Laserfiche WebLink
1. <br />THE WORK SHALL CONFORM TO THE APPLICABLE BUILDING CODE AND OTHER <br />20. <br />CONTRACTOR AND SUBCONTRACTORS SHALL ATTEND JOB MEETINGS <br />ORDINANCES, CODES AND REGULATIONS LISTED IN THE SPECIFICATIONS OR <br />REQUIRED BY THIS CONTRACT. <br />ON THE DRAWINGS, AND REQUIRED BY LOCAL BUILDING AUTHORITIES. THE <br />21. <br />THE CONTRACTOR. SHALL OBTAIN ALL PERMITS FOR ALL SITE DEVELOPMENT <br />GOVERNING CODES, RULES AND REGULATIONS ARE COLLECTIVELY REFERRED <br />WORK, PAY ALL FEES FOR PERMITS AND CHECK ALL GOVERNING <br />TO AS "THE CODE." THE CONTRACT OR SHALL REPORT ANY INCONSISTENCIES, <br />AUTHORITIES' SPECIFICATIONS FOR BUT NOT LIMITED TO, GU! fERS, <br />CONFLICTS OR OMISSIONS DISCOVERED TO THE ARCHITECT FOR <br />SIDEWALKS, POLES, AND OTHER. STRUCTURES, INCLUDING THE REMOVAL OR <br />INTERPRETATION PRIOR TO PERFORMING THE WORK. <br />RELOCATION OF EXISTING UTILITIES OR OTHER PHYSICAL OBJECTS SHOWN <br />2. <br />THE GENERAL CONTRACTOR SHALL CONTACT BUILDING MANAGEMENT TO <br />ON PLANS OR NOTED OTHERWISE. <br />DETERMINE THE RULES OF THE BUILDING RELATIVE TO CONSTRUCTION; WHEN <br />22. <br />CREATE AND IMPLEMENT AN EROSION AND SEDIMENTATION CONTROL PLAN <br />AND HOW DELIVERIES CAN BE MADE, WHAT PHASES AND TYPES OF <br />FOR ALL SITE CONSTRUCTION ACTIVITIES ASSOCIATED WITH THE PROJECT. <br />CONSTRUCTION MAY BE DONE ON REGULAR OR OVERTIME BASIS, AND IN <br />THE PLAN MUST CONFORM TO THE EROSION AND SEDIMENTATION <br />GENERAL ANY SPECIAL BUILDING REQUIREMENTS WHICH WILL AFFECT THE <br />REQUIREMENTS OF THE 2003 EPA CONSTRUCTION GENERAL PERMIT OR <br />COST OF ALL WORK BORNE BY THE GENERAL CONTRACTOR. ALL WORK SHALL <br />LOCAL STANDARDS AND CODES, WHICHEVER IS MORE STRINGENT. <br />CONFORM TO ALL BASE BUILDING STANDARD SPECIFICATIONS AND BUILDING <br />23. <br />ALL REQUIRED PERMITS MUST BE OBTAINED FROM THE FIRE DEPARTMENT <br />REGULATIONS, WHICH THE CONTRACTOR SHALL OBTAIN PRIOR TO <br />PRIOR TO S T ART OF CONS T RUCTION. <br />SUBMISSION OF BID. <br />24, <br />ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE RESPONSIBILITY <br />3, <br />THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUB- <br />OF THE CONTRACTOR, LINO <br />CONTRACTORS' RECEIPT OF COMPLETE SETS OF THESE DOCUMENTS, AS WELL <br />25, <br />THE CONTRACTOR SHALL PAY THE EXPENSES FOR ALL TRANSPORTATION, <br />AS ALL FUTURE ADDENDA, BULLETINS, FIELD DIRECTIVES AND CHANGE <br />HOISTING AND ELEVATOR USE CHARGES ON ALL MATERIALS OR EQUIPMENT <br />ORDERS, <br />TO THE POINT OF USE, AND SHALL BE RESPONSIBLE FOR ALL UNLOADING, <br />4. <br />THE AIA STANDARD DOCUMENT "A201" TITLED "GENERAL CONDITIONS OF THE <br />CHECKING AND STORAGE OF THE SAME IN CONNECTION WITH THIS <br />CONTRACT FOR CONSTRUCTION" SHALL BE CONSIDERED PART OF THE <br />CONTRACT <br />GENERAL CONDITIONS OF THIS WORK, <br />26. <br />OF THE INEVITABLE WASTE THAT IS GENERATED, AS MANY OF THE WASTE <br />5. <br />THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING MANAGEMENT <br />MAT ERIALS AS ECONOMICALLY FEASIBLE SHALL BE REUSED, SALVAGED, OR <br />THE STORAGE OF MATERIALS AND SHALL PROVIDE PROTECTION AS NECESSARY <br />RECYCLED. WASTE DISPOSAL IN LANDFILLS SHALL BE MINIMIZED. <br />TO PREVENT VANDALISM AND LOSS OF MATERIALS BY THEF T OR DAMAGE <br />CONTRACTOR SHALL COORDINA T E WASTE MATERIALS HANDLING AND <br />SUSTAINED DUE TO EXPOSURE TO INAPPROPRIATE ENVIRONMENTAL <br />SEPARATION FOR ALL TRADES. CONTRACTOR SHALL PROVIDE SEPARATION, <br />CONDITIONS AND WILL REPAIR & REPLACE DAMAGE OR LOSSES AT THE <br />HANDLING, TRANSPORTATION, RECYCLING, SALVAGE, AND LANDFILLING FOR <br />I <br />CONTRACTOR'S EXPENSE WITHOUT CHARGE TO THE OWNER, <br />ALL DEMOLITION AND WASTE MATERIALS. RECYCLABLE MATERIALS CAN BE <br />6. <br />WHERE ADJACENT AREAS BEYOND THE IMMEDIATE CONSTRUCTION AREA WILL <br />COMMINGLED IN DUMPS TERS ON -SITE AS LONG AS PROVISION IS MADE FOR <br />BE OCCUPIED DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL: <br />HAULING TO A TRANSFER STATION WHERE SEPARATION WILL OCCUR, <br />A, CONFORM TO OWNERS AND TENANT REQUIREMENTS FOR HOURS OF <br />TRANSFER S T ATION MUST PROVIDE DOCUMENTATION REPORT T YPES OF <br />CONSTRUCTION OPERATIONS, ACCESS TO TENANT SPACES AND <br />MATERIALS SEPARATED BY LOAD AND PERCENTAGE OF EACH LOAD, FINAL <br />ALLOWABLE NOISE LEVEL DURING TENANT BUSINESS HOURS <br />DESTINATION OF SORTED MATERIALS MUST ALSO BE REPORTED. <br />B, CONSTRUCTION OPERATIONS SHALL NOT BLOCK HALLWAYS ACCESSIBLE <br />ROUTES OR MEANS OF EGRESS FOR TENANTS OF BUILDING. <br />DIVERSION GOALS: A MINIMUM 75% OF TOTAL PROJECT WASTE SHALL BE <br />C. CONSTRUCTION OPERATIONS SHALL NOT CAUSE INTERRUPTIONS OF <br />DIVERTED FROM LANDFILL. THE FOLLOWING WASTE CATEGORIES, AT A <br />ELECTRICAL SERVICES TO THE TENANTS OF THE BUILDING WIT HOUT <br />MINIMUM, SHALL BE DIVERTED FROM LANDFILL. <br />PRIOR NOTIFICATION AND APPROVALS. PROPERLY PROTECT ALL <br />FLOORS, MAIL CHUTES AND STAIR DOORS IN PUBLIC AREAS SUBJECT <br />a. NISI <br />a. CLEAN DIMENSIONED WOOD, PALLET WOOD <br />WOOD PALLET <br />TO CONSTRUCTION TRAFFIC. SHOE WIPING MATS WILL BE INSTALLED <br />b.PLYWOOD, AND <br />AT ALL OPENINGS BETWEEN CONSTRUCTION AREAS AND ALL PUBLIC <br />c. CONCRETE <br />SPACES. ALL ACTIVE AREAS SHALL BE KEPT CLEAN AND FREE FROM <br />d, CARDBOARD, PAPER, PACKAGING <br />DEBRIS. <br />e. METALS <br />D, ERECT AND MAINTAIN TEMPORARY BRACING, LIGHTS, DUSTPROOF <br />f. GYPSUM DRYWALL (UNPAINTED) <br />PARTITIONS, BARRICADES, FENCES AND WARNING SIGNS AS <br />9• ACOUSTIC TILE <br />NECESSARY TO PREVENT INJURY, NOISE, DUST AND INCONVENIENCE <br />h. PAINT <br />TO OTHER TENANTS, THE PUBLIC, AND TO PREVENT DAMAGE TO <br />i. GLASS <br />ADJACENT CONSTRUCTION WHICH IS TO BE LEFT IN PLACE, <br />I• PLASTICS <br />E. CONTRACTOR SHALL FOLLOW THE RECOMMENDED CONTROL <br />k. CARPET AND PAD <br />MEASURES OF THE SHEET METAL AND AIR CONDITIONING NAT IONAL <br />i• BEVERAGE CONTAINERS <br />CONTRACTORS ASSOCIATION (SMACNA) IAQ GUIDELINES FOR <br />27. <br />THE CONTRACTOR. SHALL MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY <br />OCCUPIED BUILDINGS UNDER CONSTRUCTION, 2ND EDITION 2007, <br />ALL COSTS FOR TEMPORARY WATER, PLUMBING, POWER LIGHTING <br />ANSI/SMACNA 008-2008 (CHAPTER 3). PROTECT STORED ON -SITE <br />HEATING OR VENTILATION REQUIRED TO PROPERLY CONDUCT THE WORK. <br />AND INSTALLED ABSORPTIVE MATERIALS FROM MOISTURE DAMAGE. <br />F. IF PERMANENTLY INSTALLED AIR HANDLERS ARE USED DURING <br />28 <br />DO NOT SCALE THESE DRAWINGS; WRITTEN DIMENSIONS SHALL GOVERN. <br />CONSTRUCTION, FILTRATION MEDIA WITH A MINIMUM EFFICIENCY <br />SHOULD ANY DIMENSIONAL DISCREPANCIES BE ENCOUNTERED, <br />REPORTING VALUE (MERV) OF 8 MUST BE USED AT EACH RETURN AIR <br />CLARIFICATIONS SHALL BE OBTAINED FROM THE OFFICE OF THE ARCHITECT. <br />GRILLE. <br />29. <br />LARGE SCALE DETAILS SHALL GOVERN OVER SMALLER. SCALE PLANS AND <br />7, <br />ALL CUTTING, CHASING, DRILLING OR DEMOLITION OF WALLS, SLABS, ETC. <br />ELEVATIONS. <br />REQUIRING THE USE OF JACKHAMMERS OR OTHER HEAVY HAND OR POWER <br />30. <br />INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURERS' <br />TOOLS SHALL BE PERFORMED AFTER REGULAR BUSINESS HOURS ON AN <br />RECOMMENDATIONS, ANY DIFFICULTIES ARE TO BE REPORTED TO THE <br />OVERTIME BASIS IF NECESSARY, UNLESS THE BUILDING MANAGEMENT AND <br />ARCHITECT IMMEDIATELY. <br />ANY AFFECTED TENANTS PROVIDE A WRITTEN WAIVER EXPRESSLY PERMITTING <br />31. <br />THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL WARRANTEE ALL <br />OTHERWISE. <br />WORK PERFORMED BY HIM DIRECTLY FOR A MINIMUM PERIOD OF ONE (1) <br />8. <br />THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR <br />YEAR AS SPECIFIED IN THE CONSTRUCTION CONTRACT. ALL DEFECTS <br />JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS <br />OCCURRING IN THE GUARANTEED PERIOD SHALL BE CORRECTED AT NO <br />PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS <br />ADDITIONAL COST. <br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO <br />32, <br />THE CLIENT, DESIGNER, CONSULTANTS AND ALL INSPECTORS FROM <br />NORMAL WORKING HOURS. THE CONTRACTOR. SHALL PROVIDE PUBLIC <br />PERTINENT AGENCIES SHALL BE PERMITTED ACCESS TO THE JOB SITE AT ALL <br />PROTECTION, AS NECESSARY AND REQUIRED BY GOVERNING AGENCIES <br />TIMES DURING NORMAL WORKING HOURS. <br />HAVING JURISDICTION, UNTIL CLIENT ACCEPTANCE OF THE PREMISES, <br />33, <br />THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND <br />9. <br />THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PROVISION <br />EQUIPMENT NECESSARY TO EXECUTE ALL WORK, EXCEPT WHERE NOTED AS <br />AND MAINTENANCE OF ALL BRACING, SHORING, ENCLOSURES, BARRIERS OR <br />NOT IN CONTRACT (N.I.C,). <br />SCAFFOLDING REQUIRED TO PROVIDE A SAFE WORKING ENVIRONMENT AS <br />34, <br />MINOR DETAILS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER <br />DICTATED BY SITE CONDITIONS AND THE PROGRESS OF WORK. <br />CONSTRUCTION OF ANY PART OF THE WORK, SHALL BE INCLUDED AS IF THEY <br />10. <br />DURING THE ENTIRE CONS T RUCTION PERIOD, ALL EXITS, EXIT LIGHTING, <br />WERE INDICATED IN THE DRAWINGS, UNLESS OTHERWISE AGREED UPON, <br />FIRE PROTECTION DEVICES AND ALARMS SHALL CONTINUOUSLY <br />WHERE THE CONTRACT, CONSTRUCTION NOTES OR DRAWINGS CALL FOR ANY <br />MAINTAINED IN CONFORMANCE I LOCAL BUILDING CODE AND OTHER <br />WORK OF A MORE STRINGENT NATURE THAN THAT REQUIRED BY THE <br />GOVERNING ENTITY REQUIREMENTS. UNO, ALL EXISTING, SERVICES AND <br />BUILDING CODE, OR ANY OTHER ENTI T HAVING JURISDICTION OVER THE <br />Y <br />DEVICES SHALL REMAIN ACTIVE, <br />WORK, THE WORK OF THE MORE STRINGENT NATURE CALLED SHALL BE <br />FURNISHED IN ALL CASES. <br />11. <br />THE CONTRACTOR SHALL PROTECT THE PROPERTY OF THE CLIENT AND THE <br />35, <br />FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH <br />BUILDING OWNER. INCLUDING, BUT IS NOT LIMITED TO, WINDOWS, FLOOR <br />MA I ERIALS WHICH YIELD THE HIGHEST PERCENT OF PRE -CONSUMER (POST - <br />AND CEILING FINISHES, PUBLIC TOILETS, ELEVATORS, DOORS & BUCKS, <br />INDUSTRIAL) AND POST -CONSUMER RECYCLED CONTENT, THE CONTRACTOR <br />ELECTRICAL AND AIR-CONDITIONING EQUIPMENT, THE CONTRACTOR SHALL <br />SHALL FURNISH THESE MATERIALS WITHIN THE PARAMETERS OF THE BUDGET <br />PROTECT ADJOINING PROPER-1 Y. DAMAGE CAUSED BY THE CONTRACTOR'S <br />AND SHALL NOT PURCHASE ANY COST -ADDING MATERIAL OR PAY A PREMIUM <br />WORK OR WORKMEN MUST BE MADE GOOD, IN A TIMELY FASHION, <br />(MORE THAN FAIR MARKET VALUE) WITHOUT PROJECT MANAGER AND OWNER <br />PATCHING AND REPLACEMENT OF DAMAGED WORK SHALL BE PERFORMED AT <br />ACKNOWLEDGEMENT AND APPROVAL. <br />THE COST OF THE CONTRACTOR.THE CONTRACTOR SHALL BE FULLY <br />36. <br />FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH <br />RESPONSIBLE FOR ALL SUB -CONTRACTORS. IF THE CONTRACTOR FAILS TO <br />MATERIALS MANUFACTURED WITHIN A 500 MILE RADIUS OF THE PROJECT <br />COMPLETE THE REPAIRS IN A TIMELY FASHION, SAID REPAIRS WILL BE MADE <br />SITE WHERE AVAILABLE, WITHIN BUDGET, WITHIN FAIR MARKET VALUE AND <br />BY A CONTRACTOR SELECTED BY THE OWNER'S REPRESENTATIVE AND BACK <br />DO NOT PRESENT RISK TO THE PROJECT SCHEDULE. <br />CHARGED ACCORDINGLY. <br />12. <br />THE CONTRACTOR SHALL INDEMNIFY AND SAVE HARMLESS THE LANDLORD, <br />37. <br />FOR ALL NEW WOOD PRODUCTS INCLUDING BUT NOT LIMITED TO PARTICLE <br />THE TENANT, AND DESIGNER AGAINST ANY AND ALL CLAIMS AND DEMANDS <br />BOARD, MDF, PLYWOOD, OSB AND WOOD DOORS, THE CONTRACTOR, SHALL <br />FOR THE DAMAGE TO THE PROPERTY OF ANY PERSON, FIRM OR INDIVIDUAL <br />FURNISH MAT ERIALS THAT CONTAIN NO ADDED UREA-FORMADALHYDE. <br />OR FOR PERSONAL INJURIES (INCLUDING DEATH) ARISING OUT OF, OR <br />38. <br />DETAILS AILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN. MINOR <br />SUFFERED WHILE ENGAGED IN, OR CAUSED, IN WHOLE OR IN PART, BY THE <br />MODIFICA IIONS MAY BE REQUIRED TO SUITE FIELD CONDITIONS, <br />EXECUTION OF THE WORK; THE CONTRACTOR SHALL WELL AND TRULY <br />REQUIRED MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK. <br />DEFEND THE LANDLORD, TENANT AND DESIGNER AND SHALL PAY ALL <br />39. <br />ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER BY MECHANICS <br />MONIES AWARDED FOR SUCH DAMAGES OR INJURIES (INCLUDING DEATH), ALL <br />AND TRADESPERSONS SKILLED IN THEIR RESPECTIVE TRADES AND IN <br />COSTS INCLUDING ATTORNEY'S FEES SUSTAINED, AND SHALL OBTAIN A FULL <br />ACCORDANCE WITH THE BEST TRADE PRACTICES, <br />ACQUAINTANCE AND RELEASE IN FAVOR. OF THE LANDLORD, TENANT AND <br />40. <br />THE CONTRACTOR SHALL CONFIRM THE AVAILABILITY AND DELIVERY TIMES <br />DESIGNER, UNLESS SUCH LIABILITY RESULTS SOLELY FROM THE NEGLIGENCE <br />FOR ALL SPECIFIED MA I ERIALS & EQUIPMENT REQUIRED TO PERFORM THE <br />OF THE LANDLORD, TENANT, DESIGNER, ITS AGENTS OR EMPLOYEES. <br />WORK UPON RECEIPT OF THE CONTRCC T DOCUMENTS. SHOULD THE <br />13. <br />THE DESIGNER. SHALL NOT BE HELD RESPONSIBLE FOR THE PERFORMANCE OF <br />AVAILABILITY OF SPECIFIED ITEMS POSE A DELAY TO THE ON -TIME <br />ANY WORK, NOR FOR THE MEANS AND METHODS OF CONSTRUCTION CHOSEN <br />COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL NOTIFY THE <br />BY THE CONTRACTOR OR ANY SUB -CONTRACTORS, NOR SHALL THE DESIGNER <br />DESIGNER IMMEDIATELY AND PROPOSE AN EQUIVALENT SUBSTITUTION TO <br />GUARANTEE THE PERFORMANCE OF THEIR CONTRACTS. <br />BE REVIEWED BY THE ARCHITECT IF SUCH A DELAY IS NOT ACCEPTABLE. <br />14. <br />THE CONTRACTOR SHALL PERFORM DAILY CLEANING OF THE JOB SITE <br />41. <br />SUBSTITUTION OF ALL EQUALS SHALL BE ONLY AS APPROVED BY THE <br />DUPING THE CONSTRUCTION PERIOD AND SHALL PROTECT FINISHED WORK <br />DESIGNER. WHERE THE TERM "OR EQUAL" IS USED THE DESIGNER SHALL <br />FROM DAMAGE. IMMEDIATELY PRIOR TO TENANT OCCUPANCY, THE <br />BE THE SOLE JUDGE OF EQUALITY BASED UPON THE INFORMATION <br />CONTRACTOR SHALL PERFORM FINAL CLEANING OF THE WORK AREA <br />FURNISHED BY THE CONTRACTOR, SUBSTITUTIONS MUST BE ACCEPTED IN <br />INCLUDING, BUT NOT LIMITED TO, WET WIPING OF FURNITURE, AND <br />WRITING BEFORE THEY MAY BE USED. <br />CASEWORK, WASHING AND WAXING OF VCT FLOORING; AND THE VACUUMING <br />42. <br />THE CONTRACTOR SHALL PREPARE SUBMITTALS FOR REVIEW BY THE <br />OF CARPET, ALL CLEANING SHALL BE IN ACCORDANCE WIT H <br />DESIGNER, FOR ALL MATERIALS AND EQUIPMENT SPECIFIED. IF THE <br />MANUFACTURERS' RECOMMENDATIONS <br />CONTRACTOR, THE OWNER, OR THE OWNER'S REPRESENTATIVE SUBSTITUTES <br />15. <br />THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL <br />A MATERIAL, METHOD OF ATTACHMENT, REVISES A CONSTRUCTION DETAIL, <br />SUB -CONTRACTORS AND SHALL PERFORM SUCH MISCELLANEOUS WORK AS <br />OR IN ANY WAY ALTERS THE WORK SUCH THAT IT NO LONGER CONFORMS TO <br />MAY BE NECESSARY FOR THEM TO COMPLETE THEIR WORK. IT IS EXPECTED <br />THESE DOCUMENTS, WITHOUT THE WRITTEN ACCEPTANCE OF THE <br />THAT THE CONTRACT OR SHALL ALSO CLOSELY COORDINATE THE WORK WITH <br />ARCHITECT, SUCH ACTION WILL RELIEVE THE DESIGNER OF ANY <br />THAT OF ALL OTHER VENDORS RETAINED BY THE CLIENT TO ASSURE THAT <br />RESPONSIBILITY OR LIABILITY INCLUDING, BUT NOT LIMITED TO, AES I HETIC <br />ALL SCHEDULES ARE MET AND THAT WORK PROCEEDS WITHOUT DELAY. <br />CONSEQUENCES, SUBSEQUENT FAILURE(S) AND PERSONAL OR PROPERTY <br />16. <br />BIDDERS, BEFORE SUBMIT T ING PROPOSALS, SHALL VISIT AND CAREFULLY <br />DAMAGE ATTRIBUTABLE TO THIS CHANGE. <br />EXAMINE THE AREA AFFEC T ED BY THE WORK TO FAMILIARIZE THEMSELVES <br />43. <br />REVIEW OF A SPECIFIC ITEM SHALL NOT INCLUDE REVIEW OF AN ASSEMBLY <br />WITH THE EXISTING CONDITIONS AND THE DIFFICULTIES THAT WILL AFFECT <br />OF WHICH THE ITEM IS A COMPONENT. <br />THE EXECUTION OF THE WORK, SUBMISSION OF A PROPOSAL WILL BE <br />44. <br />SUBMITTALS THAT CONTAIN EXCESSIVE ERRORS OR ARE INCOMPLETE OR <br />CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE, <br />INADEQUATE MAY BE RETURNED WITHOUT ACTION, COSTS INCURRED FOR <br />AND LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR, <br />THE RESULTANT DELAYS WILL BE THE RESPONSIBILITY OF THE <br />EQUIPMENT, OR MATERIALS, REQUIRED BECAUSE OF DIFFICULTIES <br />CONTRACTOR. <br />ENCOUNTERED WHICH COULD HAVE BEEN REASONABLY FORESEEN HAD SUCH <br />45. <br />REVIEW OF SUBM11 I ALS SHALL NOT RELIEVE THE CONTRACTOR OF <br />AN EXAMINAT ION BEEN MADE. THE GENERAL CONTRACTOR SHALL VERIFY ALL <br />OBLIGATIONS OR RESPONSIBILITIES FOR DEVIATIONS FROM THE <br />CONDITIONS AND DIMENSIONS ON THE JOB SITE AND REPORT ANY AND ALL <br />REQUIREMENTS OF THESE CONTRACT DOCUMENTS, UNLESS THE DESIGNER <br />DISCREPANCIES AND/OR UNUSUAL CONDITIONS TO THE ARCHITECT PRIOR <br />IS NOTIFIED AND SPECIFICALLY APPROVES OF, THE DEVIATIONS AT THE <br />TO FINALIZING BIDS OR COMMENCEMENT OF ANY CONSTRUCTION. <br />TIME OF SUBMISSION. <br />17. <br />THE GENERAL CONTRACTOR SHALL MAKE KNOWN ANY AND ALL LIMITATIONS, IONS, <br />46. <br />REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR'S <br />EXCLUSIONS, OR MODIFICATIONS TO THE PROJECT DURING THE BID <br />OBLIGATION FOR COORDINATION NOR WAIVE RESPONSIBILITY FOR ERRORS <br />SELECTIONS PERIOD. ANY AND ALL LIMITATIONS, EXCLUSIONS, OR <br />AND OMISSIONS IN THE SUBMITTALS, INCLUDING "FIELD MEASURE." <br />MODIFICATIONS NOT ITEMIZED IN THE BID PROPOSAL DOCUMENTS ARE <br />47. <br />CHANGES IN THE SCOPE OF WORK OR IN CONSTRUCTION DETAILS, <br />PRESUMED "INCLUDED", IN WHICH CASE NO ADDITIONAL MONIES WILL BE <br />WHETHER DUE TO FIELD CONDITIONS OR OMISSIONS BY THE CONTRACTOR, <br />ALLOCATED FOR THIS WORK. <br />ARCHITECT OR OWNER, SHALL BE DOCUMENTED BY THE DESIGNER AND <br />18, <br />EXISTING CONSTRUCTION AND DIMENSIONS SHOWN ARE PER EXISTING <br />APPROVED, PRIOR TO EXECUTION. <br />DRAWINGS OR SITE VERIFICATION. ALL EXISTING INFORMATION MUST BE <br />48. <br />THE PRESENCE OF A REPRESENTATIVE OF THE DESIGNER ON THE JOB SITE <br />VERIFIED IN THE FIELD. NEITHER THE OWNER NOR THE DESIGNER ARE <br />DOES NOT IMPLY CONCURRENCE WITH OR THE APPROVAL OF ANY WORK. THE <br />RESPONSIBLE FOR ACCURACY OF EXISTING INFORMATION. EXISTING <br />CONTRACTOR SHALL CALL TO THE ATTENTION OF THE DESIGNER, IN <br />CONSTRUCTION CONDITIONS IN AREAS WHERE NEW WORK IS NOT PLANNED MAY <br />WRITING, ALL SPECIFIC A T EMS FOR WHICH DESIGNER'S REVIEW IS REQUIRED. <br />19. <br />BE NOT COMPLETELY SHOWN. <br />WITHIN ONE (1) WEEK (5 BUSINESS DAYS), THE THIS <br />49, <br />UPON SUBSTANTIAL COMPLETION OF WORK THE CONTRACTOR SHALL <br />CON T RAT, PRIOR TO MOBILIZATION FOR ANY WORKK,, THE O <br />HE CONTRACTOR <br />PREPARE A "PUNCHLIST" OF CORRECTIONS AND UNSATISFACTORY AND/OR <br />SHALL FURNISH A CONSTRUCTION SCHEDULE SHOWING CHRONOLOGICALLY <br />INCOMPLETE WORK FOR REVIEW BY THE ARCHITECT. <br />THE PHASES OF THE WORK, AND ALL RELATED WORK FOR THE COMPLETION OF <br />THE PROJECT. THIS SCHEDULE SHALL INDICATE ALL ORDERING LEAD TIMES, <br />LENGTH OF TIME FOR EACH PHASE, ITS START AND COMPLETION, WITH A <br />PROJECTED COMPLETION DATE. <br />50. THE CONTRACTOR SHALL MAINTAIN AT THE SITE, ONE RECORD COPY OF ALL <br />DRAWINGS, PERMIT S, SUBMITTALS AND SAMPLES ON WHICH TO RECORD ALL <br />CHANGES DURING CONSTRUCTION, ACCESS TO THESE SHALL BE PROVIDED FOR <br />THE USE OF ALL TRADES, CLIENT REPRESENTATIVES AND THE DESIGNER, <br />DURING ALL PHASES OF CONSTRUCTION, <br />51. DURING THE COURSE OF CONSTRUCTION, ACTUAL LOCATIONS SHALL BE <br />INDICATED TO SCALE IN RED INK ON THE OWNERS RECORD DRAWINGS FOR ALL <br />RUNS OF MECHANICAL AND ELECTRICAL WORK INCLUDING CONCEALED WORK. <br />WHICH DEVIA T ES FROM THE DRAWINGS. UPON COMPLETION OF THE PROJECT, <br />INCLUDING ALL PUNCHLIST ITEMS, THIS INFORMATION SHALL BE NEATLY <br />TRANSFERRED BY THE CONTRACTOR TO A SET OF DRAWINGS, WHICH SHALL BE <br />MARKED "AS BUILT SET" AND COPIES SHALL BE PROVIDED TO BOTH THE <br />OWNER AND THE ARCHITECT. WITHIN THREE (3) WEEKS (15 BUSINESS DAYS) <br />OF THE RECEIPT OF THE "AS BUILT SET." APPROVAL FOR FINAL PAYMENT TO <br />THE CONTRACTOR SHALL BE GRANTED OR REASONABLE CAUSE SHOWN WHY <br />SUCH APPROVAL HAS BEEN DENIED, <br />52. PRIOR TO THE COMPLETION OF THE WORK, THE CONTRACTOR SHALL <br />ASSEMBLE AND FURNISH THE CLIENT A COMPLETE SET OF MANUFACTURERS' <br />CATALOG, OPERATING INSTRUCTIONS, START-UP CHECK LISTS, MAINTENANCE <br />INSTRUCTIONS AND SIMILAR DATA, AS WELL AS ALL GUARANTEE(S) FOR ALL <br />EQUIPMENT AND OPERABLE DEVICES FURNISHED OR INSTALLED BY THE <br />CONTRACTOR UNDER THIS CONTRACT, AND SHALL ORIENT AND INSTRUCT <br />THE PERSONNEL DESIGNATED BY THE CLIENT IN THE OPERATION OF ALL SUCH <br />EQUIPMENT. <br />53. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER IN THE EVENT <br />THAT MOLD OR ASBESTOS IS UNCOVERED. THE OWNER SHALL RETAIN A <br />QUALIFIED CONSULTANT WHO SHALL ARRANGE FOR THE PROMPT <br />IDENTIFICATION, TESTING, TREATMENT, REMEDIATION AND STORAGE OF THE <br />MOLD OR ASBESTOS AS REQUIRED BY LAW AND GOOD CONSTRUCTION <br />PRACTICES, THE DESIGNER SHALL BEAR NO RESPONSIBILITY FOR WORK <br />RELATED TO THESE MATERIALS. <br />54. THE CONTRACTOR IS ADVISED THAT THE PREMISE HAS NOT BEEN TESTED FOR <br />LEAD PAINT OR OTHER POTENTIALLY HAZARDOUS MATERIALS, THE <br />CONTRACTOR SHALL USE ALL APPROPRIATE PRECAUTIONS IN THE CARRYING <br />OUT OF ALL CONSTRUCTION OPERATIONS WHICH MIGHT DISTURB SUCH <br />MATERIALS. <br />55. ALL CONTRACTORS SHALL CARRY PROPERTY DAMAGE AND PUBLIC LIABILITY <br />INSURANCE AS REQUIRED BY ANY GOVERNING AGENCIES HAVING <br />JURISDICTION AND COMPLYING WITH STA71 UTORY REQUIREMENTS FOR <br />DISABILITY AND WORKMEN'S COMPENSATION. <br />ABBREVIATIONS <br />A/C <br />AIR CONDITIONING <br />A/C UNIT <br />AIR CONDITIONING UNIT <br />A/E <br />ARCHITECT/ENGINEER <br />A/V <br />AUDIO VISUAL <br />ACT <br />ACOUSTICAL CEILING TILE <br />AD] <br />ADJACENT <br />AFF <br />ABOVE FINISH FLOOR <br />AHU <br />AIR HANDLING UNIT <br />ALT <br />Al-TERNA T E(ING) <br />ALUM <br />ALUMINUM <br />ANOD <br />ANODIZED <br />APPROX <br />APPROXIMATE <br />ARCH <br />ARCHITECT <br />AUTO <br />AUTOMATIC <br />AVG <br />AVERAGE <br />B <br />BETW <br />BETWEEN <br />BEV <br />BEVELED <br />BIT <br />BITUMINOUS <br />BLDG <br />BUILDING <br />BLK <br />BLOCK <br />BLKG <br />BLOCKING <br />BSMT <br />BASEMENT <br />BTM <br />BOTTOM <br />BTU <br />BRITISH THERMAL UNIT <br />BUR <br />BUILT UP ROOFING <br />C <br />CER <br />CERAMIC <br />CF <br />CUBIC FEET <br />Cl <br />CONTROL JOINT <br />CL <br />CENTERLINE <br />CLG <br />CEILING <br />CLOS <br />CLOSET <br />CLR <br />CLEAR <br />CMU <br />CONCRETE MASONRY UNIT <br />COL <br />COLUMN <br />CONIC <br />CONCRETE <br />CONSTR <br />CONSTRUCTION <br />CONT <br />CONTINUNOUS <br />CONTR <br />CONTRACTOR <br />CORR <br />CORRIDOR <br />CPT <br />CARPET <br />CT <br />CERAMIC TILE <br />CTR <br />CENTER <br />CU FT <br />CUBIC FEET <br />D <br />D <br />DEPTH <br />DBL <br />DOUBLE <br />DEG <br />DEGREES <br />DEMO <br />DEMOLITION or DEMOLISH <br />DEPT <br />DEPARTMENT <br />DF <br />DRINKING FOUNTAIN <br />DH <br />DOUBLE HUNG <br />DIAL <br />DIAGONAL <br />DIA,M <br />DIAMETER <br />DISP <br />DISPENSER <br />DN <br />DOWN <br />DR <br />DOOR(S) <br />DS <br />DOWN SPOUT <br />DTL <br />DETAIL <br />DWG <br />DRAWING <br />DWR <br />DRAWER <br />E <br />E <br />FAST <br />EA <br />EACH <br />EF <br />EXHAUST FAN <br />EJ <br />EXPANSION JOIN <br />ELEC <br />ELECTRIC(CAL) <br />ELEV <br />ELEVATION or ELEVATOR <br />EMERG <br />EMERGENCY <br />ENCL <br />ENCLOSURE <br />ENGR <br />ENGINEER <br />ENTR <br />ENTRANCE <br />EQ <br />EQUAL <br />EQUIP <br />EQUIPMENT <br />EW <br />EACH WAY <br />EWC <br />ELECTRIC WATER COOLER <br />EXH <br />EXHAUST <br />EXIST <br />EXISTING <br />EXP <br />EXPANSION <br />EXT <br />EXTERNAL or EXTERIOR <br />F <br />------------- <br />------------------ <br />FC <br />FOOT CANDLES <br />FD <br />FLOOR DRAIN <br />FDN <br />FOUNDATION <br />FE <br />FIRE EXTINGUISHER <br />FEC <br />FIRE EXTINGUISHER <br />CABINET <br />FF <br />FINISH FLOOR <br />FHC <br />FIRE HOSE CABINET <br />FIG <br />FIGURE <br />FIN <br />FINISH <br />F1XF <br />FIXTURE <br />FLEX <br />FLEXIBLE <br />FLOUR <br />FLOURESCENT <br />FLR <br />FLOOR <br />FP <br />FIRE PROTECTIONS <br />FPL <br />FABRIC PANEL <br />FRTWD <br />FIRE RETARDEN T TREATED <br />WOOD <br />F i <br />FOOT or FEET <br />FURR <br />FURRING <br />G <br />GC <br />_ <br />GENERAL CONTRACTOR <br />GEN <br />GENERAL or GENERATOR <br />GFI <br />GROUND FAULT <br />INTERRUPTER <br />GL <br />GLASS or GLAZING <br />GRD <br />GROUND <br />GWB <br />GYPSUM WALL BOARD <br />GYP <br />GYPSUM <br />H <br />H <br />- <br />HIGH <br />HB <br />HOSE BIB <br />HC <br />HOLLOW CORE <br />HDW <br />HARDWARE <br />HM <br />HOLLOW METAL <br />HORTZ <br />NORIZON T AL <br />HR <br />HOUR <br />HT <br />HEIGHT <br />HVAC <br />HEATING VENTILATION & <br />AIR COND. <br />HW <br />HOT WATER <br />HWY <br />HIGHWAY <br />I <br />IN <br />INCHES <br />INCAND <br />INCANDESCENT <br />INCL <br />INCLUDE(ING) or <br />INCLUSIVE <br />INFO <br />INFORMATION <br />INSUL <br />INSULATION <br />INT <br />INTERIOR <br />INV <br />INVERT <br />J <br />JAN CLOS <br />JANITOR'S CLOSET <br />JB <br />JUNCTION BOX <br />JST <br />JOIST <br />JT <br />JOINT <br />K <br />KD <br />KNOCK DOWN <br />KIT <br />KITCHEN <br />L <br />L <br />LOW <br />LAM <br />LAMINATE(D) <br />LAV <br />LAVATORY <br />LF <br />LINEAR FEET <br />LL <br />LIVE LOAD <br />M HAL <br />METAL HALIDE <br />MAINT <br />MAINTENANCE <br />MAS <br />MASONRY <br />MATL <br />MATERIAL <br />MAX <br />MAXIMUM <br />MECH <br />MECHANICAL <br />MED <br />MEDIUM <br />MFR <br />MANUFACTURER <br />MIN <br />MINUMUM <br />MISC <br />MISCELLANEOUS <br />MTG <br />MOUNTING <br />MTL <br />METAL <br />N <br />NORTH <br />N/A <br />NOT APPLICABLE / NOT <br />AVAILABLE <br />NE <br />NORTHEAST <br />NEC <br />NATIONAL ELECTRIC CODE <br />NEG <br />NEGATIVE <br />NIC <br />NOT IN CONTRACT <br />NITS <br />NOT TO SCALE <br />NW <br />NORTHWEST <br />OC <br />ON CENTER <br />OCC <br />OCCUPANCY or OCCUPIED <br />P <br />-------------------- <br />PERCENT <br />PART <br />PARTIAL <br />PASS <br />PASSAGE <br />PC <br />PRECAST <br />PED <br />PEDESTAL <br />PL <br />PLATE or PROPERTY LINE <br />PLAM <br />PLASTIC LAMINATE <br />PLAS <br />PLASTIC <br />PLYWD <br />PLYWOOD <br />PREFAB <br />PREFABRICATED <br />PROJ <br />PROJECT or PROJECTED <br />PT <br />PAINT <br />PT N <br />PARTITION <br />QT <br />QUARRY TILE <br />QTY <br />QUANTITY <br />R <br />R- <br />RB <br />RUBBER BASE <br />RBR <br />RUBBER <br />RCP <br />REFLECTED CEILING PLAN <br />RD <br />ROAD or ROOD DRAIN <br />REBAR <br />REINFORCING BAR <br />RECEPT <br />RECEPTACLE <br />RECT <br />RECTANGULAR <br />REF <br />REFERENCE <br />REINF <br />REINFORCING or <br />REINFORCEMENT <br />REQ'D <br />REQUIRED <br />RET <br />RETURN <br />REV <br />REVISE or REVISION <br />RM <br />ROOM <br />RO <br />ROUGH OPENING <br />ROW <br />RIGHT OF WAY <br />RPM <br />REVOLUTIONS PER MINUTE <br />RSF <br />RENTABLE SQUARE FEET <br />RT <br />RUBBER TILE <br />RTU <br />ROOF TOP UNIT <br />RWC <br />RAINWATER CONDUCTOR <br />S <br />-------------- <br />S <br />----------------- <br />SOUTH <br />SAN <br />SANITARY <br />SB <br />STONE BASE <br />SC <br />SOLID CORE <br />SCHED <br />SCHEDULE <br />SCHEM <br />SCHEMATIC <br />SE <br />SOUTHEAST <br />SECT <br />SECTION <br />SF <br />SQUARE FOOTAGE <br />SHWR <br />SHOWER <br />SIM <br />SIMILIAR <br />SPEC <br />SPECIFICATION(S) <br />SPKR <br />SPEAKER <br />SO <br />SQUARE <br />SQ FT <br />SQUARE FOOT <br />SSTL <br />STAINLESS STEEL <br />ST <br />STREET <br />STD <br />STANDARD <br />STL <br />STEEL <br />STOR <br />STORAGE <br />STRUCT <br />STRUCTURE or <br />STRUCTURAL <br />SUSP <br />SUSPENDED <br />SW <br />SOUTHWEST <br />SYMB <br />SUMBOL <br />SYS <br />SYSTEM <br />T <br />T <br />TREAD(S) or TILE <br />T&B <br />TOP & BOTTOM <br />T&G <br />TONGUE& GROOVE <br />T'STAT <br />THERMOSTAT <br />TB <br />TILE BASE <br />TDB <br />TO BE DETERMINED <br />TEL <br />TELEPHONE <br />TEMP <br />TEMPORARY or <br />TEMPERATURE <br />TERR <br />TERRAZZO <br />THK <br />THICK <br />THRES <br />THRESHOLD <br />THRU <br />THROUGH <br />TOC <br />TOP OF CONCRETE/CURS <br />TOS <br />TOP OF STEEL <br />TOW <br />TOP OF WALL <br />TRANSF <br />TRANSFORMER <br />TYP <br />TYPICAL <br />UC <br />UNDERCUT <br />UL <br />UNDERWRITER'S <br />LABORATORY <br />UNEXCAV <br />UNEXCAVATED <br />LINO <br />UNLESS NOTED <br />OTHERWISE <br />UPS <br />UNINTERRUPTABLE POWER <br />SUPPLY <br />UR <br />URINAL <br />USF <br />USABLE SQUARE FOOTAGE <br />UTIL <br />UTILITY <br />V <br />V <br />VOLT or VENT <br />VAP RET <br />VAPOR RETARDER <br />VAR <br />VARIES <br />VB <br />VINYL BASE <br />VCT <br />VINYL COMPOSITION TILE <br />VENT <br />VENTILITATION <br />VERT <br />VERTICAL <br />VEST <br />VESTIBULE <br />VIF <br />VERIFY IN FIELD <br />VOL <br />VOLUME <br />VTR. <br />VENT THROUGH ROOF <br />VWC <br />VINYL WALL COVERING <br />W <br />-- - --- - <br />W <br />--- - -- ---- - ----- <br />W EST or WATT <br />W/ <br />WITH <br />W/0 <br />WITHOUT <br />WB <br />WOOD BASE <br />WC <br />WATER CLOSET (TOILET) <br />WD <br />WOOD (SOFTWOOD) <br />WF <br />WIDE FLANGE <br />WH <br />WATER HEATER <br />WP <br />WATERPROOF <br />Y_____ _ <br />YD <br />_ _ __ <br />YARD or YARD DRAIN <br />NORTH ARROW PHIC SCALE <br />NORTH PLAN NORTH <br />0 1 / 2' 1-' 2' <br />TR[JF NCIRTFi <br />VEWTICAL ELEVATION <br />� Level Name <br />-�O� Elevation <br />MATCH LINE <br />02 / A2.1 <br />SHEET NUMBER <br />DETAIL NUMBER <br />ROOM NAME AND NUMBER TAG <br />Room Name <br />001 <br />FURNITURKA_g_QUIPMENT TAG <br />li <br />1ao <br />TAG NUMBER <br />ALIGNMENT <br />NEW CONSTRUCTION TO <br />ALIGN OR FLUSH WITH <br />EXISTING CONSTRUCTION <br />OBJECT STATE <br />N NEW <br />R RELOCATED <br />DOOR NUMBER TAG <br />SPOT ELEVATION <br />Level Nam <br />Elevation <br />LEADERS <br />LEADER <br />AREA LEADER <br />PARTITION TAG <br />==I --- <br />WINDOW TYPE TAG <br />1t <br />DRAWING REVISIONS <br />i REVISION NUMBER <br />- REVISION DELTA <br />E EXISTING TO REMAIN <br />X EXISTING TO BE REMOVED <br />EXISTING TO BE SALVAGED <br />BUILDING SECTION TAG <br />SEC T ION <br />DESIGNATION <br />1 1 <br />A7.1 A7.1 <br />SHEET NUMBER <br />DETAIL/WALL SECTION TAG <br />SECTION <br />DESIGNATION <br />1 <br />A7.1 <br />SHEET NUMBER <br />EXTERIOR ELEVATION TAG <br />SECTION <br />DESIGNATION <br />1 <br />A7.1 <br />SHEET NUMBER <br />INTERIOR ELEVATION TAG <br />1 ELEVATION <br />DESIGNATION <br />a A8.1 2 <br />3 SHEET NUMBER <br />PARTIAL PLAN & DETAIL TAG <br />PLAN OR DETAIL <br />DESIGNATION <br />SIMILAR DETAIL <br />SHEET NUMBER <br />-View Name <br />WALL TYPE LEGEND <br />NOT IN CONTRACT (NIC) <br />EXISTING WALL TO REMAIN <br />NEW WALL <br />---------- <br />EXISTING WALL TO BE REMOVED <br />----------- <br />OVERHEAD SOFFIT/UPPER CABINET <br />DEMOUNTABLE PARTITION (BY <br />- �-® <br />CONTRACTOR) <br />DEMOUNTABLE PARTITION (Y <br />® <br />VENDOR) <br />��---STOREFRONT <br />PARTIAL HEIGHT' WALL <br />RAISED FLOORING <br />FIKE EXTINGUISHER <br />FEC SURFACE MOUNTED CABINET <br />FEC RECESSED CABINET <br />FE <br />WALL MOUNTED <br />s <br />9 <br />TOILET <br />URINAL <br />SINK - COUNTER <br />MOUNTED <br />SINK - WALL <br />MOUNTED <br />MO - <br />TILITY SINK <br />SHOWER <br />I -LEVEL WATER <br />COOLER <br />Cre:�xsted Crane nten.ors <br />Design Studio <br />23410 18th Ave. South, Suite <br />Des Moines, k ' <br />Client Tens <br />OLYMPiC HOT TUB <br />Attn: Don Kiting <br />Tel: 206.409.4849 <br />Email: Don a�0lympicHotTub <br />Designer: <br />e <br />Description: ; <br />PERMIT SET 02/15/2021 <br />Proj. Na.: 811mOHT_EVERETT <br />