Laserfiche WebLink
a 11-I Hlb 6HLL I lb NU I ° IIIb A KLL)UULL) HKIN I <br />0 <br />Q <br />I <br />�r <br />0 <br />Qo <br />i <br />0 <br />c� <br />i <br />c� <br />i <br />0 <br />0 <br />Q <br />i <br />0 <br />i <br />Q0 <br />0 <br />c0 <br />w <br />i <br />Q <br />i <br />FLOOR PLAN NOTES <br />G.u. INSTRUCTIONS <br />PRE-CONST. MEETING <br />GENERAL PROJECT NOTES <br />z <br />Q <br />' <br />LL <br />SUBMITTALS <br />z <br />1. <br />CONTRACTOR AND ARCHITECT TO REVIEW & APPROVE CHALK LINES OF PARTITION <br />1. PRIOR TO START OF CONSTRUCTION, A PRE -CONSTRUCTION MEETING IS TO BE <br />GENERAL NOTES: <br />JOB SITENOTES: <br />w <br />LAYOUT PRIOR TO COMMENCEMENT OF PARTITION CONSTRUCTION. <br />1. AT THE START OF JOB PROVIDE A SCHEDULE OF ALL ANTICIPATED SUBMITTALS <br />HELD INCLUDING A RESPONSIBLE REPRESENTATIVE OF THE ARCHITECT, THE OWNER <br />1. <br />ALL WORK SHALL BE PERFORMED SO AS TO COMPLY WITH ALL LEGAL, INDUSTRY <br />1. WHERE EXISTING TENANTS BUSINESSES ARE ADJACENT TO THE JOB SITE TENANT <br />v <br />AND DATES. FLAG SUBMITTALS WHICH ARE OR COULD BE CRITICAL PATH. FLAG <br />SUBMITTALS THAT WILL BE REQUESTED TO BE EXPEDITED FASTER THAN THE <br />AND THE GENERAL CONTRACTOR. THE DISCUSSION WILL BE IN REGARDS TO THE <br />AND PROJECT -SPECIFIC REQUIREMENTS AND STANDARDS INCLUDING WITHOUT <br />THE CONTRACTOR SHALL MINIMIZE CONSTRUCTION NOISE - EXTREMELY NOISY <br />2. <br />CONTRACTOR TO VERIFY DIMENSIONS FOR ALL PLUMBING PARTITION, <br />STANDARD 7-10 DAYS. <br />ARCHITECT -OWNER -CONTRACTOR (AOC) CORRESPONDENCE PROCESSES AND <br />LIMITATION OF THE FOLLOWING: <br />CONSTRUCTION SHALL OCCUR AT NON -TYPICAL BUSINESS HOURS. CONTRACTOR <br />PROCEDURES. AT A MINIMUM, THE FOLLOWING IS TO BE DISCUSSED: <br />SHOULD NOTIFY BUILDING REPRESENTATIVE OF SPECIAL CIRCUMSTANCES IN <br />0 <br />w <br />3. <br />EXTEND ALL STUDS AND WALL MATERIALS TO CONSTRUCTION ABOVE, U.O.N. <br />ADVANCE PRIOR TO WORK. <br />l <br />2; A SUBMITTAL LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A <br />2. AOC REGULARLY SCHEDULED MEETINGS <br />A. <br />ALL APPLICABLE BUILDING CODES <br />4. <br />ALL CONDUIT PIPING IN ELECTRICAL ROOM TO BE CONCEALED WITHIN THE WALL <br />CURRENT COPY IS TO BE INCLUDED WITH EACH SUBMISSION. <br />2.1. WHEN <br />B. <br />ALL APPLICABLE SPECIALTY CODES INCLUDING THE MOST CURRENT ISSUES AND <br />2. THE CONTRACTOR AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND <br />CONSTRUCTION. <br />2.2. WHERE <br />SUPPLEMENTS <br />SURROUNDING AREA FREE FROM DUST AND DEBRIS. THE WORK SHALL BE IN <br />5. <br />DOOR OPENINGS IN PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED WITHIN <br />3. ALL SUBMITTALS MUST BE REVIEWED AND APPROVED WITH A STAMP AND <br />2.3. HOW OFTEN <br />C. <br />THE PROJECT MANUAL AND ASSOCIATED SPECIFICATIONS <br />CONFORMANCE WITH THE AIR AND WATER POLLUTION CONTROL STANDARDS AND <br />©'-4" OF ADJACENT PERPENDICULAR PARTITION. <br />SIGNATURE BY THE GENERAL CONTRACTOR PRIOR 10 SUBMISSION. THE REVIEW <br />2.4. IN PERSON VERSUS CONFERENCE CALLS <br />D. <br />THE MANUFACTURER'S REQUIREMENTS OR RECOMMENDATIONS <br />REGULATIONS OF THE STATE DEPARTMENT OF HEALTH. <br />WILL INCLUDE BUT NOT BE LIMITED TO: <br />2.5. APPROXIMATE ALOTTED TIME PER MEETING <br />E. <br />ALL APPLICABLE LANDLORD BUILDING STANDARDS <br />01 <br />6. <br />CONTRACTOR SHALL USE 3-5/6" METAL STUDS MINIMUM AT ALL PLUMBING <br />3.1. CONFIRMING THAT THE SUBMITTAL MEETS THE REQUIREMENTS OF THE <br />3. CONSTRUCTION MEETING MINUTES <br />3. CONSTRUCTION DEBRIS AND WASTES SHALL BE DEPOSITED AT AN APPROPRIATE <br />M <br />CONTRACT DOCUMENTS. <br />SITE. THE CONTRACTOR SHALL INFORM THE BUILDING REPRESENTATIVE OF THE <br />a <br />WALLS. CONTRACTOR TO VERIFY ACTUAL DEPTH REQUIRED, ANY DISCREPANCIES <br />3.2. COORDINATION HAS TAKEN PLACE WITH ALL INTERCONNECTING TRADES <br />3.1. FORMAT FOR THE MINUTES <br />2. <br />IN USING THESE PLANS FOR BIDDING OR CONSTRUCTION PURPOSES, ALL <br />LOCATION OF DISPOSAL SITES. <br />SHALL BE REPORTED TO THE ARCHITECT. <br />3,3. THE SUBMITTAL IS COMPLETE AND COMPREHENSIVE <br />3.2. CONTRACTOR TO AUTHOR THE MINUTES <br />CONTRACTORS ARE REQUIRED TO REVIEW AND TREAT THEM AS A WHOLE IN <br />ORDER TO IDENTIFY ALL REQUIREMENTS THAT DIRECTLY OR INDIRECTLY AFFECT <br />4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF THE JOB <br />w <br />7. <br />USE WATER RESISTANT GYPSUM BOARD/FIBER BOARD AT ALL AREAS SUBJECT TO <br />4. REQUESTS ON SUBMITTALS FOR DIMENSIONS WHICH CAN BE DISCERNABLE <br />4. FORMAL CHANGES IN THE WORK <br />THEIR PORTION OF THE WORK, EVEN REQUIREMENTS LOCATED IN SECTIONS <br />AFTER ITS COMPLETION. WHERE APPLICABLE, CLEANING SHALL INCLUDE, BUT <br />F <br />MOISTURE OR WHERE TILE IS USED. <br />THROUGH MATHEMATICAL MEANS FROM INFORMATION ALREADY PROVIDED ON THE <br />4.1. ADDENDA AND BULLETINS ISSUED BY THE ARCHITECT <br />DESIGNATED AS APPLICABLE TO OTHER TRADES OR IN DOCUMENTS PROVIDED BY <br />NOT BE LIMITED TO, THE EXTERIOR AND THE INTERIOR OF THE BUILDING, THE <br />z <br />CONTRACT DOCUMENTS WILL NOT BE PROVIDED. <br />4.2. CHANGE ORDER REQUESTS ISSUED BY THE CONTRACTOR <br />OTHER MEMBERS OF THE PROJECT DESIGN TEAM. UNLESS EXPRESSLY PROVIDED <br />PATH OF TRAVEL TO THE JOB SITE, PARKING LOTS, ELEVATORS, LOBBIES, AND <br />w <br />8. <br />ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH LOCAL AND NATIONAL <br />4.3. CHANGE ORDERS ISSUED BY THE CONTRACTOR <br />OTHERWISE, THE INTENT IS TO INCLUDE ALL LABOR, MATERIALS, PRODUCTS AND <br />CORRIDOR CARPETS. <br />CODES. <br />5. SUBMITTALS NOT REQUESTED BY THE CONTRACT DOCUMENTS MAY OR MAY NOT <br />4.4. TRACKING MECHANISMS <br />SERVICES NECESSARY OR APPROPRIATE FOR THE COMPLETED PROJECT AS <br />BE REVIEWED AT THE DESIGN TEAMS DISCRETION. <br />CALLED FOR OR REASONABLY IMPLIED FROM THE PLANS AND SPECIFICATIONS <br />5, THE CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION, WHERE REQUIRED <br />9. <br />ALL HOT WATER LINES SHALL BE PROPERLY INSULATED. SEE PLUMBING <br />5. REQUESTS FOR INFORMATION PROCESS <br />PROVIDED BY THE PROJECT'S DESIGN TEAM. IN CASE OF CONFLICTS OR <br />PER STATE AND LOCAL CODES. <br />DRAWINGS. <br />5.1. TRACKING MECHANISM <br />OMISSIONS, THE AFFECTED CONTRACTOR IS REQUIRED TO EITHER OBTAIN <br />m <br />6. SUBMITTALS ARE TO BE ROUTED THROUGH THE ARCHITECT AND ARE NOT TO BE <br />5.2. DEFINE Cc: RECIPIENT LIST <br />DIRECTION FROM AN APPROPRIATE REPRESENTATIVE OF THE OWNER, OR <br />6. IF TRENCHES OR EXCAVATIONS 5'-0" OR MORE IN DEPTH ARE REQUIRED, OBTAIN <br />10. <br />- <br />ALL PLUMBING CLEAN OUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE. <br />SENT DIRECTLY TO ARCHITECT'S CONSULTANTS UNLESS SPECIFICALLY AUTHORIZED <br />5.3. STANDARD RESPONSE TIMES (2-5 WORKING DAYS IS STANDARD) <br />OTHERWISE TO APPLY THE MORE STRINGENT OR COSTLY STANDARD. <br />ISSUANCE OF A BUILDING OR GRADING PERMIT. <br />J <br />CONTRACTOR SHALL COORDINATE ALL CLEAN -OUT LOCATIONS WITH EQUIPMENT, <br />BY THE ARCHITECT. <br />AND CABINETS. SUBMIT A PLAN OF ALL PROPOSED LOCATIONS TO ARCHITECT <br />6. SUBMITTAL PROCESS <br />3. <br />IN INTERPRETING THESE PLANS, THE FOLLOWING GENERAL RULES APPLY: <br />7. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED WITHIN THE BUILDING <br />FOR APPROVAL PRIOR TO INSTALLATION. <br />6.1. TRACKING MECHANISM <br />WHICH DOES NOT COMPLY WITH THE LOCAL FIRE AUTHORITY AND STATE & <br />11. <br />ALL MILLWORK SHALL CONFORM TO STATE & LOCAL WOODWORKING STANDARDS. <br />7. MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAM'S <br />6.2. ISSUANCE SCHEDULE BY THE CONTRACTOR <br />6.3. DEFINE Cc RECIPIENT LIST <br />A. <br />WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DRAWINGS <br />COUNTY REQUIREMENTS. <br />REVIEW. IF A CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR <br />6.4. STAMPED REVIEWED AND APPROVED BY CONTRACTOR PRIOR TO SUBMISSION <br />B. <br />SPECIFIC NOTES DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES <br />6. CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING OFF SUPPLY AND RETURN <br />12. <br />FIELD MEASURE AS REQUIRED FOR ALL MILLWORK CONDITIONS PRIOR TO <br />SCHEDULE, THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW <br />6.5. NON -REQUESTED SUBMITTALS MAY NOT BE REVIEWED <br />.AND <br />AND TYPICAL DETAILS <br />AIR GRILLES, DIFFUSERS & DUCTS TO KEEP DUST FROM ENTERING INTO BUILDING <br />r <br />FABRICATION. <br />AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING. <br />6.6. STANDARD RESPONSE TIMES (7-10 WORKING DAYS IS STANDARD) <br />C. <br />WORK NOT PARTICULARLY SHOWN OR SPECIFIED SHALL BE THE SAME AS <br />AIR DISTRIBUTION SYSTEMS. <br />a <br />SIMILAR PARTS THAT ARE SHOWN AND SPECIFIED <br />13. <br />CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR ARCHITECT AND TENANT <br />7. SUBSTITUTIONS <br />D. <br />WORK SHOWN AS "NIC" IS FOR REFERENCE ONLY AND THE RESPONSIBILITY OF <br />9. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE <br />U) <br />APPROVAL PRIOR TO MANUFACTURE OF ANY CABINET WORK, MILLWORK AND ANY <br />7.1. REQUEST FORMS WITH REASONS AND BENEFIT FOR SUBSTITUTION <br />THE CONTRACTOR ONLY TO THE EXTENT THAT THIS WORK MAY REQUIRE SOME <br />SAFETY OF THE OCCUPANTS AND WORKERS AT ALL TIMES. <br />OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATED WORK. <br />REQUESTS FOR INFORMATION (RFI's) <br />REASONABLE PROTECTION OR COORDINATION EFFORTS. <br />w <br />1. THE GENERAL CONTRACTOR IS TO REVIEW ALL PROSPECTIVE RFI's AND MAKE 6° PAYMENT APPLICATIONS W. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE F <br />14. CONTRACTOR TO VERIFY FINAL LOCATION FOR CANTILEVERED COUNTERS AND <br />EVERY EFFORT TO ANSWER THEM BEFORE SUBMITTING TO THE DESIGN TEAM. <br />6.1. PROCESS <br />BUILDING AND SITE WHILE JOB IS IN PROGRESS AND UNTIL THE JOB IS <br />z <br />IN -WALL SUPPORT BRACKETS PRIOR 10 GYPSUM BOARD FINISHING OF WALLS. <br />5.2. SUBMITTAL DATE <br />COMPLETED. <br />ALL FINAL INSTALLATION HEIGHTS FOR IN -WALL SUPPORT BRACKETS MUST MEET <br />5.3. ANTICIPATED TURN -AROUND <br />4. THESE PLANS AND SPECIFICATIONS ARE INTENDED TO REPRESENT ONLY THE <br />ALL ACCESSIBILITY CODES REQUIREMENTS WITH COUNTERTOP MATERIAL THICKNESS <br />2. MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAMS <br />FINISHED CONSTRUCTION. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL <br />INCLUDED. <br />REVIEW. IF A CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR <br />9, PUNCH LISTS <br />CONSTRUCTION AND DEMOLITION MEANS, METHODS, TECHNIQUES, SEQUENCES AND <br />DRAWING NOTES: <br />W <br />15. PROVIDE AND INSTALL ALL NECESSARY WALL BACKING, STIFFENERS, BRACING, <br />SCHEDULE, THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW <br />9°1° ONLY ONE PUNCH WALK TO BE PROVIDED BY DESIGN TEAM <br />9.2. CONTRACTOR TO PUNCH AND MAKE CORRECTIONS OR CREATE A MINIMAL <br />PROCEDURES INCLUDING .ANY AND ALL SAFETY PRECAUTIONS AND PROGRAMS; <br />� <br />BACK-UP PLATES AND OR SUPPORTING BRACKETS AS REQUIRED FOR THE <br />/ <br />AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING. <br />LIST OF CORRECTIONS PRIOR TO DESIGN TEAM PUNCH. <br />AND SHALL INDEMNIFY TO THE FULLEST EXTENT ALLOWED BY LAW THE OWNER <br />1. UNLESS OTHERWISE NOTED OR INDICATED, ALL DIMENSIONS ON THESE DOCUMENTS <br />AND THE PROJECT DESIGN TEAM FROM AND AGAINST ANY AND ALL RELATED <br />SHALL BE TO FACE OF CURB, FACE OF CONCRETE OR MASONRY, FACE OF FINISH <br />N <br />INSTALLATION OF WALL -MOUNTED OR SUSPENDED EQUIPMENT OR BUILT-IN ITEMS. <br />9.3. A FINAL WALK WILL OCCUR ONLY IF THE ARCHITECT IS CONTRACTED TO DO <br />CLAIMS AND LIABILITY. <br />OR CEN IERLINE OF GRIDS. <br />VERIFY REQUIREMENTS WITH MANUFACTURERS PRIOR TO INSTALLATION. SUPPLY <br />SO, <br />e <br />CATALOG CUT SHEETS FOR ARCHITECT'S APPROVAL. <br />3. AN RFI LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A <br />CURRENT COPY IS TO BE INCLUDED WITH EACH RFI SUBMISSION ALONG WITH ANY <br />5. THESE PLANS AND SPECIFICATIONS ARE INTENDED TO SET FORTH THE <br />2. ALL VERTICAL DIMENSIONS SHOWN ARE FROM FLOOR SLAB, U.O.N. <br />`" <br />CRITICAL RESPONSE DUE DATES. <br />REQUIREMENTS FOR CONSTRUCTION IN ONLY AN INDUSTRY -STANDARD LEVEL OF <br />16. PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL CONNECTIONS AND PLUMBING <br />SUPPLY, FITTINGS & CONNECTORS TO COMPLETE INSTALLATION OF APPLIANCES & <br />FIRE AU'l--HORITY <br />NOTES <br />QUALITY AND DETAIL, AND THEY ARE INTENDED TO BE SUPPLEMENTED BY <br />APPROPRIATE REQUESTS FOR INFORMATION (RFIs). ERRORS AND OMISSIONS ARE <br />3. DIMENSIONS SHOWN IN FIGURES TAKE PRECEDENCE OVER DIMENSIONS SCALED <br />FROM DRAWINGS. LARGE SCALE DRAWINGS AND DETAILS TAKE PRECEDENCE OVER <br />EQUIPMENT INDICATED ON PLAN. VERIFY REQUIREMENTS WITH MANUFACTURERS <br />4. RFI's REGARDING METHODS AND MEANS OF CONSTRUCTION WILL NOT BE REVIEWED <br />TO BE EXPECTED AND ANTICIPATED, AND ALL CONTRACTORS ARE REQUIRED TO <br />SMALLER SCALE DRAWINGS. <br />PRIOR TO INSTALLATION. SUPPLY CATALOG CUT SHEETS FOR ARCHITECT'S <br />AND WILL BE REMOVED FROM THE RFI LOG, <br />CAREFULLY REVIEW THESE PLANS FOR ERRORS AND OMISSIONS AND TO BRING <br />APPROVAL. <br />THESE ERRORS AND OMISSIONS TO THE ATTENTION OF AN APPROPRIATE OWNER <br />4. THE TERM "ALIGN", AS USED IN THESE DOCUMENTS, SHALL MEAN TO <br />U) <br />1. FINAL INSPECTION BY FIRE DEPARTMENT IS REQUIRED - SCHEDULE 72 HOURS IN <br />REPRESENTATIVE IN A TIMELY MANNER; AND ANY CONTRACTOR WHO FAILS TO DO <br />ACCURATELY LOCATE FINISHES IN THE SAME PLANE <br />17. EXACT LOCATION OF FIRE EXTINGUISHER CABINETS TO BE CONFIRMED WITH <br />GRANGE ORDERS <br />ADVANCE. <br />SO BEFORE BIDDING OR OTHERWISE PROCEEDING ASSUMES THE RISK OF ANY <br />ARCHITECT BEFOP£ INS I ALLATION PROVIDE ADDITIONAL FIRE EXTINGUISHERSG <br />CONSEQUENCES <br />9, „ <br />ui <br />1. A COMPLETE SCHEDULE OF VALUES OF THE BASE CONTRACT IS TO BE PROVIDED 5. TYPICAL AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS z <br />CABINETS AS REQUIRED BY THE FIRE DEPARTMENT FIELD INSPECTORS, <br />TO THE OWNER AND ARCHITECT PRIOR TO THE START OF ANY WORK. <br />2. <br />THE PROJECT ADDRESS SHALL BE PROVIDED FOR ALL NEW AND EXISTING <br />THE SAME OR REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT, <br />w <br />BUILDINGS IN A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE <br />U.O.N. <br />W <br />18. <br />CONTRACTOR TO VERIFY LOCATION OF ALL THERMOSTATS WITH ARCHITECT PRIOR <br />STREET OR ROAD FRONTING THE PROPERTY PER LOCAL FIRE DEPARTMENT <br />6. <br />SCALED DIMENSIONS SHOULD BE CONSIDERED ONLY APPROXIMATE; AND IN ANY <br />TO INSTALLATION. <br />ALL CHANGE ORDER REQUESTS ARE TO BE REVIEWED AND APPROVED BY THE <br />STANDARDS. <br />EVENT ALL CONTRACTORS PROCEED AT THEIR OWN RISK IF THEY FAIL TO VERIFY <br />6. <br />"" <br />DETAILS ARE USUALLY KEYED AND NOTED "TYPICAL" ONLY ONCE, WHEN THEY <br />w <br />OWNER AND ARCHITECT PRIOR TO SUBMISSION OF A CHANGE ORDER. <br />AND FIELD MEASURE DIMENSIONS BEFORE PROCEEDING WITH ANY AFFECTED <br />FIRST OCCUR AND ARE REPRESENTATIVE OF ALL SIMILAR CONDITIONS <br />19. <br />ALL EXITS SHALL HAVE EXIT SIGNS AND ALL BLIND CORRIDOR TURNS SHALL <br />3. <br />AN UNOBSTRUCTED ALL-WEATHER FIRE APPARATUS ACCESS ROAD SHALL BE IN <br />PROCUREMENT, FABRICATION OR CONSTRUCTION. <br />THROUGHOUT, U.O.N. <br />-' <br />HAVE DIRECTIONAL EXIT SIGNS. <br />PLACE PRIOR TO DELIVERY OF COMBUSTIBLE BUILDING MATERIALS TO THE SI <br />20. <br />PREPARE ALL FLOOR SURFACES AS REQUIRED TO RECEIVE FINISHES AS NOTED <br />3. <br />CHANGE ORDER REQUESTS ARE TO INCLUDE A COMPLETE BREAKDOWN BY TRADE <br />4. <br />FIRE PREVENTION WATER SERVICE SHALL BE IN SERVICE PRIOR TO DELIVERY OF <br />7. <br />PLANS ARE TO DE CONSIDERED DIAGRAMMATIC IN NATURE AND INTENDED ONLY <br />7. <br />COLUMN CENTERLINES (GRID LINES) ARE SHOWN FOR DIMENSIONING PURPOSES. <br />V) <br />o <br />ON FINISH PLAN, ENLARGED FINISH PLANS & FINISH LEGEND. <br />ALONG WITH TRADE BACK-UP AND UNIT PRICING WHERE APPLICABLE. <br />COMBUSTIBLE BUILDING MATERIALS TO THE SITE. <br />TO DEMONSTRATE THE RELATIONSHIP AMONG COMPONENT PARTS, AND NOT TO <br />S. <br />WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF <br />to <br />21. <br />UNLESS OTHERWISE NOTED, ALL GYPSUM BOARD SURFACES, WALLS, AND CEILINGS <br />4. <br />A CHANGE ORDER REQUEST AND CHANGE ORDER LOG IS TO BE MAINTAINED BY <br />5. <br />ACCESS GATES SHALL BE APPROVED PRIOR TO INSTALLATION AND SHALL BE IN <br />DEPICT SPECIFIC LOCATIONS.. <br />THE WORK, THE DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK IN <br />� <br />, , FINISH, SO AS TO RECEIVE <br />SHALL BE TAPED, SANDED SMOOTH TO ALEVEL 4 <br />THE GENERAL CONTRACTOR AND SUBMITTED ALONG WITH EACH CHANGE ORDER <br />COMPLIANCE WITH LOCAL FIRE AUTHORITY <br />8. <br />CONTRACTOR RFI's ARE INTENDED TO OBTAIN INFORMATION NOT AVAILABLE FROM <br />THE SAME BUILDING. <br />� <br />PAINT OR WALL COVERING MATERIAL <br />REQUEST. <br />THE PLANS AND SPECIFICATIONS. RFI's WILL NOT BE PROCESSED THAT CAN BE <br />6, <br />FIRE SPRINKLER SYSTEM(S) SHALL MEET STATE & LOCAL FIRE CODES AND BE <br />ANSWERED BY A REVIEW OF THESE DOCUMENTS, THAT REQUEST DIMENSIONS <br />INTERIOR <br />/ EXTERIOR NOTES: <br />3: <br />22. <br />PROVIDE SOUND INSULATION AT PERIMETER WALLS OF RESTROOMS, LOBBY, <br />PROVIDED TO PROTECT ENTIRE BUILDING INCLUDING PROJECTIONS OVER 4'-0" <br />THAT CAN BE OBTAINED FROM THE PLANS BY MATHEMATICAL CALCULATION THAT <br />STAIRS, AND ACROSS CEILING OF RESTROOMS TO CREATE AN ACOUSTIC <br />PROJECT SCHEDULE <br />AND SPRAY BOOTH. <br />ARE IN EFFECT A SUBSTITUTION SUBMITTAL, OR THAT SEEK DIRECTION <br />1. <br />WHERE ELECTRICAL, MECHANICAL AND/OR PLUMBING ITEMS, SUCH AS LIGHTS, <br />� <br />ENVELOPE, U.O.N. <br />1. <br />A COMPLETE CONSTRUCTION SCHEDULE OF ALL PORTIONS OF THE WORK TO BE <br />CONCERNING CONSTRUCTION MEANS AND METHODS OR SAFETY PRECAUTIONS. <br />DUCTS, PIPING, DOWNSPOUTS, ETC. ARE TO PENETRATE ANY BUILDING FOOTINGS, <br />J <br />PROVIDED TO THE OWNER AND ARCHITECT PRIOR TO START OF ANY WORK. <br />7. <br />FIRE SPRINKLER SYSTEM(S) AND ALL CONTROL VALVES, INCLUDING EXTERIOR <br />= <br />WHERE APPROPRIATE, RFI's SHOULD BE SPECIFIC AS TO WHICH PORTION OF THE <br />SLABS, FLOORS, STRUCTURAL FRAMING, WALL PARTITIONS, CEILINGS, ETC., IT 15 <br />< <br />23. <br />PATCH AND FILL VARIOUS OPENINGS AT EXISTING GYPSUM BOARD PARTITIONS <br />SHALL BE SUPERVISED BY A U.L. LISTED CENTRAL ALARM STATION OR PER <br />PLANS AND SPECIFICA I IONS NEEDS CLARIFICATION, AND WHAT INFORMATION IS <br />REQUIRED THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE <br />Q <br />AND SOFFITS FOLLOWING .REMOVAL OR INSTALLATION OF ANY SURFACE MOUNTED <br />STATE & LOCAL FIRE CODES. <br />REQUIRED. <br />FURNISHED. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF .ALL ITEMS <br />� <br />OR RECESSED FURNISHINGS, RECEPTACLES, UTILITY PIPING, SHELF STANDARDS & <br />2. <br />THE SCHEDULE SHALL NOT EXCEED TIME LIMITS CURRENT UNDER THE CONTRACT <br />WITH THE CONSTRUCTION DOCUMENTS PRIOR TO THE INSTALLATION OF <br />ALL OTHER SIMILAR ELEMENTS INDICATED TO BE REMOVED DURING THE <br />DOCUMENTS. <br />6. <br />ALL VALVES CONTROLLING THE WATER. SUPPLY FOR AUTOMATIC SPRINKLER <br />9. <br />NO DEVIATIONS OR OMISSIONS FROM THE REQUIREMENTS OF THE PLANS AND <br />STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL WORK. ANY CONFLICT OR <br />DEMOLITION PHASE OR INSTALLED DURING THE CONSTRUCTION PHASE: TAPE AND <br />SYSTEMS AND WATER -FLOW SWITCHES ON ALL SPRINKLER SYSTEMS SHALL DE <br />_ <br />SPECIFICATIONS PROVIDED BY THE PROJECTS DESIGN TEAM ARE ALLOWED <br />DISCREPANCY WITHIN CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE <br />SEAL ALL SEAMS WITH JOINT COMPOUND: APPLY NEW FINISH TO MATCH EXISTING <br />ELECTRICALLY MONITORED WHERE THE NUMBER OF SPRINKLERS IS (100) OR <br />WITHOUT THE EXPRESSED AUTHORIZATION OF AN APPROPRIATE OWNER <br />ARCHITECT'S ATTENTION FOR CLARIFICATION. <br />W <br />FINISH AT ADJACENT GYPSUM BOARD SURFACES AND FEATHER. NEW FINISH WITH <br />3. <br />THE SCHEDULE SHALL BE REVISED AT APPROPRIATE INTERVALS AS REQUIRED BY <br />MORE. <br />REPRESENTATIVE, AND THE RESPONSIBLE CONTRACTOR WILL INDEMNIFY AND HOLD <br />EXISTING FINISH TO PROVIDE CONSISTENT & CONTINUOUS FINISH. <br />THE CONDITIONS OF THE WORK AND PROJECT AND THE CONTRACTOR SHALL <br />HARMLESS THE OWNER AND THE PROJECT DESIGN TEAM FROM AND AGAINST THE <br />2. <br />CONTRACTOR, ALONG WITH MECHANICAL CONTRACTOR, SHALL PROVIDE AND <br />< <br />NOTIFY THE OWNER AND ARCHITECT IF FOR ANY REASON THE SCHEDULE IS <br />9. <br />ELECTRICAL SUBCONTRACTORS TO INSTALL WIRING FOR FIRE SPRINKLER, ALARM <br />CONSEQUENCES OF ANY UNAUTHORIZED DEVIATIONS OR OMISSIONS. SUBSTITUTION <br />LOCATE ACCESS DOORS/PANELS IN WALL & CEILING CONSTRUCTION AS REQUIRED <br />EXTENDED. <br />BELL AND TELEPHONE WARNING AS REQUIRED BY FIRE DEPARTMENT. <br />SUBMITTALS WILL BE CONSIDERED ONLY IF THE PROPOSED SUBSTITUTION <br />TO PROVIDE ACCESS TO MECHANICAL, FIRE SPRINKLER, PLUMBING & ELECTRICAL <br />IMPROVES THE QUALITY OF THE PROJECT TO THE OWNER; AND IN NO EVENT WILL <br />WORK. CONTRACTOR SHALL SUBMIT A PLAN OF ALL PROPOSED ACCESS PANEL <br />x <br />4. <br />A THREE WEEK LOOK -AHEAD SHALL BE REVIEWED REGULARLY AT EACH AOC <br />10. <br />INSTALLATION OF FIRE ALARM SYSTEMS SHALL BE IN ACCORDANCE WITH STATE & <br />THE OWNER BE REQUIRED TO AUTHORIZE A SUBSTITUTION THAT IS NOT EQUAL IN <br />LOCATIONS TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. <br />w <br />MEETING WHICH WILL BE IN -LINE WITH THE OVERALL CONSTRUCTION SCHEDULE. <br />LOCAL FIRE CODES. <br />QUALITY TO WHAT IS SPECIFIED. <br />� <br />3. <br />ALL PENETRATIONS AT RATED CONSTRUCTION SHALL BE PROTECTED TO MAINTAIN <br />11. <br />COMPLETE PLANS AND SPECIFICATIONS FOR ALL FIXED FIRE PROTECTION <br />10. <br />DESIGN/BUILD CONTRACTOR SUBMITTALS WILL BE REVIEWED BY THE PROJECT <br />RATING. <br />W <br />EQUIPMENT INCLUDING AUTOMATIC SPRINKLERS AND OTHER FIRE -PROTECTION <br />DESIGN TEAM, IF AT ALL, ONLY FOR CONFORMANCE WITH THE AESTHETIC <br />SYSTEMS, SHALL BE SUBMITTED BY INSTALLING CONTRACTOR. SUCH PLANS <br />ASPECTS AND MAJOR SPACE LIMITATIONS OF THE PROJECT; AND EACH <br />4. <br />WHERE OCCURS, CONTRACTOR SHALL PATCH ANY EXISTING WALLS AND/OR <br />>_ <br />DESIGN <br />BUILD <br />NOTESSHALL <br />BE APPROVED BY LOCAL FIRE AUTHORITY PRIOR TO INSTALLATION. <br />DESIGN/BUILD CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: <br />CEILINGS AS NEEDED TO REFURBISH THE LEASE SPACE AND REPAIR ALL <br />DAMAGES CAUSED BY CONTRACTOR. <br />e <br />z <br />0 <br />12 LOCATIONS AND CLASSIFICATIONS OF FIRE EXTINGUISHERS SHALL BE IN A PREPARING ALL THE ENGINEERING AND OTHER DRAWI GS AND SPECIFICATIONS <br />ACCORDANCE WITH STATE & LOCAL FIRE CODES AND PLACEMENT IS SUBJECT TO <br />N <br />FOR THE COMPONENTS OF ITS DESIGN/BUILD UNDERTAKING. <br />5. INTERIOR WALLS AND CEILINGS SHALL BE INSTALLED IN ACCORDANCE TO STATE & <br />THE APPROVAL OF THE FIRE INSPECTOR. VERIFY QUANTITY & EXACT LOCATION <br />D. <br />COMPLYING WITH THE PROJECT'S REQUIREMENTS AND SPACE LIMITATIONS. <br />LOCAL CODES, INCLUDING REQUIREMENTS FOR FLAME SPREAD AND SMOKE <br />1. LIGHT SWITCHES SHALL BE INSTALLED AT +48" A.F.F. MULTIPLE SWITCHES <br />FROM FIRE DEPARTMENT PRIOR TO ORDERING. <br />C. <br />COORDINATION AND INTERFACING WITH OTHER TRADES AND CONSULTANTS. <br />DENSITY RATINGS FOR FINISH MATERIALS. <br />SHOULD BE GANGED TOGETHER UNLESS OTHERWISE SPECIFIED. <br />D. <br />OBTAINING ANY REQUIRED OR APPROPRIATE APPROVALS FROM AUTHORITIES <br />13. AT LEAST ONE (1) FIRE EXTINGUISHER WITH A MINIMUM RATING OF: <br />HAVING JURISDICTION OVER THE PROJECT. <br />6. WHEN USED ALL NOISE BARBS SAND INSULATION <br />_ BARRIER AIT(SOUND INSULATION) <br />J <br />2. CONTRACTOR TO VERIFY ALL SWITCH LOCATIONS WITH THE ARCHITECT PRIOR TO <br />2-A-10B: C (FOR OFFICE), OR 10--A--808: C (FOR WAREHOUSE), SHALL BE <br />E. <br />HAVING THEIR DESIGN CONSULTANTS SERVE AS THE PROFESSIONAL OF RECORD <br />BAITS SHALL BE NONCOMBUSTIBLE AND SHALL NOT CONTAIN OR UTILIZE <br />INSTALLATION. NUMBER OF SWITCHES FOR OPEN AREA IS BIDDER. DESIGN. <br />PROVIDED WITHIN 75'-0" MAXIMUM TRAVEL DISTANCE FOR EACH 3,000 SQUARE <br />FOR THE PORTIONS OF WORK WHICH THEY DESIGN. <br />OZONE DEPLETING COMPOUNDS. <br />Cn <br />a <br />SWITCHES INDICATED ON THE DRAWINGS FOR OPEN AREA ARE FOR REFERENCE <br />FEET OR PORTION THEREOF ON EACH FLOOR. <br />a <br />ONLY. <br />11. <br />AT THE OF THE CONSTRUCTION, PRIME CONTRACTOR SHALL <br />7. ALL NEW CONSTRUCTION MATERIALS SHALL BE 100 ASBESTOS -FREE. <br />14. STORAGE, DISPENSING OR USE OF ANY FLAMMABLE AND COMBUSTIBLE LIQUIDS, <br />.CONCLUSION .EACH <br />PROVIDE SUCH WRITTEN CERTIFICATION THAT THE CONSTRUCTION HAS BEEN <br />� <br />0 <br />3. CONTRACTOR SHALL PROVIDE SEISMIC BRACING AT ALL NEW AND RELOCATED <br />FLAMMABLE AND COMPRESSED GASES, AND OTHER HAZARDOUS MATERIALS SHALL <br />PERFORMED IN COMPLIANCE WITH THE PROJECT'S APPROVED PLANS AND <br />e <br />LIGHT FIXTURES. <br />COMPLY WITH STATE & LOCAL FIRE CODES. THE STORAGE AND USE OF <br />SPECIFICATIONS AS THE BUILDING OFFICIAL WITH JURISDICTION OVER THE PROJECT <br />HAZARDOUS MATERIALS SHALL BE APPROVED BY THE FIRE AUTHORITY PRIOR TO <br />MAY REQUIRE, OR AS THE _OWNER MAY REASONABLY REQUEST. <br />Q <br />4. CONTRACTOR SHALL VERIFY AND PROVIDE A COMPLETE HVAC SYSTEM WHICH <br />ANY MATERIALS BEING STORED OR USED ON SITE. A SEPARATE PLAN SUBMITTAL <br />CONFORMS TO THE OWNER'S HVAC SPECIFICATIONS. CONTRACTOR SHALL BE <br />IS REQUIRED PRIOR TO THE STORAGE AND USE OF HAZARDOUS MATERIALS. <br />12. <br />VERSIONS OF THESE PLANS PROVIDED IN ANY ELECTRONIC FORM ARE SUBJECT <br />0 <br />RESPONSIBLE FOR ALL ROOF PENETRATIONS AND PATCHING, ANY SCREENING OF <br />TO THE SAME PROVISION AS THE OTHER INSTRUMENTS OF SERVICE PREPARED BY <br />ROOF -MOUNTED MECHANICAL UNIT REQUIRED BY GOVERNING JURISDICTION. <br />15. BUILDING(S) NOT APPROVED FOR HIGH -PILED STOCK (MATERIALS IN CLOSELY <br />OR ON BEHALF OF THE PROJECT DESIGN TEAM, INCLUDING WITHOUT LIMITATION <br />PACKED PILES OR ON PALLETS, ORIN RACKS WHERE THE TOP OF STORAGE <br />THEIR COMMON LAW, STATUTORY OR OTHER RESERVED RIGHTS, INCLUDING <br />EXCEEDS 12'-0" IN HEIGHT, AND 6H -0 FOR GROUP A PLASTICS AND CERTAIN <br />COPYRIGHTS. A RECIPIENT IS GRANTED AT MOST A TRANSFERABLE <br />OTHER HIGH -HAZARD COMMODITIES). HIGH -PILED STOCK SHALL BE APPROVED <br />NONEXCLUSIVE LICENSE TO REUSE THE PLANS SOLELY FOR PROJECT PURPOSES; <br />BY THE FIRE AUTHORITY PRIOR TO MATERIALS BEING STORED ON SITE. A <br />AND NO RECIPIENT IS AUTHORIZED TO USE OR TO ALLOW THE USE OF ALL OR <br />< <br />SEPARATE PLAN SUBMITTAL IS REQUIRED FOR HIGH -PILED STORAGE IN <br />ANY PORTION OF THESE PLANS FOR ANY OTHER PURPOSE, AND ANY OTHER USE <br />ACCORDANCE WITH STATE & LOCAL FIRE CODES. <br />FOR ANY OTHER PURPOSE COULD CONSTITUTE ACTIONABLE PLAGIARISM. ANY <br />ui <br />ELECTRONIC DOCUMENTS WILL BE PROVIDED IN THE RESPONSIBLE DESIGN _ <br />16. A LETTER OF INTENDED USE MAY BE REQUIRED BY THE FIRE INSPECTOR. PROFESSIONAL'S STANDARD FORMATS AND CONVENTIONS AND WITH NO w <br />GUARANTEE OF THE ABSENCE OF VIRUSES OR OTHER HARMFUL MATERIAL, OR OF PA / PM: I. CONNOR <br />17. ALL REQUIRED FIRE DOORS SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY COMPATIBILITY WITH ANY RECIPIENT'S SOFTWARE OR HARDWARE SO THAT ANY a <br />SHOWING THE SPECIFIC RATING. USE WITH OR CONVERSION TO THE OTHER FORMS OR CONVENTIONS, OR THE USE DRAWN BY: P.C.P. <br />WITH ANY PARTICULAR SOFTWARE OR HARDWARE, IS AT THE RECIPIENT'S SOLE <br />16. EXIT SIGNS AND ILLUMINATION SHALL CONFORM TO ALL APPLICABLE BUILDING RISK. v JOB NO.: SEA19-6064®00 <br />AND FIRE CODES. <br />W <br />a_ <br />SYSTEM PER APPLICABLE CODES INCLUDING IF NECESSARY FIR HORNS, STROBE 4 <br />LIGHTS, CONTROL PANEL CONNECTIONS, SMOKE DETECTORS, AUDIO VISUAL <br />ALARMS. SUBMIT SHOP DRAWINGS TO THE FIRE MARSHAL FOR APPROVAL. <br />