|
111
<br />1
<br />�
<br />FINISH PLAN_
<br />NORTH
<br />FINISH
<br />FLOOR FINISH TRANSITION TO COMPLY TO ICC/
<br />WALL FINISH
<br />P-1
<br />F-1
<br />FLOOR FINISH
<br />PT-1 INDICATES EXTENT OF FINISH
<br />WALL FINISH
<br />1. SEE FINISH SCHEDULE ON SHEET A9-1.
<br />2. ALL FINISH SELECTIONS IDENTIFIED IN LEGENDS AND FINISH SCHEDULES ARE
<br />NOT SUBJECT TO 'OR EQUAL' SUBSTITUTIONS U.N.O. THE CONTRACTOR AND
<br />SUBCONTRACTORS SHALL SUBMIT PRODUCTS AND FINISHES AS INDICATED IN
<br />THE DOCUMENTS.
<br />3. NOTIFY DESIGNER OF SCHEDULED FINISHES THAT ARE UNAVAILABLE OR
<br />DISCONTINUED AT THE EARLIEST OPPORTUNITY SUCH THAT A SUBSTITUTION
<br />CAN BE SELECTED WITHOUT JEOPARDIZING THE CONSTRUCTION SCHEDULE.
<br />4. REFER TO THE FINISH SCHEDULE FOR MANUFACTURER, PRODUCT/STYLE NAME,
<br />COLOR SPECIFICATION.
<br />5. INSTALL. ALL FINISH MATERIALS IN ACCORDANCE WITH THE MANUFACTURER'S
<br />RECOMMENDED SPECIFICATIONS, SURFACE PREPARATION, ADHESIVES AND
<br />BACKINGS: INCLUDING WALL COVERINGS, COATINGS, FLOORING MATERIALS,
<br />LAMINATES, ETC.
<br />6. THE CONTRACTOR SHALL REPAIR ALL ROUGH FLOOR SLAB UNEVENNESS
<br />SUITABLE FOR PROPER FLOOR COVERING INSTALLATION.
<br />7. FLOOR MATERIAL TRANSITIONS AT DOOR OPENINGS ARE TO BE CENTERED
<br />BELOW THE DOOR IN THE CLOSED POSITION, U.N.O.
<br />8. THE PAINTING SUBCONTRACTOR SHALL ENSURE THAT ALL PAINTS COMPLY
<br />WITH THE MUNICIPAL & STATE CODES AND BUILDING REGULATIONS FOR LOW
<br />VOC EMISSIONS.
<br />9. ELECTRICAL SWITCH AND OUTLET COVER PLATES, SURFACE HARDWARE, ETC.
<br />SHALL BE INSTALLED AFTER PAINTING AND/OR APPLICATION OF WALL
<br />COVERINGS AND SPECIFIED CARPET.
<br />10. PROVIDE METAL. TRANSITION STRIPS AT ALL FLOORING MATERIAL CHANGES,
<br />U.N.O. TRANSITION STRIPS TO STAINLESS STEEL U.N.O. REFER TO PLAN FOR
<br />DETAIL LOCATIONS.
<br />11. HARD FLOORING GROUT IS -TO BE SEALED WITH MANUFACTURER'S
<br />RECOMMENDED SEALERS.
<br />12. RUBBER/VINYL BASE SHALL BE COVED BASE AT ALL LOCATIONS FOR CARPET
<br />AND COVE BASE AT RESILIENT FLOORS.
<br />13. RUBBER BASE SHALL RUN CONTINUOUSLY AND FULLY SURROUND CABINET
<br />BASES ON ALL EXPOSED SIDES.
<br />14. ALL ELECTRICAL PANELS VISIBLE IN OTHER THAN ELECTRICAL ROOMS SHALL
<br />BE PAINTED TO MATCH THE ADJACENT WALL FINISH.
<br />15. UNDERSIDE OF SOFFITS (WHERE OCCURS) TO BE PAINTED PT-1.
<br />16. ALL WALLS TO RECEIVE PT-1 AND B-1 U.N.O.
<br />17. ALL FLOORING THROUGHOUT TO REMAIN EXPOSED CONCRETE_, U.N.O.
<br />18. FINISH FLOORING TO EXTEND FROM WALL TO WALL INCLUDING UNDER
<br />CABINETS AND UNDER CABINET EQUIPMENT.
<br />19. ALL INTERIOR WALL AND CEILING FINISHES TO COMPLY WITH IBC SECTION
<br />803 AND IBC TABLE 803.9 AND ALL LOCAL CODE AMENDMENTS.
<br />20. ALL INTERIOR FLOOR FINISHES TO COMPLY WITH IBC SECTION 804 AND ALL
<br />LOCAL CODE AMENDMENTS.
<br />21. ALL DECORATIVE MATERIALS AND TRIM SHALL COMPLY WITH IBC SECTION 805
<br />AND ALL LOCAL CODE AMENDMENTS.
<br />22. ALL PAINTED SURFACES ARE TO RECEIVE A PRIME COAT AND A MINIMUM OF
<br />TWO COATS FINAL COLOR, U.N.O. APPLY PER MANUFACTURER'S
<br />RECOMMENDATION.
<br />23. ALL PAINTED DOORS AND DOOR FRAMES SHALL BE PAINTED WITH AN ALKYD
<br />BASED SEMI -GLOSS FINISH U.N.O.
<br />24. ALL CONVECTOR COVERS SHALL BE PAINTED WITH AN ALKYD BASED
<br />SEMI -GLOSS FINISH U.N.O.
<br />25. CARPET CONTRACTOR SHALL VERIFY THAT ALL CARPET OF EACH VARIETY IS
<br />TO BE SHIPPED FROM THE SAME DYE -LOT.
<br />26. ALL WALLS PAINTED WITH A LATEX PAINT TO HAVE AN EGGSHELL FINISH,
<br />U.N.O. REFER TO THE FINISH SCHEDULE AND FINISH LEGEND.
<br />27. GYPSUM BOARD CEILINGS SCHEDULED TO RECEIVE PAINT SHALL HAVE A FLAT
<br />FINISH, U.N.O.
<br />28. PROVIDE DESIGNER WITH A MINIMUM OF (3) 8" X 10" BRUSH -OUTS OF EACH
<br />COLOR AND FINISH FOR DESIGNER'S APPROVAL. PRIOR TO APPLICATION,
<br />ON -SITE APPLICATION WILL BE REQUIRED FOR FINAL APPROVAL. DESIGNER
<br />RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL TEST
<br />HAS BEEN MADE.
<br />29. PRIOR TO THE INSTALLATION OF ANY CARPET MATERIAL, PROVIDE TO THE
<br />DESIGNER, FOR APPROVAL, A SEAMING DIAGRAM ILLUSTRATING THE
<br />DIRECTION OF THE CARPET AND THE SEAM LOCATIONS.
<br />30. CARPET SEAMS SHALL NOT BE LOCATED PERPENDICULAR THROUGH DOOR
<br />THRESHOLDS
<br />31. ALL PLASTIC LAMINATE MILLWORK ENCLOSED CABINET INTERIORS TO BE
<br />WHITE MELAMINE, U.N.O.
<br />32, ARCHITECTURAL ADHESIVES, SEALANTS AND SEALANT PRIMERS MUST COMPLY
<br />WITH SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) RULE
<br />#1168. VOLATILE ORGANIC COMPOUND (VOC) LIMITS LISTED IN THE TABLE
<br />BELOW CORRESPOND TO RULE AMENDMENT DATE OF JANUARY 7, 2005.
<br />33. PAINTS AND COATINGS : APPLIED TO INTERIOR WALLS AND CEILINGS MUST
<br />NOT EXCEED THE VOLATILE ORGANIC COMPOUND (VOC) CONTENT LIMITS
<br />ESTABLISHED IN GREEN SEAL STANDARD GS-11, PAINTS, EDITION 3.2,
<br />OCTOBER 26, 2015.
<br />34. ANTI -CORROSIVE AND ANTI -RUST PAINTS; APPLIED TO INTERIOR FERROUS
<br />METAL SUBSTRATES MUST NOT EXCEED THE VOC CONTENT LIMIT OF 250 G/L
<br />ESTABLISHED IN GREEN SEAL STANDARD GC-03, ANTI -CORROSIVE PAINTS,
<br />2ND EDITION, JANUARY 7, 1997.
<br />35, CLEAR WOOD FINISHES, FLOOR COATINGS, STAINS, PRIMERS, SEALERS, AND
<br />SHELLACS: APPLIED TO INTERIOR ELEMENTS MUST NOT EXCEED THE VOC
<br />CONTENT LIMITS ESTABLISHED FOR THOSE COATING TYPES IN SOUTH COAST
<br />AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) RULE 1113, ARCHITECTURAL
<br />COATINGS, AMENDED FEBRUARY 5, 2016.
<br />Crested Crane I nteiriors
<br />Design Studio
<br />23410 18th Ave. South, Suite
<br />Des Moines, WA 98198
<br />WWW.CRESTEDCRANEINTERIORS.COM
<br />Client &Tenant:
<br />Designer:
<br />g
<br />Project Location'.
<br />OLYMPIC HOT TUB
<br />811 SE TT MALL WAY, SUITE
<br />EVERETT,
<br />Description: Date: o..
<br />PERMIT SET 02/15/2021
<br />NEW ENTRY DOOR REVISION
<br />`Join
<br />a T E
<br />A H3TOT/
<br />A
<br />#; �� n
<br />:< AWAM E :LL
<br />; TAT O W��51pt14I j 'T
<br />#m
<br />FINISH PLAN
<br />03/16/2021 1 I \
<br />rJ, .: T- TT
<br />, ME
<br />
|