVE HIS PERSONAL SUPERVISION AND ATTENTION THERE TO AND <br />MAINTAIN A COMPETENT SUPERINTENDENT AND NECESSARY FOREMAN TO ACT FOR <br />HIM, PROVIDE SUFFICIENT AND SATISFACTORY FORCES REQUIRED TO WORK TO <br />ENSURE THE PROSECUTION OF THE WORK IN COMPLETION TO MEET AGREED UPON <br />TURN OVER DATE NEGLECT OR FAILURE TO FURNISHFORCES <br />SUCH R CES OR MEET <br />r r <br />REQUIRED DATES SHALL BE GROUNDS OF TERMINATION 0 TAGREEMENT, I F HETHE CM <br />AT HIS/HER OPTION MAY FURNISH ADDITIONAL FORCES AT THE CONTRACTORS <br />EXPENSE TO MEET THE SCHEDULE AND COMPLETION DATE AND/OR WITH LEGAL <br />NOTICE RECOVER DAMAGES ARISING FROM SUCH DELAYS, INCLUDING BUT NOT <br />LIMITED TO RENT CHARGES. <br />THE WORK SHALL BE LAID OUT FROM DIMENSIONS SHOWN ON THE DRAWINGS ONLY. <br />DO NOT SCALE THE DRAWINGS. THE CONTRACTOR SHALL WORK FROM THE MOST <br />RECENT DRAWINGS SUPPLIED BY THE DESIGN DEPARTMENT. WORK SHALL BE <br />PERFORMED BASED UPON LANDLORD AND CITY APPROVED PLANS ONLY AFTER <br />WRITTEN DIRECTION BY THE CM. <br />® VERIFY ALL LINES LEVELS INTERFERENCES FIELD DIMENSIONS AND CONDITIONS <br />WITH THE DRAWINGS AND REPORT ANY ERRORS OMISSIONS OR DISCREPANCIES TO <br />THE CM PRIOR TO COMMENCING WORK. THE GC IS TO REPORT TO THE CM ANY <br />VARIANCES OR FIELD CONDITIONS THAT MAY CAUSE CONSTRUCTION PROBLEMS <br />PRIOR TO COMMENCING WORK, FAILURE TO REPORT TO THE CM FOR <br />INTERPRETATION SUCH CONDITIONS OR COVERING OVER A CONDITION WH <br />ICH <br />SUBSEQUENTLY CAUSES ANY DELAY OR ADDITIONAL COST SHALL BE THE <br />RESPONSIBILITY OF THE CONTRACTOR WHO SHALL BE HELD FOR ANY DAMAGES <br />RESULTING THERE FROM. <br />® ANY CONFLICT BETWEEN DETAIL, DIMENSION, MATERIAL OR SPECIFICATION IS TO BE <br />ADDRESSED TO THE CM FOR INTERPRETATION. ANY SUCH CONFLICT NOT SO <br />RESOLVED AND CORRECTION IS LATER REQUIRED SHALL BE AT THE CONTRACTORS <br />EXPENSE. <br />• THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS LAYOUT AND FOR THAT OF HIS <br />SUB -TRADES. ALL DIMENSIONS INDICATED AS HOLD DIMENSIONS SHALL BE <br />MAINTAINED. ANY VARIANCES FROM THESE WILL BE AT THE RISK OF THAT TRADE OR <br />CONTRACTOR. VERIFY ANY EQUIPMENT CLEARANCES PRIOR TO LAYOUT, HE SHALL BE <br />HELD RESPONSIBLE FOR ANY DAMAGE TO OR ADDITIONAL COST FOR FAILURE TO DO <br />SUCH LAYOUT. PRIOR TO COMMENCEMENT OF CONSTRUCTION THE CONTRACTOR <br />SHALL VERIFY ALL OVERALL DIMENSIONS, COLUMN LOCATIONS AND REPORT THESE <br />TO THE CM. THE CONTRACTOR SHALL COORDINATE THE WORK OF HIS FORCES WITH <br />SUB -TRADES, LANDLORD AND VPI, ANY FAILURE TO PROPERLY COORDINATE WHICH <br />RESULTS IN ADDITIONAL COST INCLUDING ANY DEMOLITION OF CONSTRUCTION IN <br />PLACE SHALL BE BOURNE BY THE CONTRACTOR. <br />• ALL MATERIALS SPECIFIED IS TO BE INSTALLED IN ACCORDANCE WITH <br />MANUFACTURES INSTRUCTIONS AND SPECIFICATIONS, GC IS TO CONSTRUCT THE <br />PROJECT IN ACCORDANCE WITH THE DOCUMENTS. VPI AND IT'S REPRESENTATIVES <br />ARE THE SOLE INTERPRETER, ARBITER OF THE DOCUMENTS. ANY DEVIATION FROM <br />THE INTENT OF THE DOCUMENTS, WITHOUT THE CM'S APPROVAL IS AT THE <br />CONTRACTOR'S OWN RISK AND MAY RESULT IN CORRECTION AT THE CONTRACTOR'S <br />EXPENSE (MATERIALS AND LABOR). <br />WORK BY VPI <br />AT THE VPI'S REQUEST, SOME OR ALL OF THE EXISTING EQUIPMENT OR FIXTURES <br />MAY BE SAVED AND REUSED AT THIS LOCATION. ANY STORAGE UNITS (SEA <br />CONTAINERS OR PODS) THAT ARE REQUIRED FOR AN OPEN REMODEL WILL BE <br />PROVIDED BY VPI. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE DE -INSTALL AND <br />RE -INSTALL OF ALL ITEMS THAT ARE TO BE REUSED. <br />ALL FIXTURES AND FURNITURE WILL BE SUPPLIED BY VPI. THE CONTRACTOR IS TO BE <br />ON SITE ON DATE OF DELIVERY TO INSTALL ALL FIXTURES AND FURNITURE UNLESS <br />OTHER WISE INSTRUCTED BY THE CM. <br />® THE CONTRACTOR SHALL REVIEW WITH THE OWNER ALL ITEMS TO BE REUSED FROM <br />AN EXISTING STORE AND/OR SUPPLIED BY OWNER. THE CONTRACTOR AGREES TO <br />INSTALL OR REINSTALL SAME. <br />" THE GC SHALL REVIEW DOCUMENTS TO DETERMINE THE EXTENT OF ITEMS SUPPLIED <br />BY THE OWNER. <br />r + • r <br />• •+� ^i it `: ; • I •' " xi <br />r .:.� ■1- j � . Ar � 1 <br />t E y t' <br />p <br />G <br />•I. I ,:t <br />+ <br />I i ., • 1 iir j: <br />• ',r R r • <br />• w I I I I <br />+ ■ <br />y • - I <br />'r r <br />} i l i ' ' • 1 <br />.r } ■r �■ � �■.•r <br />r <br />• j r } � I I <br />P' 2 <br />4� <br />�4 <br />CONTINUUM, <br />E <br />r •; , r j+i •r j I <br />I <br />•' '. — �. • it ', lb � R'.. <br />■ •I <br />r r <br />R} M • <br />r ■I■ r <br />+ r r ■ 1 r } R <br />■ • r ' <br />• ■ <br />lallawalm <br />� �! 1• '; r l � r I • I • <br />I I <br />} }r ■ ^ ■ Ai i-x <br />• r � •, r <br />• -x i, •• irY <br />• : <br />rr } } } rr } ��+• i <br />• <br />, • •r <br />1 <br />$ i4\Vt C�Js\'� l\�ILNLGVS\7 �!\A1 ,'fl$ix►TJnC•itlrXlkl\F <br />x „ r r xl I rl ■ ^ <br />• ! r I I <br />-t, , <br />• <br />i <br />+" L it •■ I■ • <br />t, <br />r r: <br />I I <br />xr • 1, x •li �:' <br />r <br />• 1 • 1 r }■ <br />w <br />. r <br />i 1 } • « r I + ,i <br />+' t } ■ } <br />MUN <br />1■ rj <br />r I � � ■ I �+ <br />■ <br />} } I I <br />• i <br />1 <br />r� r rr <br />■ r r <br />• <br />I <br />i • r w■ r <br />• • ri <br />TEMPERED GLASS <br />PROVIDE TEMPERED GLASS WHERE INDICATED ON THE DRAWINGS. FOR TEMPERED <br />PLATE GLASS USE TYPE 1, CLASS ONE(1), QUALITY 93. <br />PRIOR TO TEMPERING CUT GLASS TO REQUIRED SIZES AS DETERMINED BY ACCURATE <br />FIELD DIMENSIONS. <br />® PROCESS ALL EDGES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS <br />OR AS INDICATED ON THE DRAWINGS. ALL EXPOSED EDGES SHALL BE GROUND AND <br />POLISHED; NO EXCEPTIONS, PRIOR TO TEMPERING. DO NOT CUT OR TREAT EDGES IN <br />THE FIELD. <br />I� 3 I 10 ICI 1 i, I.. <br />:t <br />a;qqM1119*114101 <br />1' •� �, r <br />_ Nal <br />1 <br />r ■ <br />1 : } <br />i t <br />■�. r•.'. 1; is • '^ I'•.! <br />, ■} <br />■ <br />Ik ;. <br />t • • <br />r y : ■ !r:. . <br />• • • + i • <br />• ' it ' � r <br />I i <br />r <br />' i ! • r ! L l <br />'! � i, �! I• a. <br />• <br />PAINT <br />ADEQUATELY PROTECT OTHER SURFACES FROM PAINT AND DAMAGE. REPAIR <br />DAMAGE AS RESULTS OF INADEQUATE OR UNSUITABLE PROTECTION. <br />REMOVE ELECTRICAL PLATES, SURFACE HARDWARE, FITTINGS, AND FASTENINGS <br />PRIOR TO PAINTING <br />N OPERATIONS. THESE ITEMS ARE TO BE CAREFULLY STORED, <br />CLEANED, AND REPLACED ON COMPLETION OF WORK IN EACH AREA. DO NOT CLEAN <br />HARDWARE BY USING A SOLVENT THAT MAY REMOVE PERMANENT LACQUER FINISH. <br />ACCEPTABLE MANUFACTURER: SHERWIN WILLIAMS <br />® THOROUGHLY EXAMINE SURFACES SCHEDULED TO BE PAINTED PRIOR TO <br />COMMENCEMENT OF WORK. REPORT IN WRITING TO THE CONSTRUCTION MANAGER <br />ANY CONDITION THAT MAY POTENTIALLY AFFECT PROPER APPLICATION. DO NOT <br />COMMENCE WORK UNTIL DEFECTS EFECTS HAVE BEEN CORRECTED. <br />® CORRECT DEFECTS AND DEFICIENCIES IN SURFACES WHICH MAY ADVERSELY AFFECT <br />WORK OF THIS SECTION. <br />REMOVE MILDEW BY SCRUBBING WITH A SOLUTION OF TRI-SODIUM PHOSPHATE AND <br />BLEACH, RINSE WITH CLEAN WATER AND ALLOW SURFACE TO DRY COMPLETELY, <br />® REMOVE CONTAMINATION FROM GYPSUM WALLBOARD SURFACES AND PRIME TO <br />SHOW DEFECTS, IF ANY. PAINT AFTER DEFECTS HAVE BEEN REMEDIED. <br />• REMOVE SURFACE CONTAMINATION AND OILS FROM GALVANIZED SURFACES AND <br />WITH SOLVENT. APPLY COAT OF ETCHING TYPE PRIMER, <br />APPLY EACH COAT AT PROPER CONSISTENCY. <br />® APPLY MINIMUM MIL. THICKNESS OF <br />EACH COAT OF PRIMER AND EACH COAT OF <br />FINISH IN ACCORDANCE WITH THE MANUFACTURERS SPECIFIC RECOMMENDATIONS <br />FOR THE TYPE OF PRIMER OR FINISH BEING APPLIED; THE SURFACE RECEIVING THE <br />PRIMER OR FINISH; AND THE TYPE OF APPLICATION, WHETHER BRUSH, TOLLER, OR <br />SPRAY. <br />• ALLOW EACH COAT OF FINISH TO BEFORE DRY B R E RE ANOTHER COAT IS APPLIED. <br />PAINT BOTH SIDES AND EDGES OF PLYWOOD BACKERBOARDS FOR ELECTRICAL <br />EQUIPMENT BEFORE INSTALLING BACKBOARDS AND MOUNTING EQUIPMENT ON THEM. <br />AS WORK PROCEEDS AND UPON COMPLETION, PROMPTLY REMOVE PAINT WHERE <br />SPILLED, SPLASHED, OR SPATTERED. <br />DURING THE PROGRESSION OF WORK, KEEP PREMISES FREE FROM ANY <br />UNNECESSARY ACCUMULATION OF TOOLS, EQUIPMENT, SURPLUS MATERIALS, AND <br />DEBRIS. <br />® UPON COMPLETION OF WORK, LEAVE PREMISES NEAT AND CLEAN; TO THE <br />SATISFACTION OF THE CONSTRUCTION MANAGER. <br />GYPSUM WALLBOARD SYSTEMS <br />® PERFORM GYPSUM WALLBOARD SYSTEMS WORK IN ACCORDANCE WITH <br />RECOMMENDATIONS OF ASTM C754 AND GA-216 UNLESS OTHERWISE SPECIFIED IN <br />THIS SECTION. <br />m GA-216 - RECOMMENDED SPECIFICATIONS FOR THE APPLICATION AND FINISHING OF <br />GYPSUM BOARD. <br />® ASTM C754 - INSTALLATION OF STEEL FRAMING MEMBERS TO RECEIVE SCREW - <br />ATTACHED GYPSUM WALLBOARD, BACKING BOARD, OR WATER RESISTANT BACKING <br />BOARD. <br />PROVIDE METAL FRAMING MATERIALS IN ACCORDANCE WITH GA 216. <br />® STUDS: SCREW -TYPE CEE-SHAPED MINIMUM 20 GAUGE. <br />RUNNERS: MARCH STUDS <br />® FURRING MEMBERS: SCREW -TYPE HAT -SHAPED 20 GAUGE <br />• PROVIDE CHANNELS AND HANGERS WIRE IN ACCORDANCE WITH GA 216. <br />® FASTENERS AND ANCHORAGES IN ACCORDANCE WITH GA 216. <br />PROVIDE GYPSUM WALLBOARD MATERIALS IN ACCORDANCE WITH <br />RECOMMENDATIONS OF GA 216. <br />STANDARD GYPSUM BOARDS SHALL BE 5/8" THICK USING MAXIMUM PERMISSIBLE <br />LENGTH(S) ENDS SQUARE CUT, TAPERED EDGES. <br />® MOISTURE RESISTANT GYPSUM BOARD (GREEN BOARD) SHALL BE 5/8°THICK USING <br />MAXIMUM PERMISSIBLE LENGTH(S) ENDS SQUARE CUT TAPERED EDGES. <br />FIRE -RATED GYPSUM BOARDS SHALL BE UL RATED, 5/8" THICK TYPE-"X" MAXIMUM <br />PERMISSIBLE LENGTH(S) ENDS SQUARE. <br />AGGREGATE PORTLAND CEMENT BOARD, 112" THICK, WITH POLYMER -COATED, <br />WOVEN -GLASS MESH IN BACK AND FRONT SURFACES. <br />PROVIDE GYPSUM WALLBOARD ACCESSORIES IN ACCORDANCE WITH GA 216. <br />CORNER BEADS SHALL BE METAL. <br />® PROVIDE REINFORCING TAPE, JOINT COMPOUND, ADHESIVE, WATER FASTENERS IN <br />ACCORDANCE WITH GA 2% <br />® INSTALL MEMBERS TRUE TO LINES AND LEVELS TO PROVIDE SURFACE FLATNESS <br />WITH MAXIMUM VARIATION OF 1/8" IN 10 FEET (11960) IN ANY DIRECTION. <br />• METAL SUDS SHALL BE 16" ON CENTER UNLESS OTHERWISE INDICATED. <br />• PARTITION HEIGHTS SHALL BE AS INDICATED ON THE DRAWINGS. <br />® INSTALL DOUBLE STUDS AT DOOR. FRAME JAMS. INSTALL RUNNERS ON EACH SIDE OF <br />THE OPENING AT FRAME HEAD HEIGHT BETWEEN JAMB AND STUDS AND ADJACENT <br />STUDS. <br />• INSTALL BLOCKING BEHIND DRYWALL FOR SUPPORT OF PLUMBING FIXTURES, WALL <br />CABINETS TOILET ACCESSORIES, HARDWARE, AND ELSEWHERE AS REQUIRED. <br />• COORDINATE INSTALLATION OF BUCKS, ANCHORS, BLOCKING ELECTRICAL, AND <br />MECHANICAL WORK WHICH IS TO BE PLACED IN OR BEHIND PARTITION FRAMING. <br />ALLOW SUCH ITEMS TO BE INSTALLED AFTER FRAMING IS COMPLETE. <br />• ERECT WALL FURRING DIRECTLY ATTACHED TO CONCRETE BLOCK AND CONCRETE <br />WALLS. <br />SPACE FURRING CHANNELS MAXIMUM 16" ON CENTER, NOT MORE THAN 4" FROM <br />FLOOR AND CEILING LINES, <br />" ERECT SINGLE LAYER STANDARD GYPSUM BOARD IN DIRECTION MIOST PRACTICAL <br />AND ECONOMICAL, WITH ENDS AND EDGES OCCURRING OVER FIRM BEARING. <br />® ERECT SINGLE LAYER FIRS -RATED GYPSUM BOARD VERTICALLY, WITH EDGES AND <br />ENDS OCCURRING OVER FIRM BEARING. <br />USE SCREWS WHEN FASTENING GYPSUM BOARD TO METAL FURRING OR FRAMING. <br />ALL WALLS ARE TO BE SKIMMED TO A PAINTABLE SURFACE. <br />• PLACE CORNER BEADS AT EXTERNAL CORNERS. USE LONGEST PRACTICAL LENGTHS. <br />PLACE EDGE TRIM WHERE GYPSUM BOARD ABUTS DISSIMILAR MATERIALS. <br />TAPE, FILL, AND SAND EXPOSED JOINTS, EDGES, CORNERS, OPENINGS AND FIXTURES, <br />TO PRODUCE SURFACE READY TO RECEIVE SURFACE FINISHES, FEATHER COATS <br />ONTO ADJOINING SURFACES SO THAT CAMBER IS MAXIMUM 1132". FINISHING OF <br />TAPING IS NOT REQUIRED ABOVE CEILING LINE. <br />REMOVE AND RE -DO DEFECTIVE WORK. <br />•' ! i' 1 x 1 • } <br />FIXTURES <br />• ALL FIXTURES ARE PROVIDED BY VPI AND INSTALLED BY CONTRACTOR. <br />• CONTRACTOR TO ENSURE THAT ANY TRADES NEEDED DURING FIXTURE <br />INSTALLATION ARE ON SITE THE DAY OF FIXTURE DELIVERY. <br />aEN,URE THATROUGHED- INOP KINGSBUI _IN ANCHORAGES AND REINFORCING <br />REQUIREDINSTALLATION OF WORK OS THIS SECTION ARE CORRECTLY <br />FOR PROPER <br />SIZED, INSTALLED, AND LOCATED. <br />• SET ALL CASEWORK ITEMS PLUMB, SQUARE, AND TRUE, SECURELY ANCHORED TO <br />BUILDING STRUCTURE WHERE REQUIRED, <br />INSTALL ITEMS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND SHOP <br />DRAWINGS BY WORKERS SKILLED AND FAMILIAR WITH CASEWORK INSTALLATION. <br />INSTALL BASE AROUND THE BASE OF ALL FIXTURES. <br />® ADJUST DOORS, DRAWERS, HARDWARE FIXTURES, AND OTHER MOVING OPERATING <br />PARTS TO FUNCTION SMOOTHLY AND CORRECTLY. <br />DEEP CLEAN CASEWORK, COUNTERTOPS, SHELVES, HARDWARE, FITTINGS AND <br />FIXTURES. <br />FIRE SPRINKLER SYSTEM (WHERE APPLICABLE <br />MODIFY EXISTING BUILDING SPRINKLER SYSTEM WITH ALARM SYSTEM TO <br />LOCAL CODES, INCLUDING FIRE ALARM CONTROL PANEL(FACP) IF REQUIRED <br />BY GOVERNING AGENCIES. <br />CONTRACTOR IS TO PRODUCE ALL REQUIRED DOCUMENTS AND SUBMIT <br />THEM TO ALL REQUIRED AGENCIES FOR APPROVAL. PAYING ALL FEES AND <br />PERMITS. <br />EIMSiO 16 - ELECTRICAL <br />FIRE ALARM SYSTEM (WHERE APPLICABLE) <br />DESIGN FURNISH AND INSTALL COMPLETE FIRE ALARM SYSTEM AS <br />REQUIRED BY LOCAL CODES. <br />CONTRACTOR IS TO PRODUCE ALL REQUIRED DOCUMENTS AND SUBMIT <br />THEM TO ALL REQUIRED AGENCIES FOR APPROVAL, PAYING ALL FEES AND <br />PERMITS. <br />BURGLAR ALARM SYSTEM (WHERE !APPLICABLE) <br />• FURNISH AND INSTALL COMPLETE BURGLAR ALARM SYSTEM AS REQUIRED <br />BY LOCAL CODES. <br />VPI'S BURGLAR ALARM SUB TO PRODUCE ALL REQUIRED DOCUMENTS AND <br />SUBMIT THEM TO ALL REQUIRED AGENCIES FOR APPROVAL, PAYING ALL <br />FEES AND PERMITS. <br />7- <br />OWNER <br />VISIONWORKS <br />175 E HOUSTON STREET <br />SAN ANTONIO TX 78205 <br />PROJECT <br />VISIONWORKS #1407 - GREENTREE PLAZA <br />305 SE EVERETT MALL WAY, SUITE 21 <br />EVERETT, WA 98208 <br />a i i <br />,w a <br />n.. <br />�t <br />CONTACT <br />0.716.884.0059 <br />F,716.884.6414 <br />SCHEIDAIA.COM <br />t• t <br />SEAL/SIGNATURE <br />1-1 REGISTERED <br />ARCHITECT <br />This drawing is copyrighted under the United States Copy Right Law and is the property <br />of Scheid Architectural, the use of this drawing in any form without written permission is <br />strictly prohibited. <br />SHEET TITLE <br />IN�,"I'll <br />rr � <br />C��°�L�t <br />REVIFAIED GO R PERMIT <br />PROJECT NUMBER <br />2021-067 <br />PLOT DATE O <br />9/1/2021 3:50:47 PM <br />SHEET <br />