Laserfiche WebLink
® 11- 1 HlZi 6HEL1 16 NU I - 11 16 <br />N <br />0 <br />Q <br />I <br />Uo <br />0 <br />/ <br />0 <br />c� <br />/ <br />0 <br />/ <br />6 <br />U <br />2 <br />:E <br />U <br />Q <br />0 <br />0 <br />Q0 <br />C) <br />co <br />Q <br />Ld <br />U) <br />/ <br />P <br />FINISH <br />NOTES <br />MILLWORK NOTES <br />CEILING NOTES <br />DOOR NOTES <br />1. CONTRACTOR MUST NOTIFY ARCHITECT / DESIGNER OF ANY DISCREPANCY IN <br />1. <br />NO FINISH SUBSTITUTIONS MAY BE MADE UNLESS APPROVED BY ARCHITECT. <br />35. PRIOR TO INSTALLING WALL TILES AND WALL BASE TILE, WALLS MUST BE <br />PLANS. FINISH ITEMS CLEARLY SHOWN IN PLANS, BUT OMITTED FROM SCHEDULES <br />1. <br />SEE ELECTRICAL ENGINEERING DRAWINGS FOR SPECIFICATIONS OF NEW BUILDING <br />1. <br />VERIFY THAT ALL DOORS AND DOOR HARDWARE MEET THE REQUIREMENTS OF ALL <br />PATCHED AND REPAIRED, CLEAN AND DRY AND BE PROPERLY MEMBERED AND <br />OR LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR. <br />STANDARD LIGHT FIXTURES, SWITCHES, EXIT SIGNS, ETC. <br />GOVERNING CODES & STANDARDS. NOTIFY THE ARCHITECT IMMEDIATELY IN CASE <br />2. <br />CONTRACTOR MUST NOTIFY THE ARCHITECT OF ANY DISCREPANCY IN PLANS. <br />ALIGNED, S0, AS TO LEAVE NO EVIDENCE OF PATCHING OR REPAIRS: ALL <br />CONTRACTOR TO VERIFY OMITTED FINISHES WITH ARCHITECT OR DESIGNER PRIOR <br />OF DISCREPANCY. <br />FINISH ITEMS CLEARLY SHOWN IN PLANS, BUT OMITTED FROM SCHEDULES OR <br />SCREW AND NAIL HEADS MUST BE SET AND SPACKLED. ALL JOINTS MUST BE <br />TO ORDERING PRODUCTS. <br />2. <br />ALL REPLACEMENT FLUORESCENT LAMPS TO MATCH BUILDING STANDARD - SAME <br />LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR. <br />TAPED AND COVERED WITH JOINT COMPOUND. JOINTS THAT ARE FILLED ARE TO <br />COLOR AND MANUFACTURER. <br />2. <br />FIELD MEASURE, AS REQUIRED, ALL DOORS PRIOR TO FABRICATION. <br />CONTRACTOR TO VERIFY OMITTED FINISHED WITH ARCHITECT PRIOR TO ORDERING <br />BE SANDED SMOOTH AND BUMP FREE WITH DUST REMOVED PRIOR TO RECEIVING <br />2. SHOP DRAWINGS MUST BE PROVIDED FOR APPROVAL PRIOR TO FABRICATION TO <br />PRODUCTS. <br />MORTAR BED/BOND COAT AND WALL TILES. <br />THE ARCHITECT. CABINETMAKER SHALL USE ON SITE FIELD FRAMING DIMENSIONS <br />3. <br />FIELD VERIFY EXISTING CEILING GRID LOCATION AND NOTIFY ARCHITECT OF ANY <br />3. <br />PROVIDE A SIGN ON OR NEAR THE MAIN EXIT DOOR READING: <br />FOR ALL SHOP DRAWINGS AND FABRICATIONS. ANY SUBSTITUTIONS TO THE <br />DISCREPANCIES ON PLANS. <br />"THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED". <br />3. <br />INSTALL MATERIALS ACCORDING TO MANUFACTURER'S SUGGESTED INSTALLATION <br />36. WALL TILES ARE TO HAVE A MORTAR BED/BOND COAT THICKNESS TO <br />FOLLOWING SPECIFICATIONS MUST BE APPROVED BY THE ARCHITECT PRIOR TO <br />AND PREPARATION/MAINTENANCE SPECIFICATIONS OR BETTER, UNLESS OTHERWISE <br />ACCOMMODATE THE VARYING THICKNESSES OF ALL MATERIAL TYPES OF TILE <br />FABRICATION. <br />4. <br />WHERE DISCREPANCIES IN LOCATION OF LIGHT FIXTURES, AIR DIFFUSERS, GRILLES, <br />4. <br />VERIFY THAT EXISTING DOORS COMPLY WITH ACCESSIBILITY REQUIREMENTS. <br />APPROVED OR NOTED. <br />SPECIFIED FOR WALL INSTALLATION WITH A FLUSH FRONT FACE. <br />ETC. OCCUR ON THE ELECTRICAL ENGINEERING PLANS, THE ARCHITECTURAL <br />3. CABINET MAKER TO COORDINATE & VERIFY WITH CONTRACTOR FINAL LOCATION <br />V NOTIFY ARCHITECT OF ANY DISCREPANCIES FOR <br />PLANS SHALL GOVERN. N TI Y <br />5. <br />RATED DOORS SHALL COMPLY WITH REQUIREMENTS OF ALL GOVERNING CODES �c <br />4. <br />APPLICATION OF CONTROLLED INTERIOR FINISHES SHALL BE IN CONFORMANCE <br />37. TRANSLUCENT GLASS TILE SPECIFIED ARE TO RECEIVE UNIFORM COVERAGE BY <br />FOR CANTILEVERED COUNTERS FOR IN -WALL SUPPORT BRACKETS, PRIOR TO <br />CLARIFICATIONS. <br />STANDARDS AND SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY SHOWING <br />WITH STATE & LOCAL CODES <br />BACK BUTTERING TILES AND TROWEL RIDGES FLATTENED PRIOR TO SETTING <br />GYPSUM BOARD FINISHING OF WALLS. ALL FINAL INSTALLATION HEIGHTS FOR <br />THE SPECIFIC RATINGS. <br />TRANSLUCENT GLASS TILES. <br />IN -WALL SUPPORT BRACKETS MUST MEET ALL APPLICABLE ACCESSIBILITY CODES <br />5. <br />FIELD VERIFY ALL CLEARANCES OF DUCTS, PIPES, SPRINKLERS, ETC., AND NOTIFY <br />5. <br />DECORATIVE MATERIALS SHALL BE MAINTAINED IN AFLAME -RETARDANT <br />AND STANDARDS WITH COUNTER TOP MATERIAL THICKNESS INCLUDED. <br />ARCHITECT OF ANY CONFLICTS PRIOR TO INSTALLATION A OF LIGHTS, ETC. <br />6. <br />ALL HARDWARE TO BE LEVER -TYPE PER GOVERNING CODES & ACCESSIBILITY <br />CONDITION. <br />38. FLOORS OF TOILETS, BATHING AND SHOWER ROOMS SHALL HAVE A SMOOTH, <br />STANDARDS. <br />HARD, NONABSORBENT SURFACE. THE INTERSECTION OF SUCH FLOORS WITH <br />4. MATERIAL COLORS NOT LISTED SHALL BE REQUESTED FROM ARCHITECT/INTERIOR <br />6. <br />PLACEMENT OF LIGHT FIXTURES IN AREAS WHERE MAIN DUCTS MAY CAUSE <br />6. <br />SUBMIT THE FOLLOWING SAMPLES FOR ARCHITECT'S APPROVAL: <br />WALLS SHALL HAVE A SMOOTH, HARD, NONABSORBENT VERTICAL BASE AS <br />DESIGNER ON SHOP DRAWING SUBMITTALS OR BY LETTER. <br />INTERFERENCE MUST BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION. <br />7. <br />DOOR HANDLES, PULLS OR KNOBS SHALL BE INSTALLED AT 40" ABOVE FINISH <br />A. THREE (3) 12" X 12" SAMPLES FOR ALL PAINT AND STAIN BRUSHOUTS, <br />SPECIFIED IN FINISH PLANS OR RESTROOM ELEVATIONS. BASE SHALL EXTEND <br />FLOOR. ALL OTHER OPERABLE PARTS OF DOOR HARDWARE (SUCH AS DEADBOLTS, <br />VINYL AND FABRIC FINISHES AND COLORS APPLIED TO A SUBSTRATE WHICH <br />UPWARD ONTO THE WALLS NOT LESS THAN 4 INCHES. <br />5. ALL UPPERS TO BE LAMINATED TO MATCH BASE CABINETS. BOTH UPPERS & <br />7. <br />CONDUITS ABOVE CEILING MUST BE A MINIMUM OF 12 ABOVE THE CEILING GRID. <br />KEYHOLES... ETC.) ARE TO BE CENTERED BETWEEN 34" AND 44" ABOVE FINISH <br />IS REPRESENTATIVE OF THE SURFACE TO BE FINISHED. SUBMIT PAINT <br />LOWER CABINETS IN WET AREAS TO HAVE MATCHING PVC EDGE, ALL OTHERS TO <br />FLOOR. IF EXISTING BUILDING STANDARD EXISTS, MATCH BUILDING STANDARD AND <br />SAMPLES FROM THE PAINT LOT OR LOTS INTENDED FOR APPLICATION <br />39. WALLS AND PARTITIONS WITHIN 2 FEET OF SERVICE SINKS, URINALS AND WATER <br />HAVE PLASTIC LAMINATE EDGE BANDING U.O.N. <br />8. <br />NO COMBUSTIBLE MATERIALS SHALL BE USED IN THE PLENUM SPACE, INCLUDING <br />CONFIRM COMPLIANCE WITH ACCESSIBILITY REQUIREMENTS. <br />CLOSETS SHALL HAVE A SMOOTH, HARD, NONABSORBENT SURFACE TO A HEIGHT <br />ALUMINUM FLEX, ALUMINUM CONDUIT, AND POT METAL CONNECTORS. <br />B. ONE (1) 24" X 24" MOCK-UP WITH SAMPLE SEAM (CENTERED) OF ALL <br />OF NOT LESS THAN 4 FEET ABOVE THE FLOOR. <br />6. ALL CABINETS AND DOORS SHALL BE CONSTRUCTED FROM 3/4" THICK MATERIAL, <br />8. <br />SPECIAL LOCKING DEVICES SHALL BE OF AN APPROVED TYPE. <br />FABRIC AND VINYL FINISHES AND COLOR. <br />UNLESS APPROVED PRIOR TO EACH JOB. <br />9. <br />ALL JUNCTION BOXES AND MECHANICAL EQUIPMENT REQUIRING ACCESS FOR <br />40. CONTROL JOINTS AT GYPSUM BOARD ASSEMBLIES: THE MAXIMUM RECOMMENDED <br />SERVICE SHALL BE LOCATED OVER ACOUSTICAL CEILINGS. NO ACCESS HATCHES <br />9, <br />PROVIDE WEATHER SEALS ON ALL EXTERIOR DOORS PER ANSI STANDARDS. <br />C. THREE (3) 12" X 12" SAMPLES OF ALL FLOOR COVERING. <br />CONTROL JOINT SPACING FOR WALLS AND CEILINGS WITHOUT PERIMETER RELIEF <br />7. ALL BASE CABINET ARE NOT TO RECEIVE WALL BASE UNLESS INDICATED ON <br />SHALL BE INSTALLED IN GYPSUM BOARD CEILINGS WITHOUT PRIOR APPROVAL BY <br />IS 30 LINEAR FEET OR 900 SQUARE FEET OF SURFACE AREA, WITH PERIMETER <br />FINISH PLANS OR ELEVATIONS. <br />ARCHITECT. (NO EXCEPTION) <br />10. <br />CONTRACTOR IS RESPONSIBLE TO COORDINATE & VERIFY ALL DOOR FRAME <br />D. SUBMIT ACTUAL CUTTINGS OF EACH PRODUCT FOR COLOR/QUALITY CONTROL. <br />RELIEF IS 50 LINEAR FEET OR 2,500 SQUARE FEET OF SURFACE AREA. <br />THROAT THICKNESS' FOR EACH LOCATION. <br />EXTERIOR JOINT SPACING IS RECOMMENDED AT 30 LINEAR FEET OR 900 SQUARE <br />8. ALL INTERIORS OF CLOSED CABINETS TO BE WHITE MELAMINE/POLYESTER OR <br />10. <br />ALL SPRINKLER HEADS AT HARD -LID CEILINGS ARE TO BE FULLY RECESSED AND <br />7. <br />WHERE MATERIALS ARE NOT RETURNABLE, SUBMIT SAMPLES TO ARCHITECT <br />FEET OF SURFACE AREA. <br />APPROVED EQUAL, UNLESS OTHERWISE SPECIFIED. <br />CONCEALED. HEADS ARE TO BE CENTERED BETWEEN LIGHTS IN A UNIFORM <br />11. <br />ALL DOOR FRAMES TO BE FACTORY FINISHED, U.O.N.. <br />ARCHITECTURAL PATTERN. G.C. TO PROVIDE A SUBMITTAL WITH SPRINKLER HEAD <br />BEFORE PLACING FULL ORDERS. <br />41. CONSTRUCTION JOINTS (EXPANSION JOINTS) AT GYPSUM BOARD ASSEMBLIES: <br />9. ALL OPEN CABINETS OR SHELVES TO HAVE PLASTIC LAMINATE TO MATCH <br />LOCATIONS FOR ARCHITECT'S APPROVAL PRIOR TO INSTALLATION. <br />12. <br />ALL WALL DOOR STOPS TO HAVE 2x6 BACKING IN THE WALL BEHIND. <br />8. <br />SUBMIT SEAMING PLAN FOR ALL FLOOR FINISHES TO ARCHITECT FOR APPROVAL <br />CONSTRUCTION JOINTS ARE REQUIRED AT CONTINUOUS GYPSUM BOARD <br />EXTERIORS. <br />PRIOR TO ORDER. <br />SURFACES WITH DISSIMILAR WALL STRUCTURE. <br />11. <br />ALL GYPSUM BOARD CEILINGS ARE TO BE INSTALLED WITH LINEAR DIFFUSERS. <br />13. <br />MAXIMUM UNDERCUT OF ALL DOORS NOT IN A RATED CORRIDOR SHALL NOT <br />10. NO 3/4" THICK SHELF SHALL SPAN LONGER THAN 32" WITHOUT SUPPORT. <br />G.C. TO PROVIDE A SUBMITTAL WITH ALL LINEAR DIFFUSER LOCATIONS PRIOR TO <br />EXCEED 1/2" ABOVE FINISH FLOOR SURFACE. <br />9. <br />NOTIFY ARCHITECT IMMEDIATELY OF ITEMS WITH LONG LEAD TIMES. <br />INSTALLATION. <br />11. ALL SHELVING TO BE ADJUSTABLE UNLESS OTHERWISE SPECIFIED. <br />14. <br />CONTRACTOR SHALL REFINISH ANY BLEMISHED DOOR OR REPLACE SAID DOOR IF <br />10. <br />ALL PAINT FINISH OF METAL PARTS OF DOORS, HANDRAILS, PERIMETER <br />12. <br />LOCATE RECESSED DOWN LIGHTS, WALL WASHERS, SMOKE DETECTORS, EXIT SIGNS, <br />�a �y <br />NOT ABLE TO REFINISH TO AS NEW CONDITION. <br />ENCLOSURES, ETC., SHALL BE SEMI -GLOSS, U.O.N. <br />12. ALL FILE PEDESTALS ARE TO BE CONFIGURED FOR "FRONT TO BACK" FILING AND <br />SPEAKERS, FIRE SPRINKLERS, ETC. IN CENTER OF 24"x24" CEILING TILES OR IN <br />BE ABLE TO ACCEPT METAL HANGERS TO ACCEPT PENDAFLEX TYPE FILE <br />CENTER OF 24"x24" PORTION OF 24" x48" CEILING TILES, UNLESS OTHERWISE <br />15. <br />ALL DOORS TO BE OPERABLE FROM THE INSIDE WITHOUT A KEY OR ANY SPECIAL <br />11. <br />WHERE PAINT COLORS CHANGE, CORNERS ARE TO BE CUT -IN FREE OF <br />FOLDERS, UNLESS NOTED AS LATERAL. <br />NOTED. <br />KNOWLEDGE OR EFFORT. <br />OVERLAPPING. <br />13. ALL COUNTER TOPS TO BE 24" DEEP, UNLESS OTHERWISE SPECIFIED. WHERE NO <br />13, <br />PROVIDE SWITCHES AND LIGHT SENSORS FOR OPEN AREAS AND PRIVATE OFFICES. <br />16. <br />ALL DOORS WITH ELECTRONIC SECURITY DOOR LOCKS MUST BE OPERABLE FOR <br />12. <br />PRIOR TO THE INSTALLATION OF WALL COVERINGS, SURFACES SHALL BE <br />BACKSPLASH IS SPECIFIED, COUNTER TOPS TO BE SCRIBED TIGHTLY TO BACK & <br />ACTUAL LOCATION OF ALL SWITCHES TO BE DETERMINED BY ELECTRICAL <br />EXITING PURPOSES UNDER ALL CONDITIONS, INCLUDING A POWER OUTAGE. <br />PROPERLY PREPARED WITH SEALER PER MANUFACTURER'S RECOMMENDATIONS. <br />SIDE WALLS. <br />ENGINEER. <br />17. <br />IF BUILDING STANDARDS ARE INCONSISTENT FOR DOORS, RECITES, HARDWARE, <br />13. <br />CONTRACTOR TO VERIFY CONDITION AND LEVEL OF FLOOR SO AS TO RECEIVE. <br />14. ALL BACKSPLASHES TO BE SCRIBED TO WALLS, AND MUST BE FLUSH TO EDGE <br />14. <br />WHERE EXIT SIGNS ARE REQUIRED PER STATE_ & LOCAL CODES, THEY SHALL BE <br />DOOR AND RECITE FRAMES- OR OTHER STANDARD DETAILS, THEN CONTRACTOR <br />NEW FINISHES WITHOUT BOWING AT FLOOR OR WALL BASE. CONTRACTOR IS <br />OF BASE, UNLESS OTHERWISE SPECIFIED. ALL COUNTER TRANSITION SEAMS MUST <br />ILLUMINATED PER SAID CODES AND THE NEC. LOCATIONS SHALL BE <br />MUST VERIFY WITH DESIGNER AND OWNER PRIOR TO CONSTRUCTION. <br />RESPONSIBLE FOR ALL FLOOR PREPARATION. <br />BE CAULKED SEALED, VERIFY EITHER MATCHING COLOR CAULK OR CLEAR <br />COORDINATED WITH THE ARCHITECT. <br />SILICONE. <br />14. <br />ALL CARPETING SHALL BE INSTALLED WITH GLUE DOWN METHOD, U.O.N. <br />15. <br />PROVIDE BACK-UP POWER FOR EXIT SIGNS PER STATE & LOCAL CODES. <br />15. PROVIDE SIDE SPLASHES AT LOCATIONS ADJACENT TO WALLS OR WINDOWS, <br />15. <br />WHERE FLOOR -MOUNTED OUTLETS ARE REQUIRED ON CARPETED AREA, CUT <br />ESPECIALLY FOR SINKS U.O.N. <br />16. <br />THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED <br />CARPET IN AN "X" OVER FLOOR HOLE AND INSTALL CARPET OVER TOP. DO NOT <br />TO A LEVEL OF NOT LESS THAN ONE FOOT CANDLE AT THE WALKING SURFACE <br />TRIM CARPET. <br />16, FACES OF PIGEONHOLES TO MATCH WORK SURFACE LAMINATE. COLOR OF EDGE <br />AT ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS <br />BANDING ON ALL DOORS TO MATCH FACE MATERIAL. <br />OCCUPIED. <br />16. <br />ALL V.C.T. TO BE INSTALLED WITH FULL TILE FROM VINYL THRESHOLD STRIP AND <br />FULL TILE FROM WALL ADJACENT TO DOOR SWING, U.O.N. <br />17. SEE SPECIFICATIONS/PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. <br />17. <br />EMERGENCY LIGHTING SHALL BE 2) SEPARATE SOURCES OF POWER AND SHALL <br />POWER & SIGNAL NOTES <br />COMPLY WITH THE NEC. <br />17. <br />PROVIDE AND INSTALL SPECIFIED BASE FOR ALL AREAS TO RECEIVE FLOORING. <br />18. COUNTERTOPS SHALL HAVE A NOSING OF COUNTERTOP MATERIAL AT LEAST S' <br />DEEP, WHEREBY THE COUNTER MATERIAL EXTENDS INTO THE INSIDE OF THE <br />18. <br />PROVIDE FIRE DAMPERS AT ALL SUPPLY AND RETURN AIR OUTLETS, INLETS OR <br />18. <br />CONTRACTOR SHALL PROVIDE PRE -FORMED RUBBER BASE CORNERS. -DO NOT <br />CABINET, I.E. OVER THE DOOR (WHEN PRESENT). <br />DUCTS PENETRATING FIRE RATED ASSEMBLIES, ENCLOSURES, WALLS, FLOORS OR <br />1. <br />COORDINATE TELEPHONE/DATA INSTALLATION WITH APPROPRIATE <br />CUT OR BEND STRAIGHT BASE TO MAKE CORNERS. <br />SURFACES, AND AS REQUIRED BY THE FIRE DEPARTMENT. <br />SUB -CONTRACTOR. <br />19. END PANELS AND FRONT EDGES OF EDGE PANELS WHICH ARE PROUD OF THE <br />19. <br />CONTRACTOR SHALL PROVIDE EMERGENCY LIGHTING, STROBE LIGHTS, <br />2. <br />ALL EXISTING ELECTRICAL DEVICES ARE TO REMAIN, UNLESS NOTED OTHERWISE. <br />19. <br />MILLWORK LOWER CABINETS ARE NOT TO RECEIVE WALL BASE UNLESS INDICATED <br />INTERIOR CABINET SHALL BE FACED TO MATCH DOOR FRONTS. <br />ON FINISH PLANS. <br />AUDIO-VISUAL ALARMS AND OCCUPANCY SENSORS TO MEET ALL APPLICABLE <br />20. ALL HINGED DOORS TO HAVE CLEAR SILENCERS TOP AND BOTTOM ON DOOR (NOT <br />CODES. <br />3. <br />ALL OUTLETS TO BE INSTALLED AT LOCATIONS SHOWN BY DIMENSIONS ON THE <br />POWER & SIGNAL PLAN. DIMENSION ALL OUTLETS FROM THE CENTERLINE OF THE <br />20. <br />FLOOR FINISHES TO CONTINUE UNDERNEATH "OPEN FLOOR"AREAS OF MILLWORK, <br />CABINET). <br />20. <br />CONTRACTOR SHALL PROVIDE LAMPS WITH TYPE IC RATED HOUSING WHERE <br />OUTLET BOX. NON -DIMENSIONED OUTLETS ARE TO LOCATED AT THE NEAREST <br />INCLUDING SINK AREA AND AT ALL UNDER -COUNTER EQUIPAREAS WHICH <br />FIXTURES COME IN DIRECT CONTACT WITH INSULATION. <br />WALL STUD, <br />ARE OPEN TO THE FLOOR. <br />21. ALL DRAWERS GLIDES SHALL HAVE SILENCERS BUILT INTO THE GLIDE AND NOT <br />INSTALLED ON THE DRAWER OR DRAWER FRONT. <br />21. <br />EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED AT ALL TIMES <br />4. <br />WHEN OUTLETS ARE GROUPED TOGETHER (2 OR MORE), THEY ARE TO BE SPACED <br />21. <br />. <br />FLOORS SHALL BE SLOPED TO FLOOR DRAINS. COORDINATE WITH PLUMBINGAND <br />AND SHALT_ BE CONNECTED TO AN EMERGENCY POWER SYSTEM (BATTERIES, UNIT <br />NO MORE THAN 2" APART. <br />STRUCTURAL DRAWINGS. IN RATED .FLOOR CONDITIONS, CONFIRM REMAINING FLOOR <br />22. ALL DRAWER GLIDES SHALL BE FULL EXTENSION. <br />EQUIPMENT OR AN ON -SITE GENERATOR) THAT WILL AUTOMATICALLY ILLUMINATE <br />THICKNESS STILL CONFORMS TO MINIMUM RATING REQUIREMENT. <br />THE EXIT SIGNS FOR A DURATION OF NOT LESS THAN 90 MINUETS. <br />5, <br />ALL ELECTRICAL OUTLETS OF 30 AMPERES OR LESS SHALL BE MOUNTED BETWEEN <br />23. ALL HINGES SHALL OPEN ±105°, EXCEPT WHERE CABINETS ARE ADJACENT TO THE <br />+15" TO BOTTOM RECEPTACLE AND +48" TO TOP OF RECEPTACLE FROM FINISH <br />22. <br />CONTRACTOR TO RUN CALCIUM CHLORIDE TEST ON ALL EXISTING OR NEW <br />WALLS. PROVIDE HINGES WHICH LIMIT THE DOOR SWING TO KEEP THE DOOR PULL <br />CONCRETE SLABS PRIOR TO INSTALLING ANY FLOORING AND COMPARE RESULTS <br />FROM DAMAGING THE WALL. <br />FLOOR. SEE NOTE 6, BELOW, FOR GENERAL MOUNTING HEIGHT <br />WITH FLOORING MANUFACTURE'S RECOMMENDED MAXIMUM CONTENT FOR <br />WARRANTIES AND ADHESIVE PRODUCTS. <br />6. <br />ALL NEW WALL MOUNTED 15, 20, AND 30 AMP OUTLETS/RECEPTACLES TO BE <br />CENTERED AT +18" A.F.F., U.O.N. <br />23. <br />PRIOR TO NEW FLOORING INSTALLATION REMOVE EXISTING FLOOR FINISHES. PATCH <br />AND REPAIR SUB -FLOOR AS REQUIRED. PREPARE FLOORS AND TRANSITIONS AS <br />7. <br />ALL TELEPHONE AND DATA CABLE TO BE TEFLON COATED PLENUM RATED CABLE, <br />REQUIRED FOR SMOOTH AND LEVEL FINISH PER APPLICABLE BUILDING CODES. <br />SUPPORTED INDEPENDENTLY FROM SUSPENDED CEILING SYSTEM. CABLING TO BE <br />SUPPLIED BY TENANT; ALL PULLS AND TERMINATIONS BY GENERAL CONTRACTOR. <br />24. <br />ALL FLOORING TRANSITIONS AMONG ALL THE DIFFERING FLOORING MATERIAL <br />SPECIFICATION TYPES ARE TO BE A FLUSH TRANSITION. <br />8. <br />LOCATIONS OF FURNITURE POWER FEEDS SHALL ACCOMMODATE CIRCUITS AND <br />WIRE PER ELECTRICAL DRAWINGS. TENANT SHALL BE RESPONSIBLE FOR <br />25. <br />FEATHER SUB -FLOOR UP FOR A) TILE FLOORING TO CARPET AND B) VINYL <br />PROVIDING FURNITURE POWER FEED, GENERAL CONTRACTOR SHALL INSTALL THE <br />FLOORING TO CARPET, FOR FLUSH INSTALLATION. <br />POWER FEED. <br />26. <br />INSTALL METAL TRANSITION STRIPS WHERE TILE MEETS ALL OTHER FLOORING <br />9. <br />WHERE DEDICATED ELECTRICAL OUTLETS ARE NOTED WITHIN THE FURNITURE <br />TYPES. PROVIDE LOW PROFILE TRANSITION STRIP WHERE ALL OTHER DIFFERENT <br />PANEL SYSTEM, THE PANEL SYSTEM SHALL ACCOMMODATE THIS REQUIREMENT. <br />FLOOR TYPES MEET, VERIFY COLOR. <br />10. <br />FLOOR OUTLETS ARE ACCEPTABLE NEXT TO SLIDING PANELS/WALLS AND OTHER <br />27. <br />CONTRACTOR TO HEAT/CHEMICAL SEAM VINYL FLOORING AS PER <br />SPECIAL CONVENIENT LOCATIONS. <br />MANUFACTURER'S SPECIFICATIONS AND SEAL ALL VINYL FLOORS PER <br />MANUFACTURER'S MAINTENANCE SPECIFICATIONS. <br />11. <br />WHERE ELECTRICAL WORK IS SPECIFIED IN CONJUNCTION WITH CABINET WORK, <br />LAMPS AND FIXTURES ARE TO BE PROVIDED BY THE GENERAL CONTRACTOR. <br />28. <br />FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CARPET <br />12. <br />CUT-OUTS FOR SWITCHES, OUTLETS, ETC. AS REQUIRED BY THE CABINET <br />INSTALLATION INSTRUCTIONS. USING ADHESIVES AND INSTALLATION METHODS <br />CONTRACTOR ARE TO BE COORDINATED WITH THE ELECTRICAL CONTRACTOR, <br />REQUIRED INSTRUCTIONS TO MAINTAIN PRODUCT'S WARRANTY. CONTACT CARPET <br />U.N.O. ALL RECEPTACLES WHERE MILLWORK OCCURS SHALL BE LOCATED PER <br />SALES REPRESENTATIVE WITH QUESTIONS PRIOR TO PROCEEDING. <br />ELEVATIONS OF THE MILLWORK ITEM IN QUESTION <br />29, <br />FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CONTOURED <br />13. <br />ALL WALL COVER PLATES SHALL BE WHITE, UNLESS BUILDING STANDARD IS <br />RUBBER BASE INSTALLATION INSTRUCTIONS USING ADHESIVES AND INSTALLATION <br />DIFFERENT, MATCH BUILDING STANDARD. <br />METHODS REQUIRED TO MAINTAIN PRODUCT'S WARRANTY. <br />14. <br />ALL SEPARATE CIRCUIT RECEPTACLES TO BE ORANGE COLOR WITH BUILDING <br />30. <br />FLOOR COVERING INSTALLER REQUIRED TO PROVIDE MINIMAL SEAMS/JOINTS AT <br />STANDARD COLOR COVER PLATE. <br />ALL LOCATIONS FOR FLOOR AND WALL BASE MATERIAL INSTALLATION. PROVIDE <br />LOW VOC, BUT HEAVY DUTY ADHESIVES TO ENDURE HEAVY FOOT TRAFFIC, CARTS <br />15. <br />POWER/SIGNAL AND REFLECTED CEILING PLANS ARE FOR THE GENERAL <br />AND TO MAINTAIN PRODUCT'S WARRANTY. <br />INFORMATION OF THE CONTRACTOR. EXACT LOCATIONS SHOULD BE VERIFIED. <br />31. <br />PRIOR TO PAINTING, WALLS MUST BE PATCHED AND REPAIRED, CLEAN AND DRY <br />16. <br />TENANT TO PROVIDE AND INSTALL THE TELEPHONE AND DATA COMMUNICATION <br />AND PROPERLY MEMBERED AND ALIGNED SO, AS TO LEAVE NO EVIDENCE OF <br />CABLING. CONTRACTOR TO COORDINATE SCHEDULING AND OTHER REQUIREMENTS <br />PATCHING OR REPAIRS. ALL SCREW AND NAIL HEADS MUST BE SET AND <br />WITH TENANT. <br />SPACKLED. ALL JOINTS MUST DE TAPED AND COVERED WITH JOINT COMPOUND. <br />JOINTS THAT ARE FILLED TO BE SANDED SMOOTH AND DUST REMOVED PRIOR TO <br />17. <br />ALL/ANY CORE DRILL LOCATIONS SHALL BE VERIFIED WITH DESIGNER PRIOR TO <br />RECEIVING NEW PAINT FINISH APPLICATION. <br />DRILLING. ALL UNUSED CORE DRILLS SHALL BE PLUGGED AND CAPPED AS <br />REQUIRED TO MAINTAIN FLOOR FIRE RATING. <br />32. <br />PRIOR TO PAINTING OVER WALL COVERING, SECURELY GLUE DOWN ANY LIFTING OR <br />BUCKLING AND HIDE ALL SEAMING OR BUMPS. <br />18. <br />ALL TELEPHONE AND COMPUTER WIRES SHALL BE PULLED BY TENANT <br />CONTRACTOR U.O.N. ELECTRICAL CONTRACTOR SHALL PROVIDE PULL WIRES AND <br />33. <br />WALLS TO HAVE AT LEAST ONE COAT OF COLORED PRIMER AND TWO COATS OF <br />BOXES AT EACH LOCATION. <br />SPECIFIED PAINT FINISH TYPE. PAINT TO BE A LOW VOC UNLESS U.O.N. HIGH <br />TRAFFIC/WEAR ABILITY WITH GOOD SCRUB AND CLEANING ABILITY. VERIFY ALL <br />19. <br />CONTRACTOR SHALL OBTAIN APPROVAL FROM ARCHITECT FOR ALL THERMOSTAT <br />WITH TENANT OR OWNER PRIOR TO PURCHASING PAINT. <br />LOCATIONS. <br />34. <br />PAINT ALL SPEAKER COVERS AND HVAC GRILLS IN GYPSUM BOARD WALLS AND <br />CEILINGS TO MATCH ADJACENT PAINT COLOR AS SPECIFIED. <br />Q' <br />Z <br />fn <br />w <br />0 <br />2 <br />0 <br />v <br />u <br />U- <br />0 <br />Lu <br />v <br />0 <br />z <br />uj <br />0 <br />D <br />0 <br />u <br />r <br />v <br />z <br />a. <br />w <br />in <br />m <br />0 <br />z <br />0 <br />r <br />u <br />y <br />a <br />z <br />0 <br />z <br />W <br />M <br />n <br />J <br />t3 <br />0 <br />0 <br />z <br />u <br />r <br />V) <br />cn <br />z <br />U) <br />z <br />w <br />z <br />,26 <br />M <br />z <br />lAj <br />Ld <br />U <br />x <br />ty <br />a <br />ld <br />F_ <br />0 <br />�c <br />z <br />0 <br />V) <br />D <br />Ld <br />m <br />i- <br />0 <br />z <br />J <br />a <br />z <br />z <br />m <br />0 <br />0 <br />Q <br />M <br />Ld <br />fy <br />9 <br />LL <br />0 <br />c� <br />0 <br />U <br />z <br />a <br />m <br />0 <br />CL <br />m <br />u <br />F <br />W <br />z <br />0 <br />a <br />v <br />u <br />z <br />=i <br />W <br />C5 <br />Ld <br />Ld <br />S <br />r <br />e� <br />E- <br />0 <br />00 <br />z <br />>41 <br />�� <br />ul <br />ul <br />c Qj <br />I <br />x <br />�s <br />i <br />I <br />SHEET <br />s <br />ff„ <br />