1.
<br />THE WORK SHALL CONFORM TO THE APPLICABLE BUILDING CODE AND OTHER
<br />20.
<br />CONTRACTOR AND SUBCONTRACTORS SHALL ATTEND JOB MEETINGS
<br />ORDINANCES, CODES AND REGULATIONS LISTED IN THE SPECIFICATIONS OR
<br />REQUIRED BY THIS CONTRACT.
<br />ON THE DRAWINGS, AND REQUIRED BY LOCAL BUILDING AUTHORITIES. THE
<br />21.
<br />THE CONTRACTOR. SHALL OBTAIN ALL PERMITS FOR ALL SITE DEVELOPMENT
<br />GOVERNING CODES, RULES AND REGULATIONS ARE COLLECTIVELY REFERRED
<br />WORK, PAY ALL FEES FOR PERMITS AND CHECK ALL GOVERNING
<br />TO AS "THE CODE." THE CONTRACT OR SHALL REPORT ANY INCONSISTENCIES,
<br />AUTHORITIES' SPECIFICATIONS FOR BUT NOT LIMITED TO, GU! fERS,
<br />CONFLICTS OR OMISSIONS DISCOVERED TO THE ARCHITECT FOR
<br />SIDEWALKS, POLES, AND OTHER. STRUCTURES, INCLUDING THE REMOVAL OR
<br />INTERPRETATION PRIOR TO PERFORMING THE WORK.
<br />RELOCATION OF EXISTING UTILITIES OR OTHER PHYSICAL OBJECTS SHOWN
<br />2.
<br />THE GENERAL CONTRACTOR SHALL CONTACT BUILDING MANAGEMENT TO
<br />ON PLANS OR NOTED OTHERWISE.
<br />DETERMINE THE RULES OF THE BUILDING RELATIVE TO CONSTRUCTION; WHEN
<br />22.
<br />CREATE AND IMPLEMENT AN EROSION AND SEDIMENTATION CONTROL PLAN
<br />AND HOW DELIVERIES CAN BE MADE, WHAT PHASES AND TYPES OF
<br />FOR ALL SITE CONSTRUCTION ACTIVITIES ASSOCIATED WITH THE PROJECT.
<br />CONSTRUCTION MAY BE DONE ON REGULAR OR OVERTIME BASIS, AND IN
<br />THE PLAN MUST CONFORM TO THE EROSION AND SEDIMENTATION
<br />GENERAL ANY SPECIAL BUILDING REQUIREMENTS WHICH WILL AFFECT THE
<br />REQUIREMENTS OF THE 2003 EPA CONSTRUCTION GENERAL PERMIT OR
<br />COST OF ALL WORK BORNE BY THE GENERAL CONTRACTOR. ALL WORK SHALL
<br />LOCAL STANDARDS AND CODES, WHICHEVER IS MORE STRINGENT.
<br />CONFORM TO ALL BASE BUILDING STANDARD SPECIFICATIONS AND BUILDING
<br />23.
<br />ALL REQUIRED PERMITS MUST BE OBTAINED FROM THE FIRE DEPARTMENT
<br />REGULATIONS, WHICH THE CONTRACTOR SHALL OBTAIN PRIOR TO
<br />PRIOR TO S T ART OF CONS T RUCTION.
<br />SUBMISSION OF BID.
<br />24,
<br />ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE RESPONSIBILITY
<br />3,
<br />THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUB-
<br />OF THE CONTRACTOR, LINO
<br />CONTRACTORS' RECEIPT OF COMPLETE SETS OF THESE DOCUMENTS, AS WELL
<br />25,
<br />THE CONTRACTOR SHALL PAY THE EXPENSES FOR ALL TRANSPORTATION,
<br />AS ALL FUTURE ADDENDA, BULLETINS, FIELD DIRECTIVES AND CHANGE
<br />HOISTING AND ELEVATOR USE CHARGES ON ALL MATERIALS OR EQUIPMENT
<br />ORDERS,
<br />TO THE POINT OF USE, AND SHALL BE RESPONSIBLE FOR ALL UNLOADING,
<br />4.
<br />THE AIA STANDARD DOCUMENT "A201" TITLED "GENERAL CONDITIONS OF THE
<br />CHECKING AND STORAGE OF THE SAME IN CONNECTION WITH THIS
<br />CONTRACT FOR CONSTRUCTION" SHALL BE CONSIDERED PART OF THE
<br />CONTRACT
<br />GENERAL CONDITIONS OF THIS WORK,
<br />26.
<br />OF THE INEVITABLE WASTE THAT IS GENERATED, AS MANY OF THE WASTE
<br />5.
<br />THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING MANAGEMENT
<br />MAT ERIALS AS ECONOMICALLY FEASIBLE SHALL BE REUSED, SALVAGED, OR
<br />THE STORAGE OF MATERIALS AND SHALL PROVIDE PROTECTION AS NECESSARY
<br />RECYCLED. WASTE DISPOSAL IN LANDFILLS SHALL BE MINIMIZED.
<br />TO PREVENT VANDALISM AND LOSS OF MATERIALS BY THEF T OR DAMAGE
<br />CONTRACTOR SHALL COORDINA T E WASTE MATERIALS HANDLING AND
<br />SUSTAINED DUE TO EXPOSURE TO INAPPROPRIATE ENVIRONMENTAL
<br />SEPARATION FOR ALL TRADES. CONTRACTOR SHALL PROVIDE SEPARATION,
<br />CONDITIONS AND WILL REPAIR & REPLACE DAMAGE OR LOSSES AT THE
<br />HANDLING, TRANSPORTATION, RECYCLING, SALVAGE, AND LANDFILLING FOR
<br />I
<br />CONTRACTOR'S EXPENSE WITHOUT CHARGE TO THE OWNER,
<br />ALL DEMOLITION AND WASTE MATERIALS. RECYCLABLE MATERIALS CAN BE
<br />6.
<br />WHERE ADJACENT AREAS BEYOND THE IMMEDIATE CONSTRUCTION AREA WILL
<br />COMMINGLED IN DUMPS TERS ON -SITE AS LONG AS PROVISION IS MADE FOR
<br />BE OCCUPIED DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL:
<br />HAULING TO A TRANSFER STATION WHERE SEPARATION WILL OCCUR,
<br />A, CONFORM TO OWNERS AND TENANT REQUIREMENTS FOR HOURS OF
<br />TRANSFER S T ATION MUST PROVIDE DOCUMENTATION REPORT T YPES OF
<br />CONSTRUCTION OPERATIONS, ACCESS TO TENANT SPACES AND
<br />MATERIALS SEPARATED BY LOAD AND PERCENTAGE OF EACH LOAD, FINAL
<br />ALLOWABLE NOISE LEVEL DURING TENANT BUSINESS HOURS
<br />DESTINATION OF SORTED MATERIALS MUST ALSO BE REPORTED.
<br />B, CONSTRUCTION OPERATIONS SHALL NOT BLOCK HALLWAYS ACCESSIBLE
<br />ROUTES OR MEANS OF EGRESS FOR TENANTS OF BUILDING.
<br />DIVERSION GOALS: A MINIMUM 75% OF TOTAL PROJECT WASTE SHALL BE
<br />C. CONSTRUCTION OPERATIONS SHALL NOT CAUSE INTERRUPTIONS OF
<br />DIVERTED FROM LANDFILL. THE FOLLOWING WASTE CATEGORIES, AT A
<br />ELECTRICAL SERVICES TO THE TENANTS OF THE BUILDING WIT HOUT
<br />MINIMUM, SHALL BE DIVERTED FROM LANDFILL.
<br />PRIOR NOTIFICATION AND APPROVALS. PROPERLY PROTECT ALL
<br />FLOORS, MAIL CHUTES AND STAIR DOORS IN PUBLIC AREAS SUBJECT
<br />a. NISI
<br />a. CLEAN DIMENSIONED WOOD, PALLET WOOD
<br />WOOD PALLET
<br />TO CONSTRUCTION TRAFFIC. SHOE WIPING MATS WILL BE INSTALLED
<br />b.PLYWOOD, AND
<br />AT ALL OPENINGS BETWEEN CONSTRUCTION AREAS AND ALL PUBLIC
<br />c. CONCRETE
<br />SPACES. ALL ACTIVE AREAS SHALL BE KEPT CLEAN AND FREE FROM
<br />d, CARDBOARD, PAPER, PACKAGING
<br />DEBRIS.
<br />e. METALS
<br />D, ERECT AND MAINTAIN TEMPORARY BRACING, LIGHTS, DUSTPROOF
<br />f. GYPSUM DRYWALL (UNPAINTED)
<br />PARTITIONS, BARRICADES, FENCES AND WARNING SIGNS AS
<br />9• ACOUSTIC TILE
<br />NECESSARY TO PREVENT INJURY, NOISE, DUST AND INCONVENIENCE
<br />h. PAINT
<br />TO OTHER TENANTS, THE PUBLIC, AND TO PREVENT DAMAGE TO
<br />i. GLASS
<br />ADJACENT CONSTRUCTION WHICH IS TO BE LEFT IN PLACE,
<br />I• PLASTICS
<br />E. CONTRACTOR SHALL FOLLOW THE RECOMMENDED CONTROL
<br />k. CARPET AND PAD
<br />MEASURES OF THE SHEET METAL AND AIR CONDITIONING NAT IONAL
<br />i• BEVERAGE CONTAINERS
<br />CONTRACTORS ASSOCIATION (SMACNA) IAQ GUIDELINES FOR
<br />27.
<br />THE CONTRACTOR. SHALL MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY
<br />OCCUPIED BUILDINGS UNDER CONSTRUCTION, 2ND EDITION 2007,
<br />ALL COSTS FOR TEMPORARY WATER, PLUMBING, POWER LIGHTING
<br />ANSI/SMACNA 008-2008 (CHAPTER 3). PROTECT STORED ON -SITE
<br />HEATING OR VENTILATION REQUIRED TO PROPERLY CONDUCT THE WORK.
<br />AND INSTALLED ABSORPTIVE MATERIALS FROM MOISTURE DAMAGE.
<br />F. IF PERMANENTLY INSTALLED AIR HANDLERS ARE USED DURING
<br />28
<br />DO NOT SCALE THESE DRAWINGS; WRITTEN DIMENSIONS SHALL GOVERN.
<br />CONSTRUCTION, FILTRATION MEDIA WITH A MINIMUM EFFICIENCY
<br />SHOULD ANY DIMENSIONAL DISCREPANCIES BE ENCOUNTERED,
<br />REPORTING VALUE (MERV) OF 8 MUST BE USED AT EACH RETURN AIR
<br />CLARIFICATIONS SHALL BE OBTAINED FROM THE OFFICE OF THE ARCHITECT.
<br />GRILLE.
<br />29.
<br />LARGE SCALE DETAILS SHALL GOVERN OVER SMALLER. SCALE PLANS AND
<br />7,
<br />ALL CUTTING, CHASING, DRILLING OR DEMOLITION OF WALLS, SLABS, ETC.
<br />ELEVATIONS.
<br />REQUIRING THE USE OF JACKHAMMERS OR OTHER HEAVY HAND OR POWER
<br />30.
<br />INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURERS'
<br />TOOLS SHALL BE PERFORMED AFTER REGULAR BUSINESS HOURS ON AN
<br />RECOMMENDATIONS, ANY DIFFICULTIES ARE TO BE REPORTED TO THE
<br />OVERTIME BASIS IF NECESSARY, UNLESS THE BUILDING MANAGEMENT AND
<br />ARCHITECT IMMEDIATELY.
<br />ANY AFFECTED TENANTS PROVIDE A WRITTEN WAIVER EXPRESSLY PERMITTING
<br />31.
<br />THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL WARRANTEE ALL
<br />OTHERWISE.
<br />WORK PERFORMED BY HIM DIRECTLY FOR A MINIMUM PERIOD OF ONE (1)
<br />8.
<br />THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR
<br />YEAR AS SPECIFIED IN THE CONSTRUCTION CONTRACT. ALL DEFECTS
<br />JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS
<br />OCCURRING IN THE GUARANTEED PERIOD SHALL BE CORRECTED AT NO
<br />PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS
<br />ADDITIONAL COST.
<br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO
<br />32,
<br />THE CLIENT, DESIGNER, CONSULTANTS AND ALL INSPECTORS FROM
<br />NORMAL WORKING HOURS. THE CONTRACTOR. SHALL PROVIDE PUBLIC
<br />PERTINENT AGENCIES SHALL BE PERMITTED ACCESS TO THE JOB SITE AT ALL
<br />PROTECTION, AS NECESSARY AND REQUIRED BY GOVERNING AGENCIES
<br />TIMES DURING NORMAL WORKING HOURS.
<br />HAVING JURISDICTION, UNTIL CLIENT ACCEPTANCE OF THE PREMISES,
<br />33,
<br />THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
<br />9.
<br />THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PROVISION
<br />EQUIPMENT NECESSARY TO EXECUTE ALL WORK, EXCEPT WHERE NOTED AS
<br />AND MAINTENANCE OF ALL BRACING, SHORING, ENCLOSURES, BARRIERS OR
<br />NOT IN CONTRACT (N.I.C,).
<br />SCAFFOLDING REQUIRED TO PROVIDE A SAFE WORKING ENVIRONMENT AS
<br />34,
<br />MINOR DETAILS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER
<br />DICTATED BY SITE CONDITIONS AND THE PROGRESS OF WORK.
<br />CONSTRUCTION OF ANY PART OF THE WORK, SHALL BE INCLUDED AS IF THEY
<br />10.
<br />DURING THE ENTIRE CONS T RUCTION PERIOD, ALL EXITS, EXIT LIGHTING,
<br />WERE INDICATED IN THE DRAWINGS, UNLESS OTHERWISE AGREED UPON,
<br />FIRE PROTECTION DEVICES AND ALARMS SHALL CONTINUOUSLY
<br />WHERE THE CONTRACT, CONSTRUCTION NOTES OR DRAWINGS CALL FOR ANY
<br />MAINTAINED IN CONFORMANCE I LOCAL BUILDING CODE AND OTHER
<br />WORK OF A MORE STRINGENT NATURE THAN THAT REQUIRED BY THE
<br />GOVERNING ENTITY REQUIREMENTS. UNO, ALL EXISTING, SERVICES AND
<br />BUILDING CODE, OR ANY OTHER ENTI T HAVING JURISDICTION OVER THE
<br />Y
<br />DEVICES SHALL REMAIN ACTIVE,
<br />WORK, THE WORK OF THE MORE STRINGENT NATURE CALLED SHALL BE
<br />FURNISHED IN ALL CASES.
<br />11.
<br />THE CONTRACTOR SHALL PROTECT THE PROPERTY OF THE CLIENT AND THE
<br />35,
<br />FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH
<br />BUILDING OWNER. INCLUDING, BUT IS NOT LIMITED TO, WINDOWS, FLOOR
<br />MA I ERIALS WHICH YIELD THE HIGHEST PERCENT OF PRE -CONSUMER (POST -
<br />AND CEILING FINISHES, PUBLIC TOILETS, ELEVATORS, DOORS & BUCKS,
<br />INDUSTRIAL) AND POST -CONSUMER RECYCLED CONTENT, THE CONTRACTOR
<br />ELECTRICAL AND AIR-CONDITIONING EQUIPMENT, THE CONTRACTOR SHALL
<br />SHALL FURNISH THESE MATERIALS WITHIN THE PARAMETERS OF THE BUDGET
<br />PROTECT ADJOINING PROPER-1 Y. DAMAGE CAUSED BY THE CONTRACTOR'S
<br />AND SHALL NOT PURCHASE ANY COST -ADDING MATERIAL OR PAY A PREMIUM
<br />WORK OR WORKMEN MUST BE MADE GOOD, IN A TIMELY FASHION,
<br />(MORE THAN FAIR MARKET VALUE) WITHOUT PROJECT MANAGER AND OWNER
<br />PATCHING AND REPLACEMENT OF DAMAGED WORK SHALL BE PERFORMED AT
<br />ACKNOWLEDGEMENT AND APPROVAL.
<br />THE COST OF THE CONTRACTOR.THE CONTRACTOR SHALL BE FULLY
<br />36.
<br />FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH
<br />RESPONSIBLE FOR ALL SUB -CONTRACTORS. IF THE CONTRACTOR FAILS TO
<br />MATERIALS MANUFACTURED WITHIN A 500 MILE RADIUS OF THE PROJECT
<br />COMPLETE THE REPAIRS IN A TIMELY FASHION, SAID REPAIRS WILL BE MADE
<br />SITE WHERE AVAILABLE, WITHIN BUDGET, WITHIN FAIR MARKET VALUE AND
<br />BY A CONTRACTOR SELECTED BY THE OWNER'S REPRESENTATIVE AND BACK
<br />DO NOT PRESENT RISK TO THE PROJECT SCHEDULE.
<br />CHARGED ACCORDINGLY.
<br />12.
<br />THE CONTRACTOR SHALL INDEMNIFY AND SAVE HARMLESS THE LANDLORD,
<br />37.
<br />FOR ALL NEW WOOD PRODUCTS INCLUDING BUT NOT LIMITED TO PARTICLE
<br />THE TENANT, AND DESIGNER AGAINST ANY AND ALL CLAIMS AND DEMANDS
<br />BOARD, MDF, PLYWOOD, OSB AND WOOD DOORS, THE CONTRACTOR, SHALL
<br />FOR THE DAMAGE TO THE PROPERTY OF ANY PERSON, FIRM OR INDIVIDUAL
<br />FURNISH MAT ERIALS THAT CONTAIN NO ADDED UREA-FORMADALHYDE.
<br />OR FOR PERSONAL INJURIES (INCLUDING DEATH) ARISING OUT OF, OR
<br />38.
<br />DETAILS AILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN. MINOR
<br />SUFFERED WHILE ENGAGED IN, OR CAUSED, IN WHOLE OR IN PART, BY THE
<br />MODIFICA IIONS MAY BE REQUIRED TO SUITE FIELD CONDITIONS,
<br />EXECUTION OF THE WORK; THE CONTRACTOR SHALL WELL AND TRULY
<br />REQUIRED MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK.
<br />DEFEND THE LANDLORD, TENANT AND DESIGNER AND SHALL PAY ALL
<br />39.
<br />ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER BY MECHANICS
<br />MONIES AWARDED FOR SUCH DAMAGES OR INJURIES (INCLUDING DEATH), ALL
<br />AND TRADESPERSONS SKILLED IN THEIR RESPECTIVE TRADES AND IN
<br />COSTS INCLUDING ATTORNEY'S FEES SUSTAINED, AND SHALL OBTAIN A FULL
<br />ACCORDANCE WITH THE BEST TRADE PRACTICES,
<br />ACQUAINTANCE AND RELEASE IN FAVOR. OF THE LANDLORD, TENANT AND
<br />40.
<br />THE CONTRACTOR SHALL CONFIRM THE AVAILABILITY AND DELIVERY TIMES
<br />DESIGNER, UNLESS SUCH LIABILITY RESULTS SOLELY FROM THE NEGLIGENCE
<br />FOR ALL SPECIFIED MA I ERIALS & EQUIPMENT REQUIRED TO PERFORM THE
<br />OF THE LANDLORD, TENANT, DESIGNER, ITS AGENTS OR EMPLOYEES.
<br />WORK UPON RECEIPT OF THE CONTRCC T DOCUMENTS. SHOULD THE
<br />13.
<br />THE DESIGNER. SHALL NOT BE HELD RESPONSIBLE FOR THE PERFORMANCE OF
<br />AVAILABILITY OF SPECIFIED ITEMS POSE A DELAY TO THE ON -TIME
<br />ANY WORK, NOR FOR THE MEANS AND METHODS OF CONSTRUCTION CHOSEN
<br />COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL NOTIFY THE
<br />BY THE CONTRACTOR OR ANY SUB -CONTRACTORS, NOR SHALL THE DESIGNER
<br />DESIGNER IMMEDIATELY AND PROPOSE AN EQUIVALENT SUBSTITUTION TO
<br />GUARANTEE THE PERFORMANCE OF THEIR CONTRACTS.
<br />BE REVIEWED BY THE ARCHITECT IF SUCH A DELAY IS NOT ACCEPTABLE.
<br />14.
<br />THE CONTRACTOR SHALL PERFORM DAILY CLEANING OF THE JOB SITE
<br />41.
<br />SUBSTITUTION OF ALL EQUALS SHALL BE ONLY AS APPROVED BY THE
<br />DUPING THE CONSTRUCTION PERIOD AND SHALL PROTECT FINISHED WORK
<br />DESIGNER. WHERE THE TERM "OR EQUAL" IS USED THE DESIGNER SHALL
<br />FROM DAMAGE. IMMEDIATELY PRIOR TO TENANT OCCUPANCY, THE
<br />BE THE SOLE JUDGE OF EQUALITY BASED UPON THE INFORMATION
<br />CONTRACTOR SHALL PERFORM FINAL CLEANING OF THE WORK AREA
<br />FURNISHED BY THE CONTRACTOR, SUBSTITUTIONS MUST BE ACCEPTED IN
<br />INCLUDING, BUT NOT LIMITED TO, WET WIPING OF FURNITURE, AND
<br />WRITING BEFORE THEY MAY BE USED.
<br />CASEWORK, WASHING AND WAXING OF VCT FLOORING; AND THE VACUUMING
<br />42.
<br />THE CONTRACTOR SHALL PREPARE SUBMITTALS FOR REVIEW BY THE
<br />OF CARPET, ALL CLEANING SHALL BE IN ACCORDANCE WIT H
<br />DESIGNER, FOR ALL MATERIALS AND EQUIPMENT SPECIFIED. IF THE
<br />MANUFACTURERS' RECOMMENDATIONS
<br />CONTRACTOR, THE OWNER, OR THE OWNER'S REPRESENTATIVE SUBSTITUTES
<br />15.
<br />THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL
<br />A MATERIAL, METHOD OF ATTACHMENT, REVISES A CONSTRUCTION DETAIL,
<br />SUB -CONTRACTORS AND SHALL PERFORM SUCH MISCELLANEOUS WORK AS
<br />OR IN ANY WAY ALTERS THE WORK SUCH THAT IT NO LONGER CONFORMS TO
<br />MAY BE NECESSARY FOR THEM TO COMPLETE THEIR WORK. IT IS EXPECTED
<br />THESE DOCUMENTS, WITHOUT THE WRITTEN ACCEPTANCE OF THE
<br />THAT THE CONTRACT OR SHALL ALSO CLOSELY COORDINATE THE WORK WITH
<br />ARCHITECT, SUCH ACTION WILL RELIEVE THE DESIGNER OF ANY
<br />THAT OF ALL OTHER VENDORS RETAINED BY THE CLIENT TO ASSURE THAT
<br />RESPONSIBILITY OR LIABILITY INCLUDING, BUT NOT LIMITED TO, AES I HETIC
<br />ALL SCHEDULES ARE MET AND THAT WORK PROCEEDS WITHOUT DELAY.
<br />CONSEQUENCES, SUBSEQUENT FAILURE(S) AND PERSONAL OR PROPERTY
<br />16.
<br />BIDDERS, BEFORE SUBMIT T ING PROPOSALS, SHALL VISIT AND CAREFULLY
<br />DAMAGE ATTRIBUTABLE TO THIS CHANGE.
<br />EXAMINE THE AREA AFFEC T ED BY THE WORK TO FAMILIARIZE THEMSELVES
<br />43.
<br />REVIEW OF A SPECIFIC ITEM SHALL NOT INCLUDE REVIEW OF AN ASSEMBLY
<br />WITH THE EXISTING CONDITIONS AND THE DIFFICULTIES THAT WILL AFFECT
<br />OF WHICH THE ITEM IS A COMPONENT.
<br />THE EXECUTION OF THE WORK, SUBMISSION OF A PROPOSAL WILL BE
<br />44.
<br />SUBMITTALS THAT CONTAIN EXCESSIVE ERRORS OR ARE INCOMPLETE OR
<br />CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE,
<br />INADEQUATE MAY BE RETURNED WITHOUT ACTION, COSTS INCURRED FOR
<br />AND LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR,
<br />THE RESULTANT DELAYS WILL BE THE RESPONSIBILITY OF THE
<br />EQUIPMENT, OR MATERIALS, REQUIRED BECAUSE OF DIFFICULTIES
<br />CONTRACTOR.
<br />ENCOUNTERED WHICH COULD HAVE BEEN REASONABLY FORESEEN HAD SUCH
<br />45.
<br />REVIEW OF SUBM11 I ALS SHALL NOT RELIEVE THE CONTRACTOR OF
<br />AN EXAMINAT ION BEEN MADE. THE GENERAL CONTRACTOR SHALL VERIFY ALL
<br />OBLIGATIONS OR RESPONSIBILITIES FOR DEVIATIONS FROM THE
<br />CONDITIONS AND DIMENSIONS ON THE JOB SITE AND REPORT ANY AND ALL
<br />REQUIREMENTS OF THESE CONTRACT DOCUMENTS, UNLESS THE DESIGNER
<br />DISCREPANCIES AND/OR UNUSUAL CONDITIONS TO THE ARCHITECT PRIOR
<br />IS NOTIFIED AND SPECIFICALLY APPROVES OF, THE DEVIATIONS AT THE
<br />TO FINALIZING BIDS OR COMMENCEMENT OF ANY CONSTRUCTION.
<br />TIME OF SUBMISSION.
<br />17.
<br />THE GENERAL CONTRACTOR SHALL MAKE KNOWN ANY AND ALL LIMITATIONS, IONS,
<br />46.
<br />REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR'S
<br />EXCLUSIONS, OR MODIFICATIONS TO THE PROJECT DURING THE BID
<br />OBLIGATION FOR COORDINATION NOR WAIVE RESPONSIBILITY FOR ERRORS
<br />SELECTIONS PERIOD. ANY AND ALL LIMITATIONS, EXCLUSIONS, OR
<br />AND OMISSIONS IN THE SUBMITTALS, INCLUDING "FIELD MEASURE."
<br />MODIFICATIONS NOT ITEMIZED IN THE BID PROPOSAL DOCUMENTS ARE
<br />47.
<br />CHANGES IN THE SCOPE OF WORK OR IN CONSTRUCTION DETAILS,
<br />PRESUMED "INCLUDED", IN WHICH CASE NO ADDITIONAL MONIES WILL BE
<br />WHETHER DUE TO FIELD CONDITIONS OR OMISSIONS BY THE CONTRACTOR,
<br />ALLOCATED FOR THIS WORK.
<br />ARCHITECT OR OWNER, SHALL BE DOCUMENTED BY THE DESIGNER AND
<br />18,
<br />EXISTING CONSTRUCTION AND DIMENSIONS SHOWN ARE PER EXISTING
<br />APPROVED, PRIOR TO EXECUTION.
<br />DRAWINGS OR SITE VERIFICATION. ALL EXISTING INFORMATION MUST BE
<br />48.
<br />THE PRESENCE OF A REPRESENTATIVE OF THE DESIGNER ON THE JOB SITE
<br />VERIFIED IN THE FIELD. NEITHER THE OWNER NOR THE DESIGNER ARE
<br />DOES NOT IMPLY CONCURRENCE WITH OR THE APPROVAL OF ANY WORK. THE
<br />RESPONSIBLE FOR ACCURACY OF EXISTING INFORMATION. EXISTING
<br />CONTRACTOR SHALL CALL TO THE ATTENTION OF THE DESIGNER, IN
<br />CONSTRUCTION CONDITIONS IN AREAS WHERE NEW WORK IS NOT PLANNED MAY
<br />WRITING, ALL SPECIFIC A T EMS FOR WHICH DESIGNER'S REVIEW IS REQUIRED.
<br />19.
<br />BE NOT COMPLETELY SHOWN.
<br />WITHIN ONE (1) WEEK (5 BUSINESS DAYS), THE THIS
<br />49,
<br />UPON SUBSTANTIAL COMPLETION OF WORK THE CONTRACTOR SHALL
<br />CON T RAT, PRIOR TO MOBILIZATION FOR ANY WORKK,, THE O
<br />HE CONTRACTOR
<br />PREPARE A "PUNCHLIST" OF CORRECTIONS AND UNSATISFACTORY AND/OR
<br />SHALL FURNISH A CONSTRUCTION SCHEDULE SHOWING CHRONOLOGICALLY
<br />INCOMPLETE WORK FOR REVIEW BY THE ARCHITECT.
<br />THE PHASES OF THE WORK, AND ALL RELATED WORK FOR THE COMPLETION OF
<br />THE PROJECT. THIS SCHEDULE SHALL INDICATE ALL ORDERING LEAD TIMES,
<br />LENGTH OF TIME FOR EACH PHASE, ITS START AND COMPLETION, WITH A
<br />PROJECTED COMPLETION DATE.
<br />50. THE CONTRACTOR SHALL MAINTAIN AT THE SITE, ONE RECORD COPY OF ALL
<br />DRAWINGS, PERMIT S, SUBMITTALS AND SAMPLES ON WHICH TO RECORD ALL
<br />CHANGES DURING CONSTRUCTION, ACCESS TO THESE SHALL BE PROVIDED FOR
<br />THE USE OF ALL TRADES, CLIENT REPRESENTATIVES AND THE DESIGNER,
<br />DURING ALL PHASES OF CONSTRUCTION,
<br />51. DURING THE COURSE OF CONSTRUCTION, ACTUAL LOCATIONS SHALL BE
<br />INDICATED TO SCALE IN RED INK ON THE OWNERS RECORD DRAWINGS FOR ALL
<br />RUNS OF MECHANICAL AND ELECTRICAL WORK INCLUDING CONCEALED WORK.
<br />WHICH DEVIA T ES FROM THE DRAWINGS. UPON COMPLETION OF THE PROJECT,
<br />INCLUDING ALL PUNCHLIST ITEMS, THIS INFORMATION SHALL BE NEATLY
<br />TRANSFERRED BY THE CONTRACTOR TO A SET OF DRAWINGS, WHICH SHALL BE
<br />MARKED "AS BUILT SET" AND COPIES SHALL BE PROVIDED TO BOTH THE
<br />OWNER AND THE ARCHITECT. WITHIN THREE (3) WEEKS (15 BUSINESS DAYS)
<br />OF THE RECEIPT OF THE "AS BUILT SET." APPROVAL FOR FINAL PAYMENT TO
<br />THE CONTRACTOR SHALL BE GRANTED OR REASONABLE CAUSE SHOWN WHY
<br />SUCH APPROVAL HAS BEEN DENIED,
<br />52. PRIOR TO THE COMPLETION OF THE WORK, THE CONTRACTOR SHALL
<br />ASSEMBLE AND FURNISH THE CLIENT A COMPLETE SET OF MANUFACTURERS'
<br />CATALOG, OPERATING INSTRUCTIONS, START-UP CHECK LISTS, MAINTENANCE
<br />INSTRUCTIONS AND SIMILAR DATA, AS WELL AS ALL GUARANTEE(S) FOR ALL
<br />EQUIPMENT AND OPERABLE DEVICES FURNISHED OR INSTALLED BY THE
<br />CONTRACTOR UNDER THIS CONTRACT, AND SHALL ORIENT AND INSTRUCT
<br />THE PERSONNEL DESIGNATED BY THE CLIENT IN THE OPERATION OF ALL SUCH
<br />EQUIPMENT.
<br />53. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER IN THE EVENT
<br />THAT MOLD OR ASBESTOS IS UNCOVERED. THE OWNER SHALL RETAIN A
<br />QUALIFIED CONSULTANT WHO SHALL ARRANGE FOR THE PROMPT
<br />IDENTIFICATION, TESTING, TREATMENT, REMEDIATION AND STORAGE OF THE
<br />MOLD OR ASBESTOS AS REQUIRED BY LAW AND GOOD CONSTRUCTION
<br />PRACTICES, THE DESIGNER SHALL BEAR NO RESPONSIBILITY FOR WORK
<br />RELATED TO THESE MATERIALS.
<br />54. THE CONTRACTOR IS ADVISED THAT THE PREMISE HAS NOT BEEN TESTED FOR
<br />LEAD PAINT OR OTHER POTENTIALLY HAZARDOUS MATERIALS, THE
<br />CONTRACTOR SHALL USE ALL APPROPRIATE PRECAUTIONS IN THE CARRYING
<br />OUT OF ALL CONSTRUCTION OPERATIONS WHICH MIGHT DISTURB SUCH
<br />MATERIALS.
<br />55. ALL CONTRACTORS SHALL CARRY PROPERTY DAMAGE AND PUBLIC LIABILITY
<br />INSURANCE AS REQUIRED BY ANY GOVERNING AGENCIES HAVING
<br />JURISDICTION AND COMPLYING WITH STA71 UTORY REQUIREMENTS FOR
<br />DISABILITY AND WORKMEN'S COMPENSATION.
<br />ABBREVIATIONS
<br />A/C
<br />AIR CONDITIONING
<br />A/C UNIT
<br />AIR CONDITIONING UNIT
<br />A/E
<br />ARCHITECT/ENGINEER
<br />A/V
<br />AUDIO VISUAL
<br />ACT
<br />ACOUSTICAL CEILING TILE
<br />AD]
<br />ADJACENT
<br />AFF
<br />ABOVE FINISH FLOOR
<br />AHU
<br />AIR HANDLING UNIT
<br />ALT
<br />Al-TERNA T E(ING)
<br />ALUM
<br />ALUMINUM
<br />ANOD
<br />ANODIZED
<br />APPROX
<br />APPROXIMATE
<br />ARCH
<br />ARCHITECT
<br />AUTO
<br />AUTOMATIC
<br />AVG
<br />AVERAGE
<br />B
<br />BETW
<br />BETWEEN
<br />BEV
<br />BEVELED
<br />BIT
<br />BITUMINOUS
<br />BLDG
<br />BUILDING
<br />BLK
<br />BLOCK
<br />BLKG
<br />BLOCKING
<br />BSMT
<br />BASEMENT
<br />BTM
<br />BOTTOM
<br />BTU
<br />BRITISH THERMAL UNIT
<br />BUR
<br />BUILT UP ROOFING
<br />C
<br />CER
<br />CERAMIC
<br />CF
<br />CUBIC FEET
<br />Cl
<br />CONTROL JOINT
<br />CL
<br />CENTERLINE
<br />CLG
<br />CEILING
<br />CLOS
<br />CLOSET
<br />CLR
<br />CLEAR
<br />CMU
<br />CONCRETE MASONRY UNIT
<br />COL
<br />COLUMN
<br />CONIC
<br />CONCRETE
<br />CONSTR
<br />CONSTRUCTION
<br />CONT
<br />CONTINUNOUS
<br />CONTR
<br />CONTRACTOR
<br />CORR
<br />CORRIDOR
<br />CPT
<br />CARPET
<br />CT
<br />CERAMIC TILE
<br />CTR
<br />CENTER
<br />CU FT
<br />CUBIC FEET
<br />D
<br />D
<br />DEPTH
<br />DBL
<br />DOUBLE
<br />DEG
<br />DEGREES
<br />DEMO
<br />DEMOLITION or DEMOLISH
<br />DEPT
<br />DEPARTMENT
<br />DF
<br />DRINKING FOUNTAIN
<br />DH
<br />DOUBLE HUNG
<br />DIAL
<br />DIAGONAL
<br />DIA,M
<br />DIAMETER
<br />DISP
<br />DISPENSER
<br />DN
<br />DOWN
<br />DR
<br />DOOR(S)
<br />DS
<br />DOWN SPOUT
<br />DTL
<br />DETAIL
<br />DWG
<br />DRAWING
<br />DWR
<br />DRAWER
<br />E
<br />E
<br />FAST
<br />EA
<br />EACH
<br />EF
<br />EXHAUST FAN
<br />EJ
<br />EXPANSION JOIN
<br />ELEC
<br />ELECTRIC(CAL)
<br />ELEV
<br />ELEVATION or ELEVATOR
<br />EMERG
<br />EMERGENCY
<br />ENCL
<br />ENCLOSURE
<br />ENGR
<br />ENGINEER
<br />ENTR
<br />ENTRANCE
<br />EQ
<br />EQUAL
<br />EQUIP
<br />EQUIPMENT
<br />EW
<br />EACH WAY
<br />EWC
<br />ELECTRIC WATER COOLER
<br />EXH
<br />EXHAUST
<br />EXIST
<br />EXISTING
<br />EXP
<br />EXPANSION
<br />EXT
<br />EXTERNAL or EXTERIOR
<br />F
<br />-------------
<br />------------------
<br />FC
<br />FOOT CANDLES
<br />FD
<br />FLOOR DRAIN
<br />FDN
<br />FOUNDATION
<br />FE
<br />FIRE EXTINGUISHER
<br />FEC
<br />FIRE EXTINGUISHER
<br />CABINET
<br />FF
<br />FINISH FLOOR
<br />FHC
<br />FIRE HOSE CABINET
<br />FIG
<br />FIGURE
<br />FIN
<br />FINISH
<br />F1XF
<br />FIXTURE
<br />FLEX
<br />FLEXIBLE
<br />FLOUR
<br />FLOURESCENT
<br />FLR
<br />FLOOR
<br />FP
<br />FIRE PROTECTIONS
<br />FPL
<br />FABRIC PANEL
<br />FRTWD
<br />FIRE RETARDEN T TREATED
<br />WOOD
<br />F i
<br />FOOT or FEET
<br />FURR
<br />FURRING
<br />G
<br />GC
<br />_
<br />GENERAL CONTRACTOR
<br />GEN
<br />GENERAL or GENERATOR
<br />GFI
<br />GROUND FAULT
<br />INTERRUPTER
<br />GL
<br />GLASS or GLAZING
<br />GRD
<br />GROUND
<br />GWB
<br />GYPSUM WALL BOARD
<br />GYP
<br />GYPSUM
<br />H
<br />H
<br />-
<br />HIGH
<br />HB
<br />HOSE BIB
<br />HC
<br />HOLLOW CORE
<br />HDW
<br />HARDWARE
<br />HM
<br />HOLLOW METAL
<br />HORTZ
<br />NORIZON T AL
<br />HR
<br />HOUR
<br />HT
<br />HEIGHT
<br />HVAC
<br />HEATING VENTILATION &
<br />AIR COND.
<br />HW
<br />HOT WATER
<br />HWY
<br />HIGHWAY
<br />I
<br />IN
<br />INCHES
<br />INCAND
<br />INCANDESCENT
<br />INCL
<br />INCLUDE(ING) or
<br />INCLUSIVE
<br />INFO
<br />INFORMATION
<br />INSUL
<br />INSULATION
<br />INT
<br />INTERIOR
<br />INV
<br />INVERT
<br />J
<br />JAN CLOS
<br />JANITOR'S CLOSET
<br />JB
<br />JUNCTION BOX
<br />JST
<br />JOIST
<br />JT
<br />JOINT
<br />K
<br />KD
<br />KNOCK DOWN
<br />KIT
<br />KITCHEN
<br />L
<br />L
<br />LOW
<br />LAM
<br />LAMINATE(D)
<br />LAV
<br />LAVATORY
<br />LF
<br />LINEAR FEET
<br />LL
<br />LIVE LOAD
<br />M HAL
<br />METAL HALIDE
<br />MAINT
<br />MAINTENANCE
<br />MAS
<br />MASONRY
<br />MATL
<br />MATERIAL
<br />MAX
<br />MAXIMUM
<br />MECH
<br />MECHANICAL
<br />MED
<br />MEDIUM
<br />MFR
<br />MANUFACTURER
<br />MIN
<br />MINUMUM
<br />MISC
<br />MISCELLANEOUS
<br />MTG
<br />MOUNTING
<br />MTL
<br />METAL
<br />N
<br />NORTH
<br />N/A
<br />NOT APPLICABLE / NOT
<br />AVAILABLE
<br />NE
<br />NORTHEAST
<br />NEC
<br />NATIONAL ELECTRIC CODE
<br />NEG
<br />NEGATIVE
<br />NIC
<br />NOT IN CONTRACT
<br />NITS
<br />NOT TO SCALE
<br />NW
<br />NORTHWEST
<br />OC
<br />ON CENTER
<br />OCC
<br />OCCUPANCY or OCCUPIED
<br />P
<br />--------------------
<br />PERCENT
<br />PART
<br />PARTIAL
<br />PASS
<br />PASSAGE
<br />PC
<br />PRECAST
<br />PED
<br />PEDESTAL
<br />PL
<br />PLATE or PROPERTY LINE
<br />PLAM
<br />PLASTIC LAMINATE
<br />PLAS
<br />PLASTIC
<br />PLYWD
<br />PLYWOOD
<br />PREFAB
<br />PREFABRICATED
<br />PROJ
<br />PROJECT or PROJECTED
<br />PT
<br />PAINT
<br />PT N
<br />PARTITION
<br />QT
<br />QUARRY TILE
<br />QTY
<br />QUANTITY
<br />R
<br />R-
<br />RB
<br />RUBBER BASE
<br />RBR
<br />RUBBER
<br />RCP
<br />REFLECTED CEILING PLAN
<br />RD
<br />ROAD or ROOD DRAIN
<br />REBAR
<br />REINFORCING BAR
<br />RECEPT
<br />RECEPTACLE
<br />RECT
<br />RECTANGULAR
<br />REF
<br />REFERENCE
<br />REINF
<br />REINFORCING or
<br />REINFORCEMENT
<br />REQ'D
<br />REQUIRED
<br />RET
<br />RETURN
<br />REV
<br />REVISE or REVISION
<br />RM
<br />ROOM
<br />RO
<br />ROUGH OPENING
<br />ROW
<br />RIGHT OF WAY
<br />RPM
<br />REVOLUTIONS PER MINUTE
<br />RSF
<br />RENTABLE SQUARE FEET
<br />RT
<br />RUBBER TILE
<br />RTU
<br />ROOF TOP UNIT
<br />RWC
<br />RAINWATER CONDUCTOR
<br />S
<br />--------------
<br />S
<br />-----------------
<br />SOUTH
<br />SAN
<br />SANITARY
<br />SB
<br />STONE BASE
<br />SC
<br />SOLID CORE
<br />SCHED
<br />SCHEDULE
<br />SCHEM
<br />SCHEMATIC
<br />SE
<br />SOUTHEAST
<br />SECT
<br />SECTION
<br />SF
<br />SQUARE FOOTAGE
<br />SHWR
<br />SHOWER
<br />SIM
<br />SIMILIAR
<br />SPEC
<br />SPECIFICATION(S)
<br />SPKR
<br />SPEAKER
<br />SO
<br />SQUARE
<br />SQ FT
<br />SQUARE FOOT
<br />SSTL
<br />STAINLESS STEEL
<br />ST
<br />STREET
<br />STD
<br />STANDARD
<br />STL
<br />STEEL
<br />STOR
<br />STORAGE
<br />STRUCT
<br />STRUCTURE or
<br />STRUCTURAL
<br />SUSP
<br />SUSPENDED
<br />SW
<br />SOUTHWEST
<br />SYMB
<br />SUMBOL
<br />SYS
<br />SYSTEM
<br />T
<br />T
<br />TREAD(S) or TILE
<br />T&B
<br />TOP & BOTTOM
<br />T&G
<br />TONGUE& GROOVE
<br />T'STAT
<br />THERMOSTAT
<br />TB
<br />TILE BASE
<br />TDB
<br />TO BE DETERMINED
<br />TEL
<br />TELEPHONE
<br />TEMP
<br />TEMPORARY or
<br />TEMPERATURE
<br />TERR
<br />TERRAZZO
<br />THK
<br />THICK
<br />THRES
<br />THRESHOLD
<br />THRU
<br />THROUGH
<br />TOC
<br />TOP OF CONCRETE/CURS
<br />TOS
<br />TOP OF STEEL
<br />TOW
<br />TOP OF WALL
<br />TRANSF
<br />TRANSFORMER
<br />TYP
<br />TYPICAL
<br />UC
<br />UNDERCUT
<br />UL
<br />UNDERWRITER'S
<br />LABORATORY
<br />UNEXCAV
<br />UNEXCAVATED
<br />LINO
<br />UNLESS NOTED
<br />OTHERWISE
<br />UPS
<br />UNINTERRUPTABLE POWER
<br />SUPPLY
<br />UR
<br />URINAL
<br />USF
<br />USABLE SQUARE FOOTAGE
<br />UTIL
<br />UTILITY
<br />V
<br />V
<br />VOLT or VENT
<br />VAP RET
<br />VAPOR RETARDER
<br />VAR
<br />VARIES
<br />VB
<br />VINYL BASE
<br />VCT
<br />VINYL COMPOSITION TILE
<br />VENT
<br />VENTILITATION
<br />VERT
<br />VERTICAL
<br />VEST
<br />VESTIBULE
<br />VIF
<br />VERIFY IN FIELD
<br />VOL
<br />VOLUME
<br />VTR.
<br />VENT THROUGH ROOF
<br />VWC
<br />VINYL WALL COVERING
<br />W
<br />-- - --- -
<br />W
<br />--- - -- ---- - -----
<br />W EST or WATT
<br />W/
<br />WITH
<br />W/0
<br />WITHOUT
<br />WB
<br />WOOD BASE
<br />WC
<br />WATER CLOSET (TOILET)
<br />WD
<br />WOOD (SOFTWOOD)
<br />WF
<br />WIDE FLANGE
<br />WH
<br />WATER HEATER
<br />WP
<br />WATERPROOF
<br />Y_____ _
<br />YD
<br />_ _ __
<br />YARD or YARD DRAIN
<br />NORTH ARROW PHIC SCALE
<br />NORTH PLAN NORTH
<br />0 1 / 2' 1-' 2'
<br />TR[JF NCIRTFi
<br />VEWTICAL ELEVATION
<br />� Level Name
<br />-�O� Elevation
<br />MATCH LINE
<br />02 / A2.1
<br />SHEET NUMBER
<br />DETAIL NUMBER
<br />ROOM NAME AND NUMBER TAG
<br />Room Name
<br />001
<br />FURNITURKA_g_QUIPMENT TAG
<br />li
<br />1ao
<br />TAG NUMBER
<br />ALIGNMENT
<br />NEW CONSTRUCTION TO
<br />ALIGN OR FLUSH WITH
<br />EXISTING CONSTRUCTION
<br />OBJECT STATE
<br />N NEW
<br />R RELOCATED
<br />DOOR NUMBER TAG
<br />SPOT ELEVATION
<br />Level Nam
<br />Elevation
<br />LEADERS
<br />LEADER
<br />AREA LEADER
<br />PARTITION TAG
<br />==I ---
<br />WINDOW TYPE TAG
<br />1t
<br />DRAWING REVISIONS
<br />i REVISION NUMBER
<br />- REVISION DELTA
<br />E EXISTING TO REMAIN
<br />X EXISTING TO BE REMOVED
<br />EXISTING TO BE SALVAGED
<br />BUILDING SECTION TAG
<br />SEC T ION
<br />DESIGNATION
<br />1 1
<br />A7.1 A7.1
<br />SHEET NUMBER
<br />DETAIL/WALL SECTION TAG
<br />SECTION
<br />DESIGNATION
<br />1
<br />A7.1
<br />SHEET NUMBER
<br />EXTERIOR ELEVATION TAG
<br />SECTION
<br />DESIGNATION
<br />1
<br />A7.1
<br />SHEET NUMBER
<br />INTERIOR ELEVATION TAG
<br />1 ELEVATION
<br />DESIGNATION
<br />a A8.1 2
<br />3 SHEET NUMBER
<br />PARTIAL PLAN & DETAIL TAG
<br />PLAN OR DETAIL
<br />DESIGNATION
<br />SIMILAR DETAIL
<br />SHEET NUMBER
<br />-View Name
<br />WALL TYPE LEGEND
<br />NOT IN CONTRACT (NIC)
<br />EXISTING WALL TO REMAIN
<br />NEW WALL
<br />----------
<br />EXISTING WALL TO BE REMOVED
<br />-----------
<br />OVERHEAD SOFFIT/UPPER CABINET
<br />DEMOUNTABLE PARTITION (BY
<br />- �-®
<br />CONTRACTOR)
<br />DEMOUNTABLE PARTITION (Y
<br />®
<br />VENDOR)
<br />��---STOREFRONT
<br />PARTIAL HEIGHT' WALL
<br />RAISED FLOORING
<br />FIKE EXTINGUISHER
<br />FEC SURFACE MOUNTED CABINET
<br />FEC RECESSED CABINET
<br />FE
<br />WALL MOUNTED
<br />s
<br />9
<br />TOILET
<br />URINAL
<br />SINK - COUNTER
<br />MOUNTED
<br />SINK - WALL
<br />MOUNTED
<br />MO -
<br />TILITY SINK
<br />SHOWER
<br />I -LEVEL WATER
<br />COOLER
<br />Cre:�xsted Crane nten.ors
<br />Design Studio
<br />23410 18th Ave. South, Suite
<br />Des Moines, k '
<br />Client Tens
<br />OLYMPiC HOT TUB
<br />Attn: Don Kiting
<br />Tel: 206.409.4849
<br />Email: Don a�0lympicHotTub
<br />Designer:
<br />e
<br />Description: ;
<br />PERMIT SET 02/15/2021
<br />Proj. Na.: 811mOHT_EVERETT
<br />
|