<br />FLOOR PLAN NOTES
<br />G.u. INSTRUCTIONS
<br />PRE-CONST. MEETING
<br />GENERAL PROJECT NOTES
<br />z
<br />Q
<br />'
<br />LL
<br />SUBMITTALS
<br />z
<br />1.
<br />CONTRACTOR AND ARCHITECT TO REVIEW & APPROVE CHALK LINES OF PARTITION
<br />1. PRIOR TO START OF CONSTRUCTION, A PRE -CONSTRUCTION MEETING IS TO BE
<br />GENERAL NOTES:
<br />JOB SITENOTES:
<br />w
<br />LAYOUT PRIOR TO COMMENCEMENT OF PARTITION CONSTRUCTION.
<br />1. AT THE START OF JOB PROVIDE A SCHEDULE OF ALL ANTICIPATED SUBMITTALS
<br />HELD INCLUDING A RESPONSIBLE REPRESENTATIVE OF THE ARCHITECT, THE OWNER
<br />1.
<br />ALL WORK SHALL BE PERFORMED SO AS TO COMPLY WITH ALL LEGAL, INDUSTRY
<br />1. WHERE EXISTING TENANTS BUSINESSES ARE ADJACENT TO THE JOB SITE TENANT
<br />v
<br />AND DATES. FLAG SUBMITTALS WHICH ARE OR COULD BE CRITICAL PATH. FLAG
<br />SUBMITTALS THAT WILL BE REQUESTED TO BE EXPEDITED FASTER THAN THE
<br />AND THE GENERAL CONTRACTOR. THE DISCUSSION WILL BE IN REGARDS TO THE
<br />AND PROJECT -SPECIFIC REQUIREMENTS AND STANDARDS INCLUDING WITHOUT
<br />THE CONTRACTOR SHALL MINIMIZE CONSTRUCTION NOISE - EXTREMELY NOISY
<br />2.
<br />CONTRACTOR TO VERIFY DIMENSIONS FOR ALL PLUMBING PARTITION,
<br />STANDARD 7-10 DAYS.
<br />ARCHITECT -OWNER -CONTRACTOR (AOC) CORRESPONDENCE PROCESSES AND
<br />LIMITATION OF THE FOLLOWING:
<br />CONSTRUCTION SHALL OCCUR AT NON -TYPICAL BUSINESS HOURS. CONTRACTOR
<br />PROCEDURES. AT A MINIMUM, THE FOLLOWING IS TO BE DISCUSSED:
<br />SHOULD NOTIFY BUILDING REPRESENTATIVE OF SPECIAL CIRCUMSTANCES IN
<br />0
<br />w
<br />3.
<br />EXTEND ALL STUDS AND WALL MATERIALS TO CONSTRUCTION ABOVE, U.O.N.
<br />ADVANCE PRIOR TO WORK.
<br />l
<br />2; A SUBMITTAL LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A
<br />2. AOC REGULARLY SCHEDULED MEETINGS
<br />A.
<br />ALL APPLICABLE BUILDING CODES
<br />4.
<br />ALL CONDUIT PIPING IN ELECTRICAL ROOM TO BE CONCEALED WITHIN THE WALL
<br />CURRENT COPY IS TO BE INCLUDED WITH EACH SUBMISSION.
<br />2.1. WHEN
<br />B.
<br />ALL APPLICABLE SPECIALTY CODES INCLUDING THE MOST CURRENT ISSUES AND
<br />2. THE CONTRACTOR AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND
<br />CONSTRUCTION.
<br />2.2. WHERE
<br />SUPPLEMENTS
<br />SURROUNDING AREA FREE FROM DUST AND DEBRIS. THE WORK SHALL BE IN
<br />5.
<br />DOOR OPENINGS IN PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED WITHIN
<br />3. ALL SUBMITTALS MUST BE REVIEWED AND APPROVED WITH A STAMP AND
<br />2.3. HOW OFTEN
<br />C.
<br />THE PROJECT MANUAL AND ASSOCIATED SPECIFICATIONS
<br />CONFORMANCE WITH THE AIR AND WATER POLLUTION CONTROL STANDARDS AND
<br />©'-4" OF ADJACENT PERPENDICULAR PARTITION.
<br />SIGNATURE BY THE GENERAL CONTRACTOR PRIOR 10 SUBMISSION. THE REVIEW
<br />2.4. IN PERSON VERSUS CONFERENCE CALLS
<br />D.
<br />THE MANUFACTURER'S REQUIREMENTS OR RECOMMENDATIONS
<br />REGULATIONS OF THE STATE DEPARTMENT OF HEALTH.
<br />WILL INCLUDE BUT NOT BE LIMITED TO:
<br />2.5. APPROXIMATE ALOTTED TIME PER MEETING
<br />E.
<br />ALL APPLICABLE LANDLORD BUILDING STANDARDS
<br />01
<br />6.
<br />CONTRACTOR SHALL USE 3-5/6" METAL STUDS MINIMUM AT ALL PLUMBING
<br />3.1. CONFIRMING THAT THE SUBMITTAL MEETS THE REQUIREMENTS OF THE
<br />3. CONSTRUCTION MEETING MINUTES
<br />3. CONSTRUCTION DEBRIS AND WASTES SHALL BE DEPOSITED AT AN APPROPRIATE
<br />M
<br />CONTRACT DOCUMENTS.
<br />SITE. THE CONTRACTOR SHALL INFORM THE BUILDING REPRESENTATIVE OF THE
<br />a
<br />WALLS. CONTRACTOR TO VERIFY ACTUAL DEPTH REQUIRED, ANY DISCREPANCIES
<br />3.2. COORDINATION HAS TAKEN PLACE WITH ALL INTERCONNECTING TRADES
<br />3.1. FORMAT FOR THE MINUTES
<br />2.
<br />IN USING THESE PLANS FOR BIDDING OR CONSTRUCTION PURPOSES, ALL
<br />LOCATION OF DISPOSAL SITES.
<br />SHALL BE REPORTED TO THE ARCHITECT.
<br />3,3. THE SUBMITTAL IS COMPLETE AND COMPREHENSIVE
<br />3.2. CONTRACTOR TO AUTHOR THE MINUTES
<br />CONTRACTORS ARE REQUIRED TO REVIEW AND TREAT THEM AS A WHOLE IN
<br />ORDER TO IDENTIFY ALL REQUIREMENTS THAT DIRECTLY OR INDIRECTLY AFFECT
<br />4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF THE JOB
<br />w
<br />7.
<br />USE WATER RESISTANT GYPSUM BOARD/FIBER BOARD AT ALL AREAS SUBJECT TO
<br />4. REQUESTS ON SUBMITTALS FOR DIMENSIONS WHICH CAN BE DISCERNABLE
<br />4. FORMAL CHANGES IN THE WORK
<br />THEIR PORTION OF THE WORK, EVEN REQUIREMENTS LOCATED IN SECTIONS
<br />AFTER ITS COMPLETION. WHERE APPLICABLE, CLEANING SHALL INCLUDE, BUT
<br />F
<br />MOISTURE OR WHERE TILE IS USED.
<br />THROUGH MATHEMATICAL MEANS FROM INFORMATION ALREADY PROVIDED ON THE
<br />4.1. ADDENDA AND BULLETINS ISSUED BY THE ARCHITECT
<br />DESIGNATED AS APPLICABLE TO OTHER TRADES OR IN DOCUMENTS PROVIDED BY
<br />NOT BE LIMITED TO, THE EXTERIOR AND THE INTERIOR OF THE BUILDING, THE
<br />z
<br />CONTRACT DOCUMENTS WILL NOT BE PROVIDED.
<br />4.2. CHANGE ORDER REQUESTS ISSUED BY THE CONTRACTOR
<br />OTHER MEMBERS OF THE PROJECT DESIGN TEAM. UNLESS EXPRESSLY PROVIDED
<br />PATH OF TRAVEL TO THE JOB SITE, PARKING LOTS, ELEVATORS, LOBBIES, AND
<br />w
<br />8.
<br />ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH LOCAL AND NATIONAL
<br />4.3. CHANGE ORDERS ISSUED BY THE CONTRACTOR
<br />OTHERWISE, THE INTENT IS TO INCLUDE ALL LABOR, MATERIALS, PRODUCTS AND
<br />CORRIDOR CARPETS.
<br />CODES.
<br />5. SUBMITTALS NOT REQUESTED BY THE CONTRACT DOCUMENTS MAY OR MAY NOT
<br />4.4. TRACKING MECHANISMS
<br />SERVICES NECESSARY OR APPROPRIATE FOR THE COMPLETED PROJECT AS
<br />BE REVIEWED AT THE DESIGN TEAMS DISCRETION.
<br />CALLED FOR OR REASONABLY IMPLIED FROM THE PLANS AND SPECIFICATIONS
<br />5, THE CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION, WHERE REQUIRED
<br />9.
<br />ALL HOT WATER LINES SHALL BE PROPERLY INSULATED. SEE PLUMBING
<br />5. REQUESTS FOR INFORMATION PROCESS
<br />PROVIDED BY THE PROJECT'S DESIGN TEAM. IN CASE OF CONFLICTS OR
<br />PER STATE AND LOCAL CODES.
<br />DRAWINGS.
<br />5.1. TRACKING MECHANISM
<br />OMISSIONS, THE AFFECTED CONTRACTOR IS REQUIRED TO EITHER OBTAIN
<br />m
<br />6. SUBMITTALS ARE TO BE ROUTED THROUGH THE ARCHITECT AND ARE NOT TO BE
<br />5.2. DEFINE Cc: RECIPIENT LIST
<br />DIRECTION FROM AN APPROPRIATE REPRESENTATIVE OF THE OWNER, OR
<br />6. IF TRENCHES OR EXCAVATIONS 5'-0" OR MORE IN DEPTH ARE REQUIRED, OBTAIN
<br />10.
<br />-
<br />ALL PLUMBING CLEAN OUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE.
<br />SENT DIRECTLY TO ARCHITECT'S CONSULTANTS UNLESS SPECIFICALLY AUTHORIZED
<br />5.3. STANDARD RESPONSE TIMES (2-5 WORKING DAYS IS STANDARD)
<br />OTHERWISE TO APPLY THE MORE STRINGENT OR COSTLY STANDARD.
<br />ISSUANCE OF A BUILDING OR GRADING PERMIT.
<br />J
<br />CONTRACTOR SHALL COORDINATE ALL CLEAN -OUT LOCATIONS WITH EQUIPMENT,
<br />BY THE ARCHITECT.
<br />AND CABINETS. SUBMIT A PLAN OF ALL PROPOSED LOCATIONS TO ARCHITECT
<br />6. SUBMITTAL PROCESS
<br />3.
<br />IN INTERPRETING THESE PLANS, THE FOLLOWING GENERAL RULES APPLY:
<br />7. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED WITHIN THE BUILDING
<br />FOR APPROVAL PRIOR TO INSTALLATION.
<br />6.1. TRACKING MECHANISM
<br />WHICH DOES NOT COMPLY WITH THE LOCAL FIRE AUTHORITY AND STATE &
<br />11.
<br />ALL MILLWORK SHALL CONFORM TO STATE & LOCAL WOODWORKING STANDARDS.
<br />7. MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAM'S
<br />6.2. ISSUANCE SCHEDULE BY THE CONTRACTOR
<br />6.3. DEFINE Cc RECIPIENT LIST
<br />A.
<br />WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DRAWINGS
<br />COUNTY REQUIREMENTS.
<br />REVIEW. IF A CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR
<br />6.4. STAMPED REVIEWED AND APPROVED BY CONTRACTOR PRIOR TO SUBMISSION
<br />B.
<br />SPECIFIC NOTES DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES
<br />6. CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING OFF SUPPLY AND RETURN
<br />12.
<br />FIELD MEASURE AS REQUIRED FOR ALL MILLWORK CONDITIONS PRIOR TO
<br />SCHEDULE, THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW
<br />6.5. NON -REQUESTED SUBMITTALS MAY NOT BE REVIEWED
<br />.AND
<br />AND TYPICAL DETAILS
<br />AIR GRILLES, DIFFUSERS & DUCTS TO KEEP DUST FROM ENTERING INTO BUILDING
<br />r
<br />FABRICATION.
<br />AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING.
<br />6.6. STANDARD RESPONSE TIMES (7-10 WORKING DAYS IS STANDARD)
<br />C.
<br />WORK NOT PARTICULARLY SHOWN OR SPECIFIED SHALL BE THE SAME AS
<br />AIR DISTRIBUTION SYSTEMS.
<br />a
<br />SIMILAR PARTS THAT ARE SHOWN AND SPECIFIED
<br />13.
<br />CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR ARCHITECT AND TENANT
<br />7. SUBSTITUTIONS
<br />D.
<br />WORK SHOWN AS "NIC" IS FOR REFERENCE ONLY AND THE RESPONSIBILITY OF
<br />9. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE
<br />U)
<br />APPROVAL PRIOR TO MANUFACTURE OF ANY CABINET WORK, MILLWORK AND ANY
<br />7.1. REQUEST FORMS WITH REASONS AND BENEFIT FOR SUBSTITUTION
<br />THE CONTRACTOR ONLY TO THE EXTENT THAT THIS WORK MAY REQUIRE SOME
<br />SAFETY OF THE OCCUPANTS AND WORKERS AT ALL TIMES.
<br />OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATED WORK.
<br />REQUESTS FOR INFORMATION (RFI's)
<br />REASONABLE PROTECTION OR COORDINATION EFFORTS.
<br />w
<br />1. THE GENERAL CONTRACTOR IS TO REVIEW ALL PROSPECTIVE RFI's AND MAKE 6° PAYMENT APPLICATIONS W. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE F
<br />14. CONTRACTOR TO VERIFY FINAL LOCATION FOR CANTILEVERED COUNTERS AND
<br />EVERY EFFORT TO ANSWER THEM BEFORE SUBMITTING TO THE DESIGN TEAM.
<br />6.1. PROCESS
<br />BUILDING AND SITE WHILE JOB IS IN PROGRESS AND UNTIL THE JOB IS
<br />z
<br />IN -WALL SUPPORT BRACKETS PRIOR 10 GYPSUM BOARD FINISHING OF WALLS.
<br />5.2. SUBMITTAL DATE
<br />COMPLETED.
<br />ALL FINAL INSTALLATION HEIGHTS FOR IN -WALL SUPPORT BRACKETS MUST MEET
<br />5.3. ANTICIPATED TURN -AROUND
<br />4. THESE PLANS AND SPECIFICATIONS ARE INTENDED TO REPRESENT ONLY THE
<br />ALL ACCESSIBILITY CODES REQUIREMENTS WITH COUNTERTOP MATERIAL THICKNESS
<br />2. MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAMS
<br />FINISHED CONSTRUCTION. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL
<br />INCLUDED.
<br />REVIEW. IF A CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR
<br />9, PUNCH LISTS
<br />CONSTRUCTION AND DEMOLITION MEANS, METHODS, TECHNIQUES, SEQUENCES AND
<br />DRAWING NOTES:
<br />W
<br />15. PROVIDE AND INSTALL ALL NECESSARY WALL BACKING, STIFFENERS, BRACING,
<br />SCHEDULE, THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW
<br />9°1° ONLY ONE PUNCH WALK TO BE PROVIDED BY DESIGN TEAM
<br />9.2. CONTRACTOR TO PUNCH AND MAKE CORRECTIONS OR CREATE A MINIMAL
<br />PROCEDURES INCLUDING .ANY AND ALL SAFETY PRECAUTIONS AND PROGRAMS;
<br />�
<br />BACK-UP PLATES AND OR SUPPORTING BRACKETS AS REQUIRED FOR THE
<br />/
<br />AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING.
<br />LIST OF CORRECTIONS PRIOR TO DESIGN TEAM PUNCH.
<br />AND SHALL INDEMNIFY TO THE FULLEST EXTENT ALLOWED BY LAW THE OWNER
<br />1. UNLESS OTHERWISE NOTED OR INDICATED, ALL DIMENSIONS ON THESE DOCUMENTS
<br />AND THE PROJECT DESIGN TEAM FROM AND AGAINST ANY AND ALL RELATED
<br />SHALL BE TO FACE OF CURB, FACE OF CONCRETE OR MASONRY, FACE OF FINISH
<br />N
<br />INSTALLATION OF WALL -MOUNTED OR SUSPENDED EQUIPMENT OR BUILT-IN ITEMS.
<br />9.3. A FINAL WALK WILL OCCUR ONLY IF THE ARCHITECT IS CONTRACTED TO DO
<br />CLAIMS AND LIABILITY.
<br />OR CEN IERLINE OF GRIDS.
<br />VERIFY REQUIREMENTS WITH MANUFACTURERS PRIOR TO INSTALLATION. SUPPLY
<br />SO,
<br />e
<br />CATALOG CUT SHEETS FOR ARCHITECT'S APPROVAL.
<br />3. AN RFI LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A
<br />CURRENT COPY IS TO BE INCLUDED WITH EACH RFI SUBMISSION ALONG WITH ANY
<br />5. THESE PLANS AND SPECIFICATIONS ARE INTENDED TO SET FORTH THE
<br />2. ALL VERTICAL DIMENSIONS SHOWN ARE FROM FLOOR SLAB, U.O.N.
<br />`"
<br />CRITICAL RESPONSE DUE DATES.
<br />REQUIREMENTS FOR CONSTRUCTION IN ONLY AN INDUSTRY -STANDARD LEVEL OF
<br />16. PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL CONNECTIONS AND PLUMBING
<br />SUPPLY, FITTINGS & CONNECTORS TO COMPLETE INSTALLATION OF APPLIANCES &
<br />FIRE AU'l--HORITY
<br />NOTES
<br />QUALITY AND DETAIL, AND THEY ARE INTENDED TO BE SUPPLEMENTED BY
<br />APPROPRIATE REQUESTS FOR INFORMATION (RFIs). ERRORS AND OMISSIONS ARE
<br />3. DIMENSIONS SHOWN IN FIGURES TAKE PRECEDENCE OVER DIMENSIONS SCALED
<br />FROM DRAWINGS. LARGE SCALE DRAWINGS AND DETAILS TAKE PRECEDENCE OVER
<br />EQUIPMENT INDICATED ON PLAN. VERIFY REQUIREMENTS WITH MANUFACTURERS
<br />4. RFI's REGARDING METHODS AND MEANS OF CONSTRUCTION WILL NOT BE REVIEWED
<br />TO BE EXPECTED AND ANTICIPATED, AND ALL CONTRACTORS ARE REQUIRED TO
<br />SMALLER SCALE DRAWINGS.
<br />PRIOR TO INSTALLATION. SUPPLY CATALOG CUT SHEETS FOR ARCHITECT'S
<br />AND WILL BE REMOVED FROM THE RFI LOG,
<br />CAREFULLY REVIEW THESE PLANS FOR ERRORS AND OMISSIONS AND TO BRING
<br />APPROVAL.
<br />THESE ERRORS AND OMISSIONS TO THE ATTENTION OF AN APPROPRIATE OWNER
<br />4. THE TERM "ALIGN", AS USED IN THESE DOCUMENTS, SHALL MEAN TO
<br />U)
<br />1. FINAL INSPECTION BY FIRE DEPARTMENT IS REQUIRED - SCHEDULE 72 HOURS IN
<br />REPRESENTATIVE IN A TIMELY MANNER; AND ANY CONTRACTOR WHO FAILS TO DO
<br />ACCURATELY LOCATE FINISHES IN THE SAME PLANE
<br />17. EXACT LOCATION OF FIRE EXTINGUISHER CABINETS TO BE CONFIRMED WITH
<br />GRANGE ORDERS
<br />ADVANCE.
<br />SO BEFORE BIDDING OR OTHERWISE PROCEEDING ASSUMES THE RISK OF ANY
<br />ARCHITECT BEFOP£ INS I ALLATION PROVIDE ADDITIONAL FIRE EXTINGUISHERSG
<br />CONSEQUENCES
<br />9, „
<br />ui
<br />1. A COMPLETE SCHEDULE OF VALUES OF THE BASE CONTRACT IS TO BE PROVIDED 5. TYPICAL AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS z
<br />CABINETS AS REQUIRED BY THE FIRE DEPARTMENT FIELD INSPECTORS,
<br />TO THE OWNER AND ARCHITECT PRIOR TO THE START OF ANY WORK.
<br />2.
<br />THE PROJECT ADDRESS SHALL BE PROVIDED FOR ALL NEW AND EXISTING
<br />THE SAME OR REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT,
<br />w
<br />BUILDINGS IN A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE
<br />U.O.N.
<br />W
<br />18.
<br />CONTRACTOR TO VERIFY LOCATION OF ALL THERMOSTATS WITH ARCHITECT PRIOR
<br />STREET OR ROAD FRONTING THE PROPERTY PER LOCAL FIRE DEPARTMENT
<br />6.
<br />SCALED DIMENSIONS SHOULD BE CONSIDERED ONLY APPROXIMATE; AND IN ANY
<br />TO INSTALLATION.
<br />ALL CHANGE ORDER REQUESTS ARE TO BE REVIEWED AND APPROVED BY THE
<br />STANDARDS.
<br />EVENT ALL CONTRACTORS PROCEED AT THEIR OWN RISK IF THEY FAIL TO VERIFY
<br />6.
<br />""
<br />DETAILS ARE USUALLY KEYED AND NOTED "TYPICAL" ONLY ONCE, WHEN THEY
<br />w
<br />OWNER AND ARCHITECT PRIOR TO SUBMISSION OF A CHANGE ORDER.
<br />AND FIELD MEASURE DIMENSIONS BEFORE PROCEEDING WITH ANY AFFECTED
<br />FIRST OCCUR AND ARE REPRESENTATIVE OF ALL SIMILAR CONDITIONS
<br />19.
<br />ALL EXITS SHALL HAVE EXIT SIGNS AND ALL BLIND CORRIDOR TURNS SHALL
<br />3.
<br />AN UNOBSTRUCTED ALL-WEATHER FIRE APPARATUS ACCESS ROAD SHALL BE IN
<br />PROCUREMENT, FABRICATION OR CONSTRUCTION.
<br />THROUGHOUT, U.O.N.
<br />-'
<br />HAVE DIRECTIONAL EXIT SIGNS.
<br />PLACE PRIOR TO DELIVERY OF COMBUSTIBLE BUILDING MATERIALS TO THE SI
<br />20.
<br />PREPARE ALL FLOOR SURFACES AS REQUIRED TO RECEIVE FINISHES AS NOTED
<br />3.
<br />CHANGE ORDER REQUESTS ARE TO INCLUDE A COMPLETE BREAKDOWN BY TRADE
<br />4.
<br />FIRE PREVENTION WATER SERVICE SHALL BE IN SERVICE PRIOR TO DELIVERY OF
<br />7.
<br />PLANS ARE TO DE CONSIDERED DIAGRAMMATIC IN NATURE AND INTENDED ONLY
<br />7.
<br />COLUMN CENTERLINES (GRID LINES) ARE SHOWN FOR DIMENSIONING PURPOSES.
<br />V)
<br />o
<br />ON FINISH PLAN, ENLARGED FINISH PLANS & FINISH LEGEND.
<br />ALONG WITH TRADE BACK-UP AND UNIT PRICING WHERE APPLICABLE.
<br />COMBUSTIBLE BUILDING MATERIALS TO THE SITE.
<br />TO DEMONSTRATE THE RELATIONSHIP AMONG COMPONENT PARTS, AND NOT TO
<br />S.
<br />WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF
<br />to
<br />21.
<br />UNLESS OTHERWISE NOTED, ALL GYPSUM BOARD SURFACES, WALLS, AND CEILINGS
<br />4.
<br />A CHANGE ORDER REQUEST AND CHANGE ORDER LOG IS TO BE MAINTAINED BY
<br />5.
<br />ACCESS GATES SHALL BE APPROVED PRIOR TO INSTALLATION AND SHALL BE IN
<br />DEPICT SPECIFIC LOCATIONS..
<br />THE WORK, THE DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK IN
<br />�
<br />, , FINISH, SO AS TO RECEIVE
<br />SHALL BE TAPED, SANDED SMOOTH TO ALEVEL 4
<br />THE GENERAL CONTRACTOR AND SUBMITTED ALONG WITH EACH CHANGE ORDER
<br />COMPLIANCE WITH LOCAL FIRE AUTHORITY
<br />8.
<br />CONTRACTOR RFI's ARE INTENDED TO OBTAIN INFORMATION NOT AVAILABLE FROM
<br />THE SAME BUILDING.
<br />�
<br />PAINT OR WALL COVERING MATERIAL
<br />REQUEST.
<br />THE PLANS AND SPECIFICATIONS. RFI's WILL NOT BE PROCESSED THAT CAN BE
<br />6,
<br />FIRE SPRINKLER SYSTEM(S) SHALL MEET STATE & LOCAL FIRE CODES AND BE
<br />ANSWERED BY A REVIEW OF THESE DOCUMENTS, THAT REQUEST DIMENSIONS
<br />INTERIOR
<br />/ EXTERIOR NOTES:
<br />3:
<br />22.
<br />PROVIDE SOUND INSULATION AT PERIMETER WALLS OF RESTROOMS, LOBBY,
<br />PROVIDED TO PROTECT ENTIRE BUILDING INCLUDING PROJECTIONS OVER 4'-0"
<br />THAT CAN BE OBTAINED FROM THE PLANS BY MATHEMATICAL CALCULATION THAT
<br />STAIRS, AND ACROSS CEILING OF RESTROOMS TO CREATE AN ACOUSTIC
<br />PROJECT SCHEDULE
<br />AND SPRAY BOOTH.
<br />ARE IN EFFECT A SUBSTITUTION SUBMITTAL, OR THAT SEEK DIRECTION
<br />1.
<br />WHERE ELECTRICAL, MECHANICAL AND/OR PLUMBING ITEMS, SUCH AS LIGHTS,
<br />�
<br />ENVELOPE, U.O.N.
<br />1.
<br />A COMPLETE CONSTRUCTION SCHEDULE OF ALL PORTIONS OF THE WORK TO BE
<br />CONCERNING CONSTRUCTION MEANS AND METHODS OR SAFETY PRECAUTIONS.
<br />DUCTS, PIPING, DOWNSPOUTS, ETC. ARE TO PENETRATE ANY BUILDING FOOTINGS,
<br />J
<br />PROVIDED TO THE OWNER AND ARCHITECT PRIOR TO START OF ANY WORK.
<br />7.
<br />FIRE SPRINKLER SYSTEM(S) AND ALL CONTROL VALVES, INCLUDING EXTERIOR
<br />=
<br />WHERE APPROPRIATE, RFI's SHOULD BE SPECIFIC AS TO WHICH PORTION OF THE
<br />SLABS, FLOORS, STRUCTURAL FRAMING, WALL PARTITIONS, CEILINGS, ETC., IT 15
<br /><
<br />23.
<br />PATCH AND FILL VARIOUS OPENINGS AT EXISTING GYPSUM BOARD PARTITIONS
<br />SHALL BE SUPERVISED BY A U.L. LISTED CENTRAL ALARM STATION OR PER
<br />PLANS AND SPECIFICA I IONS NEEDS CLARIFICATION, AND WHAT INFORMATION IS
<br />REQUIRED THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE
<br />Q
<br />AND SOFFITS FOLLOWING .REMOVAL OR INSTALLATION OF ANY SURFACE MOUNTED
<br />STATE & LOCAL FIRE CODES.
<br />REQUIRED.
<br />FURNISHED. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF .ALL ITEMS
<br />�
<br />OR RECESSED FURNISHINGS, RECEPTACLES, UTILITY PIPING, SHELF STANDARDS &
<br />2.
<br />THE SCHEDULE SHALL NOT EXCEED TIME LIMITS CURRENT UNDER THE CONTRACT
<br />WITH THE CONSTRUCTION DOCUMENTS PRIOR TO THE INSTALLATION OF
<br />ALL OTHER SIMILAR ELEMENTS INDICATED TO BE REMOVED DURING THE
<br />DOCUMENTS.
<br />6.
<br />ALL VALVES CONTROLLING THE WATER. SUPPLY FOR AUTOMATIC SPRINKLER
<br />9.
<br />NO DEVIATIONS OR OMISSIONS FROM THE REQUIREMENTS OF THE PLANS AND
<br />STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL WORK. ANY CONFLICT OR
<br />DEMOLITION PHASE OR INSTALLED DURING THE CONSTRUCTION PHASE: TAPE AND
<br />SYSTEMS AND WATER -FLOW SWITCHES ON ALL SPRINKLER SYSTEMS SHALL DE
<br />_
<br />SPECIFICATIONS PROVIDED BY THE PROJECTS DESIGN TEAM ARE ALLOWED
<br />DISCREPANCY WITHIN CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE
<br />SEAL ALL SEAMS WITH JOINT COMPOUND: APPLY NEW FINISH TO MATCH EXISTING
<br />ELECTRICALLY MONITORED WHERE THE NUMBER OF SPRINKLERS IS (100) OR
<br />WITHOUT THE EXPRESSED AUTHORIZATION OF AN APPROPRIATE OWNER
<br />ARCHITECT'S ATTENTION FOR CLARIFICATION.
<br />W
<br />FINISH AT ADJACENT GYPSUM BOARD SURFACES AND FEATHER. NEW FINISH WITH
<br />3.
<br />THE SCHEDULE SHALL BE REVISED AT APPROPRIATE INTERVALS AS REQUIRED BY
<br />MORE.
<br />REPRESENTATIVE, AND THE RESPONSIBLE CONTRACTOR WILL INDEMNIFY AND HOLD
<br />EXISTING FINISH TO PROVIDE CONSISTENT & CONTINUOUS FINISH.
<br />THE CONDITIONS OF THE WORK AND PROJECT AND THE CONTRACTOR SHALL
<br />HARMLESS THE OWNER AND THE PROJECT DESIGN TEAM FROM AND AGAINST THE
<br />2.
<br />CONTRACTOR, ALONG WITH MECHANICAL CONTRACTOR, SHALL PROVIDE AND
<br /><
<br />NOTIFY THE OWNER AND ARCHITECT IF FOR ANY REASON THE SCHEDULE IS
<br />9.
<br />ELECTRICAL SUBCONTRACTORS TO INSTALL WIRING FOR FIRE SPRINKLER, ALARM
<br />CONSEQUENCES OF ANY UNAUTHORIZED DEVIATIONS OR OMISSIONS. SUBSTITUTION
<br />LOCATE ACCESS DOORS/PANELS IN WALL & CEILING CONSTRUCTION AS REQUIRED
<br />EXTENDED.
<br />BELL AND TELEPHONE WARNING AS REQUIRED BY FIRE DEPARTMENT.
<br />SUBMITTALS WILL BE CONSIDERED ONLY IF THE PROPOSED SUBSTITUTION
<br />TO PROVIDE ACCESS TO MECHANICAL, FIRE SPRINKLER, PLUMBING & ELECTRICAL
<br />IMPROVES THE QUALITY OF THE PROJECT TO THE OWNER; AND IN NO EVENT WILL
<br />WORK. CONTRACTOR SHALL SUBMIT A PLAN OF ALL PROPOSED ACCESS PANEL
<br />x
<br />4.
<br />A THREE WEEK LOOK -AHEAD SHALL BE REVIEWED REGULARLY AT EACH AOC
<br />10.
<br />INSTALLATION OF FIRE ALARM SYSTEMS SHALL BE IN ACCORDANCE WITH STATE &
<br />THE OWNER BE REQUIRED TO AUTHORIZE A SUBSTITUTION THAT IS NOT EQUAL IN
<br />LOCATIONS TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION.
<br />w
<br />MEETING WHICH WILL BE IN -LINE WITH THE OVERALL CONSTRUCTION SCHEDULE.
<br />LOCAL FIRE CODES.
<br />QUALITY TO WHAT IS SPECIFIED.
<br />�
<br />3.
<br />ALL PENETRATIONS AT RATED CONSTRUCTION SHALL BE PROTECTED TO MAINTAIN
<br />11.
<br />COMPLETE PLANS AND SPECIFICATIONS FOR ALL FIXED FIRE PROTECTION
<br />10.
<br />DESIGN/BUILD CONTRACTOR SUBMITTALS WILL BE REVIEWED BY THE PROJECT
<br />RATING.
<br />W
<br />EQUIPMENT INCLUDING AUTOMATIC SPRINKLERS AND OTHER FIRE -PROTECTION
<br />DESIGN TEAM, IF AT ALL, ONLY FOR CONFORMANCE WITH THE AESTHETIC
<br />SYSTEMS, SHALL BE SUBMITTED BY INSTALLING CONTRACTOR. SUCH PLANS
<br />ASPECTS AND MAJOR SPACE LIMITATIONS OF THE PROJECT; AND EACH
<br />4.
<br />WHERE OCCURS, CONTRACTOR SHALL PATCH ANY EXISTING WALLS AND/OR
<br />>_
<br />DESIGN
<br />BUILD
<br />NOTESSHALL
<br />BE APPROVED BY LOCAL FIRE AUTHORITY PRIOR TO INSTALLATION.
<br />DESIGN/BUILD CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING:
<br />CEILINGS AS NEEDED TO REFURBISH THE LEASE SPACE AND REPAIR ALL
<br />DAMAGES CAUSED BY CONTRACTOR.
<br />e
<br />z
<br />0
<br />12 LOCATIONS AND CLASSIFICATIONS OF FIRE EXTINGUISHERS SHALL BE IN A PREPARING ALL THE ENGINEERING AND OTHER DRAWI GS AND SPECIFICATIONS
<br />ACCORDANCE WITH STATE & LOCAL FIRE CODES AND PLACEMENT IS SUBJECT TO
<br />N
<br />FOR THE COMPONENTS OF ITS DESIGN/BUILD UNDERTAKING.
<br />5. INTERIOR WALLS AND CEILINGS SHALL BE INSTALLED IN ACCORDANCE TO STATE &
<br />THE APPROVAL OF THE FIRE INSPECTOR. VERIFY QUANTITY & EXACT LOCATION
<br />D.
<br />COMPLYING WITH THE PROJECT'S REQUIREMENTS AND SPACE LIMITATIONS.
<br />LOCAL CODES, INCLUDING REQUIREMENTS FOR FLAME SPREAD AND SMOKE
<br />1. LIGHT SWITCHES SHALL BE INSTALLED AT +48" A.F.F. MULTIPLE SWITCHES
<br />FROM FIRE DEPARTMENT PRIOR TO ORDERING.
<br />C.
<br />COORDINATION AND INTERFACING WITH OTHER TRADES AND CONSULTANTS.
<br />DENSITY RATINGS FOR FINISH MATERIALS.
<br />SHOULD BE GANGED TOGETHER UNLESS OTHERWISE SPECIFIED.
<br />D.
<br />OBTAINING ANY REQUIRED OR APPROPRIATE APPROVALS FROM AUTHORITIES
<br />13. AT LEAST ONE (1) FIRE EXTINGUISHER WITH A MINIMUM RATING OF:
<br />HAVING JURISDICTION OVER THE PROJECT.
<br />6. WHEN USED ALL NOISE BARBS SAND INSULATION
<br />_ BARRIER AIT(SOUND INSULATION)
<br />J
<br />2. CONTRACTOR TO VERIFY ALL SWITCH LOCATIONS WITH THE ARCHITECT PRIOR TO
<br />2-A-10B: C (FOR OFFICE), OR 10--A--808: C (FOR WAREHOUSE), SHALL BE
<br />E.
<br />HAVING THEIR DESIGN CONSULTANTS SERVE AS THE PROFESSIONAL OF RECORD
<br />BAITS SHALL BE NONCOMBUSTIBLE AND SHALL NOT CONTAIN OR UTILIZE
<br />INSTALLATION. NUMBER OF SWITCHES FOR OPEN AREA IS BIDDER. DESIGN.
<br />PROVIDED WITHIN 75'-0" MAXIMUM TRAVEL DISTANCE FOR EACH 3,000 SQUARE
<br />FOR THE PORTIONS OF WORK WHICH THEY DESIGN.
<br />OZONE DEPLETING COMPOUNDS.
<br />Cn
<br />a
<br />SWITCHES INDICATED ON THE DRAWINGS FOR OPEN AREA ARE FOR REFERENCE
<br />FEET OR PORTION THEREOF ON EACH FLOOR.
<br />a
<br />ONLY.
<br />11.
<br />AT THE OF THE CONSTRUCTION, PRIME CONTRACTOR SHALL
<br />7. ALL NEW CONSTRUCTION MATERIALS SHALL BE 100 ASBESTOS -FREE.
<br />14. STORAGE, DISPENSING OR USE OF ANY FLAMMABLE AND COMBUSTIBLE LIQUIDS,
<br />.CONCLUSION .EACH
<br />PROVIDE SUCH WRITTEN CERTIFICATION THAT THE CONSTRUCTION HAS BEEN
<br />�
<br />0
<br />3. CONTRACTOR SHALL PROVIDE SEISMIC BRACING AT ALL NEW AND RELOCATED
<br />FLAMMABLE AND COMPRESSED GASES, AND OTHER HAZARDOUS MATERIALS SHALL
<br />PERFORMED IN COMPLIANCE WITH THE PROJECT'S APPROVED PLANS AND
<br />e
<br />LIGHT FIXTURES.
<br />COMPLY WITH STATE & LOCAL FIRE CODES. THE STORAGE AND USE OF
<br />SPECIFICATIONS AS THE BUILDING OFFICIAL WITH JURISDICTION OVER THE PROJECT
<br />HAZARDOUS MATERIALS SHALL BE APPROVED BY THE FIRE AUTHORITY PRIOR TO
<br />MAY REQUIRE, OR AS THE _OWNER MAY REASONABLY REQUEST.
<br />Q
<br />4. CONTRACTOR SHALL VERIFY AND PROVIDE A COMPLETE HVAC SYSTEM WHICH
<br />ANY MATERIALS BEING STORED OR USED ON SITE. A SEPARATE PLAN SUBMITTAL
<br />CONFORMS TO THE OWNER'S HVAC SPECIFICATIONS. CONTRACTOR SHALL BE
<br />IS REQUIRED PRIOR TO THE STORAGE AND USE OF HAZARDOUS MATERIALS.
<br />12.
<br />VERSIONS OF THESE PLANS PROVIDED IN ANY ELECTRONIC FORM ARE SUBJECT
<br />0
<br />RESPONSIBLE FOR ALL ROOF PENETRATIONS AND PATCHING, ANY SCREENING OF
<br />TO THE SAME PROVISION AS THE OTHER INSTRUMENTS OF SERVICE PREPARED BY
<br />ROOF -MOUNTED MECHANICAL UNIT REQUIRED BY GOVERNING JURISDICTION.
<br />15. BUILDING(S) NOT APPROVED FOR HIGH -PILED STOCK (MATERIALS IN CLOSELY
<br />OR ON BEHALF OF THE PROJECT DESIGN TEAM, INCLUDING WITHOUT LIMITATION
<br />PACKED PILES OR ON PALLETS, ORIN RACKS WHERE THE TOP OF STORAGE
<br />THEIR COMMON LAW, STATUTORY OR OTHER RESERVED RIGHTS, INCLUDING
<br />EXCEEDS 12'-0" IN HEIGHT, AND 6H -0 FOR GROUP A PLASTICS AND CERTAIN
<br />COPYRIGHTS. A RECIPIENT IS GRANTED AT MOST A TRANSFERABLE
<br />OTHER HIGH -HAZARD COMMODITIES). HIGH -PILED STOCK SHALL BE APPROVED
<br />NONEXCLUSIVE LICENSE TO REUSE THE PLANS SOLELY FOR PROJECT PURPOSES;
<br />BY THE FIRE AUTHORITY PRIOR TO MATERIALS BEING STORED ON SITE. A
<br />AND NO RECIPIENT IS AUTHORIZED TO USE OR TO ALLOW THE USE OF ALL OR
<br /><
<br />SEPARATE PLAN SUBMITTAL IS REQUIRED FOR HIGH -PILED STORAGE IN
<br />ANY PORTION OF THESE PLANS FOR ANY OTHER PURPOSE, AND ANY OTHER USE
<br />ACCORDANCE WITH STATE & LOCAL FIRE CODES.
<br />FOR ANY OTHER PURPOSE COULD CONSTITUTE ACTIONABLE PLAGIARISM. ANY
<br />ui
<br />ELECTRONIC DOCUMENTS WILL BE PROVIDED IN THE RESPONSIBLE DESIGN _
<br />16. A LETTER OF INTENDED USE MAY BE REQUIRED BY THE FIRE INSPECTOR. PROFESSIONAL'S STANDARD FORMATS AND CONVENTIONS AND WITH NO w
<br />GUARANTEE OF THE ABSENCE OF VIRUSES OR OTHER HARMFUL MATERIAL, OR OF PA / PM: I. CONNOR
<br />17. ALL REQUIRED FIRE DOORS SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY COMPATIBILITY WITH ANY RECIPIENT'S SOFTWARE OR HARDWARE SO THAT ANY a
<br />SHOWING THE SPECIFIC RATING. USE WITH OR CONVERSION TO THE OTHER FORMS OR CONVENTIONS, OR THE USE DRAWN BY: P.C.P.
<br />WITH ANY PARTICULAR SOFTWARE OR HARDWARE, IS AT THE RECIPIENT'S SOLE
<br />16. EXIT SIGNS AND ILLUMINATION SHALL CONFORM TO ALL APPLICABLE BUILDING RISK. v JOB NO.: SEA19-6064®00
<br />AND FIRE CODES.
<br />W
<br />a_
<br />SYSTEM PER APPLICABLE CODES INCLUDING IF NECESSARY FIR HORNS, STROBE 4
<br />LIGHTS, CONTROL PANEL CONNECTIONS, SMOKE DETECTORS, AUDIO VISUAL
<br />ALARMS. SUBMIT SHOP DRAWINGS TO THE FIRE MARSHAL FOR APPROVAL.