My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 100TH ST SW 2017 AD SYSTEMS Plans 2022-12-02
>
Address Records
>
100TH ST SW
>
2201
>
AD SYSTEMS
>
Plans
>
2201 100TH ST SW 2017 AD SYSTEMS Plans 2022-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2022 2:02:34 PM
Creation date
4/18/2022 1:49:40 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
2201
Tenant Name
AD SYSTEMS
Permit
B1709-037
Year
2017
Notes
PRE-MFG STEEL BUILDING WAREHOUSE ADDN TO EXISTING MFG FAC
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/24/2017 10:16:32 AM <br />REQUIRED INSPECTIONS, VERIFICATION AND TESTS OF SOILS <br />TYPE <br />CONTINUOUS <br />PERIODIC <br />REFERENCE STANDARD <br />IBC REFERENCE <br />VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE <br />X <br />ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY <br />VERIFY EXCAVATIONS ARE EXTENDED TO PROPER <br />X <br />DEPTH AND HAVE REACHED PROPER MATERIAL <br />PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS <br />X <br />VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESS <br />X <br />DURING PLACEMENT AND COMPACTION OF COMPACTED FILL <br />PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND <br />X <br />VERIFY THAT SITE HAS BEEN PREPARED PROPERLY <br />REQUIRED INSPECTIONS, VERIFICATION AND TESTS OF CONCRETE CONSTRUCTION <br />TYPE <br />CONTINUOUS <br />PERIODIC <br />REFERENCE STANDARD <br />IBC REFERENCE <br />INSPECT REINFORCEMENT AND VERIFY PLACEMENT <br />X <br />ACI 313 Ch. 20, 25.2, <br />1906.4 <br />25.3, 26.6.1-26.6.3 <br />REINFORCING BAR WELDING: <br />a. VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN ASTM A706 <br />X <br />AWS D1.4 <br />B. INSPECT SINGLE -PASS FILLET WELDS, MAXIMUM 5/16"; AND <br />X <br />ACI 313: 26.6.4 <br />C. INSPECT ALL OTHER WELDS <br />X <br />INSPECT ANCHORS CAST IN CONCRETE <br />X <br />ACI 316:17.8.2 <br />INSPECT ANCHORS POST -INSTALLED IN HARDEDNED CONCRETE MEMBERS (B) <br />A. ADHESIVE ANCHORS INSTALLED HORIZONTALLY OR UPWARDLY <br />X <br />ACI 316: 17.8.2.4 <br />INCLINED ORIENTAIONS TO RESIST SUSTAINED TENSION LOADS <br />B. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN (A) <br />X <br />ACI 313: 17.6.2 <br />VERIFY USE OF REQURED DESIGN MIX (F'C > 2500 PSI) <br />X <br />ACI 318: Ch. 19, <br />1904.1, 1904.2, <br />26.4.3, 26.4.4 <br />1903.2, 1906.3 <br />PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH <br />ASTM C172 <br />TESTS, PREFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE <br />X <br />ASTM C31 <br />1908.10 <br />TEMPERATURE OF THE CONCRETE <br />ACI 313: 26.4, 26.12 <br />INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER <br />X <br />ACI 313: 26.5 <br />1903.6,1906.7, <br />APPLICATION TECHNIQUES <br />1903.3 <br />VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES <br />ACI 318: 26.5.3-26.5.5 <br />1906.9 <br />INSPECT FORMWORK FOR SHAPE, LOCATION AND <br />X <br />ACI 316: 26.11.1.2(b) <br />DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED <br />NONSTRUCTURAL SLABS ON GRADE <br />NOT REQUIRED <br />NOT REQUIRED <br />1704.2.5 <br />REV <br />DATE <br />REV 0 <br />2017-09-25 <br />REV 1 <br />2017-10-25 <br />000\\ <br />oo\ <br />H PEl ),R Ml C . <br />D SYSTEMS <br />WAREHOUSE <br />EXPANSION <br />2201 100TH ST. SW <br />Stamp: <br />Drawing Title: <br />JOB #: 17FO35 <br />Drawing No: <br />PERMIT SET <br />
The URL can be used to link to this page
Your browser does not support the video tag.