My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/04/20 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/04/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 3:15:24 PM
Creation date
4/21/2022 11:28:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Public involvement coordination and meeting, if needed. <br />• Environmental permit applications, if required. <br />• Stakeholder coordination. The consultant will assist as needed. <br />• City of Everett electronic CAD standards and details. <br />1. Project Management <br />The estimated project design duration is eight (8) months, and construction is estimated <br />to start in fall of 2022. <br />The CONSULTANT will provide project management administrative services including: <br />• Project set-up and execute agreement <br />• Execution of Subconsultant agreements <br />• Preparation and delivery of monthly progress reports and invoices <br />• Record keeping and project closeout <br />Provide overall project management including: <br />• Project staff management and coordination <br />• Subconsultant management and coordination <br />• Prepare and maintain project schedule <br />• Schedule and budget monitoring <br />The CONSULTANT will manage and coordinate the project, including attendance at <br />virtual meetings with City staff. Up to 12 bi-weekly online meetings are assumed, which <br />include an initial kick-off meeting, an over -the -should review of preliminary design layout <br />and engineer's estimate, and three (3) meetings to resolve City and stakeholder <br />comments on the three (3) PS&E submittals. Up to two (2) CONSULTANT staff are <br />expected at each formal meeting. <br />All email correspondence regarding the project will include the City project manager. The <br />CONSULTANT will prepare and submit invoices and progress summaries once per <br />month by the fifth business day of each month. <br />QUALITY ASSURANCE / QUALITY CONTROL <br />The CONSULTANT will provide internal QA/QC reviews of the following major work <br />elements prior to submittal to the City. Provide senior review of 60%, 90% and final Plans, <br />specifications, estimates, and calculations prior to scheduled constructability reviews. <br />City of Everett 3 DKS <br />
The URL can be used to link to this page
Your browser does not support the video tag.